Data Center Record tracks 69 facilities across California in the California Independent System Operator (CAISO) regional power market.

Modeled wholesale electricity price effect and regional load

2024 to 2025 wholesale price effect
8.6 percent (+$3.70 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
2028 projected wholesale price effect
17.2 percent (+$6.96 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
Data center share of regional electricity load (2025)
3.2 percent, modeled data center load share, Dallas Fed WP 2606r1, third party estimate.
Fixed cost share of retail electricity bill
72.9 percent (s = 0.729), retail pass through parameter, Dallas Fed WP 2606r1, third party estimate.

States in California Independent System Operator

State Tracked records (CC BY-NC 4.0) State scorecard
California 69 View California record

Tracked facilities in California Independent System Operator (69)

Facility State Place Stage Stated power
AISO Solar Powered Colocation Data Center Romoland CA Romoland, Riverside County running 1 MW
Amazon Web Services Gilroy Data Center Campus CA Gilroy, Santa Clara County approved 98 MW
Amazon Web Services Hayward Data Center (SFO11) CA Hayward, Alameda County running 24 MW
Avaio Digital Pittsburg Bay Area Data Center Campus CA Pittsburg, Contra Costa County approved 96 MW
Ayera Technologies Modesto Data Center CA Modesto, Stanislaus County running 2 MW
Centersquare Orange County Irvine Campus (LAX3 and LAX5) CA Irvine, Orange County running 16 MW
Centersquare Silicon Valley Santa Clara Campus (SFO1 and SFO2) CA Santa Clara, Santa Clara County running 43 MW
Centersquare Los Angeles El Segundo Campus (LAX1 and LAX2) CA Los Angeles, Los Angeles County running 18 MW
Cologix Silicon Valley Santa Clara Data Center (SV1) CA Santa Clara, Santa Clara County running 9 MW
CoreSite Los Angeles One Wilshire Data Center (LA1) CA Los Angeles, Los Angeles County running 18 MW
CoreSite Los Angeles Downtown Campus (LA2 and LA3) CA Los Angeles, Los Angeles County running 50 MW
CoreSite Milpitas Data Center (SV2) CA Milpitas, Santa Clara County running 12 MW
CoreSite San Jose Downtown Data Center (SV1) CA San Jose, Santa Clara County running 8 MW
CoreSite Santa Clara Campus (SV3, SV4, SV7, SV8, and SV9) CA Santa Clara, Santa Clara County running 85 MW
DataBank Orange County Irvine Campus (SNA1 and SNA2) CA Irvine, Orange County running 10 MW
DataBank Los Angeles Carrier Hotel Data Center (LAX1) CA Los Angeles, Los Angeles County running 8 MW
DataBank San Diego Data Center (SAN1) CA San Diego, San Diego County running 6 MW
Prime Data Centers and DataBank Vernon Campus (LAX2) CA Vernon, Los Angeles County being built 33 MW
Digital Realty Burbank Data Center Campus (BUR10 and BUR11) CA Burbank, Los Angeles County running 8 MW
Digital Realty El Segundo Data Center Campus (LAX11 and LAX12) CA El Segundo, Los Angeles County running 32 MW
Digital Realty Los Angeles Carrier Hotel (LAX10 / 600 West 7th Street) CA Los Angeles, Los Angeles County running 24 MW
Digital Realty Oakland Data Center Campus (OAK10) CA Oakland, Alameda County running 12 MW
Digital Realty San Francisco Carrier Hotel Campus (SFO10 and SFO12) CA San Francisco, San Francisco County running 42 MW
Digital Realty Santa Clara Silicon Valley Campus (SJC10 through SJC37) CA Santa Clara, Santa Clara County running 180 MW
Digital Realty Fremont Data Center (SJC22) CA Fremont, Alameda County running 12 MW
EdgeConneX San Diego Data Center (SDG01) CA San Diego, San Diego County running 8 MW
EdgeConneX Santa Clara Data Center (SVC01 and SVC02) CA Santa Clara, Santa Clara County running 12 MW
EdgeConneX Sacramento Rancho Cordova Data Center (SAC01) CA Rancho Cordova, Sacramento County running 8 MW
EdgeCore Silicon Valley Laurelwood Data Center Campus CA Santa Clara, Santa Clara County running 72 MW
Equinix El Segundo Data Center Campus (LA3 and LA4) CA El Segundo, Los Angeles County running 28 MW
Equinix LA1 Los Angeles Carrier Hotel Data Center CA Los Angeles, Los Angeles County running 18 MW
Equinix LA7 Torrance Data Center CA Torrance, Los Angeles County running 10 MW
Equinix San Jose Great Oaks and North San Jose Campus (SV1, SV3, SV5, SV10, SV11, and SV12x) CA San Jose, Santa Clara County running 96 MW
Equinix Santa Clara Campus (SV2, SV14, SV15, SV16, and SV17) CA Santa Clara, Santa Clara County running 52 MW
Equinix SV4 Sunnyvale Data Center CA Sunnyvale, Santa Clara County running 10 MW
Equinix SV8 Palo Alto Internet Exchange Data Center CA Palo Alto, Santa Clara County running 4 MW
EZ Network Systems Stockton Data Center CA Stockton, San Joaquin County running 2 MW
Goodman Group Los Angeles Vernon Data Center (LAX01) CA Vernon, Los Angeles County being built 32 MW
Google North San Jose Midpoint and Alviso Data Center Campus CA San Jose, Santa Clara County approved 200 MW
H5 Data Centers San Luis Obispo Subsea Cable Landing Hub CA San Luis Obispo, San Luis Obispo County running 6 MW
Hurricane Electric Fremont Carrier Hotel Campus (FMT1 and FMT2) CA Fremont, Alameda County running 24 MW
Imperial Valley Computer Manufacturing AI Data Center Proposal CA Imperial, Imperial County proposed 330 MW
LightEdge San Diego Campus (SAN1 and SAN2) CA San Diego, San Diego County running 10 MW
Modesto East Claus Road Hyperscale Data Center Proposal CA Modesto, Stanislaus County proposed
New York GreenCloud Ione Biomass Powered Data Center Proposal CA Ione, Amador County proposed
NorthPoint Development Fairfield Solano Data Center Campus Proposal CA Fairfield, Solano County proposed 150 MW
Novva Data Centers San Francisco Facility CA San Francisco, San Francisco County running 12 MW
Oracle Cloud San Jose US West Region Data Center CA San Jose, Santa Clara County running 16 MW
Panattoni West Roseville Innovation Center Data Center Proposal CA Roseville, Placer County proposed 100 MW
Prime Data Centers Sacramento McClellan Campus (SAC01 and SAC02) CA Sacramento, Sacramento County running 28 MW
Prime Data Centers Santa Clara Campus (SJC01) CA Santa Clara, Santa Clara County running 9 MW
QTS Sacramento Data Center CA Sacramento, Sacramento County running 18 MW
QTS Santa Clara Data Center Campus (SJC1 and SJC2) CA Santa Clara, Santa Clara County running 25 MW
NTT Global Data Centers Sacramento Campus (CA1, CA2, and CA3) CA Sacramento, Sacramento County running 58 MW
ScaleMatrix San Diego High Density Data Center (US West 01) CA San Diego, San Diego County running 8 MW
Serverfarm Los Angeles El Segundo Data Center (LAX1) CA El Segundo, Los Angeles County running 18 MW
Serverfarm Santa Clara Data Center (SV1) CA Santa Clara, Santa Clara County running 14 MW
STACK Infrastructure Silicon Valley San Jose Campus (SVY01) CA San Jose, Santa Clara County running 32 MW
STACK Infrastructure Silicon Valley Santa Clara Campus (SVY02) CA Santa Clara, Santa Clara County running 48 MW
T5 Data Centers Silicon Valley Newark Facility CA Newark, Alameda County running 14 MW

