1,317 projects in states, 76.4 GW of disclosed capacity. Each record is sourced and dated. 56 sites with no stage yet are listed under Not yet verified.

Status Project Place Disclosed scale Record
Proposed Permitting
Digital Realty
Digital Realty is seeking a Mecklenburg County air quality permit for a planned data center campus on Moores Chapel Road in west Charlotte that would allow 242 diesel backup generators totaling 726...
Charlotte, Mecklenburg County, NC
Proposed Approved
Engineered Land Solutions
Engineered Land Solutions proposed the Project Delta data center on nearly 1,850 acres near the Dan River in the Walnut Cove area of Stokes County, North Carolina, where county commissioners approv...
Walnut Cove, Stokes County, NC
1 statement
Running Operational
Meta (filed as Vitesse, LLC)
Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in...
Prineville, Crook County, OR
11 buildings
Being built Under construction
Google (filed as Jupiter Star Holdings LLC)
Google, through Jupiter Star Holdings LLC, is building its first Wyoming data center campus on a 716 acre site in Switchgrass Industrial Park south of Cheyenne in Laramie County, part of a $17 bill...
Cheyenne, Laramie County, WY
716 acres
1 statement
Proposed Proposed
LightEdge
LightEdge proposed to lease 10.86 acres of municipal airport property in Ames, Story County, Iowa for a data center of about 100,000 square feet and up to 25 MW at full build (developer figures).
Ames, Story County, IA
25 MW
Running Operational
Aligned Data Centers
Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates.
Plano, Collin County, TX
3 buildings
Running Operational
Aligned Data Centers
Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates.
Abernathy, Hale County, TX
1 building
Running Operational
Centersquare
Centersquare lists a data center at Dallas, Texas among the sites it operates.
Dallas, Dallas County, TX
2 buildings
Running Operational
Centersquare
Centersquare lists a data center at Fort Worth, Texas among the sites it operates.
Fort Worth, Tarrant County, TX
1 building
Running Operational
Cologix
Cologix lists 3 data centers at Dallas, Texas among the sites it operates.
Dallas, Dallas County, TX
3 buildings
Being built Under construction
Compass Datacenters
Compass Datacenters lists a data center at Red Oak, Texas and says it is being built.
Red Oak, Ellis County, TX
4 buildings
Running Operational
CyrusOne
CyrusOne lists a data center at Allen, Texas among the sites it operates.
Allen, Collin County, TX
3 buildings
Running Operational
CyrusOne
CyrusOne lists a data center at Austin, Texas among the sites it operates.
Austin, Travis County, TX
2 buildings
Running Operational
CyrusOne
CyrusOne lists a data center at Carrollton, Texas among the sites it operates.
Carrollton, Denton County, TX
1 building
Running Operational
CyrusOne
The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit.
Fairfield, Freestone County, TX
1 building
Running Operational
CyrusOne
CyrusOne lists a data center at Houston, Texas among the sites it operates.
Houston, Harris County, TX
2 buildings
Running Operational
CyrusOne
CyrusOne lists a data center at Lewisville, Texas among the sites it operates.
Lewisville, Denton County, TX
1 building
Running Operational
CyrusOne
CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates.
San Antonio, Bexar County, TX
3 buildings
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank lists a data center at Austin, Texas among the sites it operates.
Austin, Travis County, TX
1 building
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank lists a data center at Dallas, Texas among the sites it operates.
Dallas, Dallas County, TX
3 buildings
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank operates DataBank Dallas Midtown DFW7 through legal entity DataBank Holdings, Ltd. at 6606 Lyndon B Johnson Fwy Dallas TX 75240 in Dallas, Dallas County, TX.
Dallas, Dallas County, TX
1 building
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank operates DataBank Dallas Richardson DFW2 through legal entity DataBank Holdings, Ltd. at 904 Quality Way Richardson TX 75081 in Richardson, Dallas County, TX.
Richardson, Dallas County, TX
1 building
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank operates DataBank Dallas Stemmons DFW6 through legal entity DataBank Holdings, Ltd. at 8600 Harry Hines Blvd Dallas TX 75235 in Dallas, Dallas County, TX.
Dallas, Dallas County, TX
1 building
Running Operational
DataBank
