Engineered Land Solutions proposed the Project Delta data center on nearly 1,850 acres near the Dan River in the Walnut Cove area of Stokes County, North Carolina, where county commissioners approved a rezoning 3 to 2 on September 14, 2026 and residents and community groups filed a second Superior Court lawsuit on November 12, 2026. [1]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Stokes County fixed its paperwork, not its problems.(November 13, 2026) [2]
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Delta.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Stokes County and Walnut Cove about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Stokes County | Residents and community groups filed a second lawsuit in Stokes County Superior Court challenging the county commissioners' September 14, 2026 vote to rezone nearly 1,850 acres near the Dan River for the Project Delta data center proposed by Engineered Land Solutions. Plaintiffs include 16 residents, the National Hairston Clan, CleanAIRE NC, the Dan River Basin Association and 7 Directions of Service, represented by the Southern Coalition for Social Justice and the Southern Environmental Law Center. A dental practice and its landlord filed a separate suit at the same time. | southerncoalition.org (opens in a new tab) | |
| Stokes County | Stokes County commissioners voted 3 to 2 to move forward with a rezoning proposal for a hyperscale data center | wxii12.com (opens in a new tab) | |
| Stokes County | Commissioners voting against rezoning: Brad Chandler and Wayne Barneycastle | thestokesnews.com (opens in a new tab) | |
| Stokes County | Commissioners voting for rezoning: Sonya Cox, Keith Wood, and Rick Morris | thestokesnews.com (opens in a new tab) | |
| Stokes County | Stokes County commissioners voted three to two on September 14 to approve rezoning for Walnut Cove area data center proposed by Engineered Land Solutions | thestokesnews.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
(content date)
Residents and community groups filed a second lawsuit in Stokes County Superior Court challenging the county commissioners' September 14, 2026 vote to rezone nearly 1,850 acres near the Dan River for the Project Delta data center proposed by Engineered Land Solutions. Plaintiffs include 16 residents, the National Hairston Clan, CleanAIRE NC, the Dan River Basin Association and 7 Directions of Service, represented by the Southern Coalition for Social Justice and the Southern Environmental Law Center. A dental practice and its landlord filed a separate suit at the same time.
[2] southerncoalition.org, also [3] wfae.org, also [4] thestokesnews.com
· Status: approved (content date)
Stokes County commissioners voted 3 to 2 on September 14, 2026 to approve a rezoning near the Dan River in the Walnut Cove area for the Project Delta data center proposed by Engineered Land Solutions.
Nearest records are not computed for a record placed at the center of its town. Browse all data centers in North Carolina.
Answered directly from the verified filings and local actions on this page.
Engineered Land Solutions is the developer, southerncoalition.org (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is approved, since September 14, 2026. The newest entry, November 12, 2026: Residents and community groups filed a second lawsuit in Stokes County Superior Court challenging the county commissioners' September 14, 2026 vote to rezone nearly 1,850 acres near the Dan River for the Project Delta data center proposed by Engineered Land Solutions. [2]
Stokes County: Residents and community groups filed a second lawsuit in Stokes County Superior Court challenging the county commissioners' September 14, 2026 vote to rezone nearly 1,850 acres near the Dan River for the Project Delta data center proposed by Engineered Land Solutions (November 12, 2026, southerncoalition.org (opens in a new tab)); and Stokes County: Stokes County commissioners voted 3 to 2 to move forward with a rezoning proposal for a hyperscale data center (reported September 17, 2026, wxii12.com (opens in a new tab)). 5 events are on the county's rows; a rule about the area is not a decision about this record.
4 sources on file.
This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Project Delta. Last verified November 16, 2026. https://datacenterrecord.org/projects/project-delta-walnut-cove-nc. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified and first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Project Delta
Data Center Record, "Project Delta", https://datacenterrecord.org/projects/project-delta-walnut-cove-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.