A blank cell means no source states a figure.

All 23 regional markets in Dallas Fed WP 2606r1

Region States Tracked records (CC BY-NC 4.0) 2024 to 2025 wholesale price effect 2028 projected wholesale price effect
Northwest Power Pool (NWPP) WA, OR, ID, MT, NV, UT 105 15.4 percent (+$5.68 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 25.9 percent (+$7.77 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC Virginia and Carolina North (SRVC-N) VA, NC 55 15.0 percent (+$5.22 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 27.6 percent (+$9.76 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
WECC California (CAMX) CA 69 8.6 percent (+$3.70 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 17.2 percent (+$6.96 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
MRO West (MROW) IA, MN, ND, NE, SD 76 12.1 percent (+$3.45 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 15.7 percent (+$4.59 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
ERCOT All (ERCT) TX 67 12.6 percent (+$3.15 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 28.0 percent (+$6.10 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC Virginia and Carolina South (SRVC-S) NC, SC 46 7.5 percent (+$3.01 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 14.7 percent (+$4.94 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
WECC Southwest (AZNM) AZ, NM 41 8.6 percent (+$2.93 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 14.7 percent (+$4.32 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
WECC Rockies (RMPA) CO, WY 42 7.7 percent (+$2.51 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 12.2 percent (+$3.76 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
NPCC NYC and Westchester (NYCW) NY 13 5.2 percent (+$2.46 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 6.0 percent (+$2.63 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
NPCC Long Island (NYLI) NY 4 4.5 percent (+$2.40 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 5.3 percent (+$2.62 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
RFC West (RFCW) IN, OH, PA, WV, IL 134 6.7 percent (+$2.29 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 15.7 percent (+$5.11 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
NPCC Upstate New York (NYUP) NY 15 5.3 percent (+$2.14 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 8.7 percent (+$3.34 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC Tennessee Valley (SRTV) KY, TN 27 5.8 percent (+$2.03 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 8.7 percent (+$2.91 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SPP North (SPNO) KS, NE, MO 8 6.5 percent (+$1.87 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 8.2 percent (+$2.54 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
RFC East (RFCE) DC, DE, MD, NJ, PA 127 5.1 percent (+$1.81 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 13.3 percent (+$4.61 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC South (SRSO) AL, GA 51 4.2 percent (+$1.47 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 5.3 percent (+$1.73 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC Midwest (SRMW) IL, MO 28 4.7 percent (+$1.46 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 7.0 percent (+$2.28 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
MRO East (MROE) WI, MI 22 4.0 percent (+$1.39 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 7.9 percent (+$2.60 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
NPCC New England (NEWE) CT, MA, ME, NH, RI, VT 34 2.4 percent (+$1.28 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 3.1 percent (+$1.71 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
RFC Michigan (RFCM) MI 25 3.8 percent (+$1.27 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 8.8 percent (+$2.89 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SPP South (SPSO) OK, AR, LA, TX 16 3.1 percent (+$0.99 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 3.5 percent (+$1.12 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
SERC Mississippi Valley (SRMV) AR, LA, MS 26 3.0 percent (+$0.93 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 4.7 percent (+$1.48 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.
FRCC All (FRCC) FL 33 1.0 percent (+$0.42 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. 0.8 percent (+$0.34 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.

Wholesale price effects are third party estimates from Dallas Fed WP 2606r1 (opens in a new tab) (March 2026, revised October 2026). Tracked record counts are Data Center Record rows licensed under CC BY-NC 4.0.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

What researchers have found

These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data