DataBank lists a data center at Houston, Texas among the sites it operates.
Houston, Harris County, TX
4 buildings
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).
Plano, Collin County, TX
9 MW
Being built Under construction
DataBank (filed as DataBank Holdings, Ltd.)
DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).
Red Oak, Ellis County, TX
480 MW
Running Operational
DataBank (filed as DataBank Holdings, Ltd.)
DataBank lists a data center at Waco, Texas among the sites it operates.
Waco, McLennan County, TX
1 building
Running Operational
Digital Realty
Digital Realty lists 2 data centers at Austin, Texas among the sites it operates.
Austin, Travis County, TX
2 buildings
Running Operational
Digital Realty (filed as Digital Realty Trust, L.P.)
Digital Realty operates Digital Realty Carrollton DFW19 4025 Midway Road through legal entity Digital Realty Trust, L.P.
Carrollton, Denton County, TX
1 building
Running Operational
Digital Realty (filed as Digital Realty Trust, L.P.)
Digital Realty operates Digital Realty Carrollton DFW18 2440 Marsh Lane through legal entity Digital Realty Trust, L.P.
Carrollton, Dallas County, TX
1 building
Running Operational
Digital Realty
Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates.
Dallas, Dallas County, TX
3 buildings
Running Operational
Digital Realty
Digital Realty lists a data center at Lewisville, Texas among the sites it operates.
Lewisville, Denton County, TX
1 building
Running Operational
Digital Realty
Digital Realty lists 2 data centers at Houston, Texas among the sites it operates.
Houston, Harris County, TX
2 buildings
Running Operational
Digital Realty
Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates.
Richardson, Dallas County, TX
7 buildings
Running Operational
EdgeConneX
The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.
Katy, Harris County, TX
1 building
Running Operational
Edged
Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system.
Irving, Dallas County, TX
1 building
Running Operational
Element Critical
Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).
Austin, Travis County, TX
1 building
Running Operational
Equinix
Equinix lists a data center at Plano, Texas among the sites it operates.
Plano, Collin County, TX
1 building
Running Operational
Equinix
Equinix lists a data center at Irving, Texas among the sites it operates.
Irving, Dallas County, TX
1 building
Running Operational
Equinix (filed as Equinix LLC)
Equinix lists 6 data centers at Dallas, Texas among the sites it operates.
Dallas, Dallas County, TX
6 buildings
Running Operational
Equinix
Equinix lists a data center at Houston, Texas among the sites it operates.
Houston, Harris County, TX
1 building
Running Operational
Flexential
Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).
Plano, Collin County, TX
1 building
Running Operational
Flexential (filed as Flexential Corp.)
Flexential operates Flexential Dallas Richardson RCH01 through legal entity Flexential Corp. at 3010 Waterview Pkwy Richardson TX 75080 in Richardson, Collin County, TX.
Richardson, Collin County, TX
1 building
Being built Under construction
Crusoe (filed as GN DC1, LLC)
Google lists a data center at Armstrong County, Texas and says it is being built.
Claude, Armstrong County, TX
110 acres
Being built Under construction
Google
Google lists a data center at Haskell County, Texas and says it is being built.
Haskell, Haskell County, TX
2 buildings
Running Operational
Google (filed as Design LLC)
Google lists a data center at Midlothian, Texas among the sites it operates.
Midlothian, Ellis County, TX
375 acres
Being built Under construction
Google
Google lists a data center at Pampa, Texas and says it is being built.
Pampa, Gray County, TX
1 building
Running Operational
Google
Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.
Pflugerville, Travis County, TX
1 building
Being built Under construction
Google
Google lists a data center at Red Oak, Texas among the sites it operates.
Red Oak, Ellis County, TX
1 building
Being built Under construction
Google
Google lists a data center at Wilbarger County, Texas and says it is being built.
Vernon, Wilbarger County, TX
1 building

Blank cell: not disclosed by any source on file. Figures are shown as the source stated them, with the basis under each.

Showing 1 to 50 of 1,317

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

Researcher view · 1,317 verified records in states · 76.4 GW disclosed capacity · raw stages and ISO dates

Commercial and bulk data