An act sits on the day it happened: the day its own sentence names, or the day its source gives for it. An act the record knows only from the date of the article that reported it sits under that article's month, one tap away, marked Reported with the article's date. So do background, plans and statements, which are not acts. The same act reported by several sources is one line with the reports behind it, on its day where any of them dates it. The milestones alone, for every state, are on the timeline.

88 acts on the line for Pennsylvania, from 250 dated lines in the records' histories and the scorecard. 49 more acts are dated only by the article that reported them and sit under their month. 28 lines report an act already listed. 85 lines are background, plans or statements. 14 lines sit on a date other than the one they were filed under, because their own sentence names the day, the month or the year it happened; each says so. Where a line sits is read from its own words and the row is never changed (how dates are read).

Narrow the acts
Kind
Topic
Developer
17 more

Each count is the number of lines on this page the chip keeps. Topics are matched from the words of each line and are a finding aid, not a fact about the event.

2026 70 acts on the line from 92 reports; 49 reported, dated only by the article; 85 lines of background, plans and statements

November 2026 No acts on the line; 1 line of background, plans and statements

Also on the record for November 2026, not acts of their own: 1 line of background, plans and statements
  1. Pennsylvania

    Public Utility Commission to hold November 17 technical conference on utility costs driven by AI data centers

    paenvironmentdaily.blogspot.com (opens in a new tab) (a planned date)

October 2026 4 acts on the line from 5 reports; 5 reported; 1 line of background, plans and statements

  1. Moratorium Pennsylvania

    Pennsylvania House of Representatives voted 202-1 on House Bill 2674 to prohibit data centers from obtaining public utility status.

    mychesco.com (opens in a new tab), news outlet

  2. Cancellation cancelled MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    Developer withdrew applications for seven proposed data centers in King of Prussia, canceling scheduled zoning hearing.

    6abc.com (opens in a new tab), local outlet

  3. Pennsylvania

    Pennsylvania launched a public data center permit tracker operated by the Department of Environmental Protection showing proposed data center projects and their environmental permit status

    newsweek.com (opens in a new tab), national outlet

    1 more report of this
    1. Reported October 13 Pennsylvania recently launched a public Data Center Permit Tracker showing proposed projects, their locations and status of associated environmental permits. delawareonline.com (opens in a new tab)
  4. Pennsylvania

    House Bill 2674, sponsored by state Rep. Chris Pielli, D Chester, was approved by the House Consumer Protection, Technology & Utilities Committee and advances to the full House

    mychesco.com (opens in a new tab), news outlet

Reported in October 2026, dated only by the article that carried them: 5 acts
  1. Moratorium adopted Hazle Township, Pennsylvania

    Hazle Township enacted a municipal moratorium on the data center project

    theguardian.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  2. Hearing Pennsylvania

    Gov. Josh Shapiro issued an executive order requiring developers to meet stricter commitments before the state reviews their permit applications.

    wtae.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  3. Statement Pennsylvania

    Governor Josh Shapiro announced an executive order requiring data center developers to pay the full cost of all energy needed to power their project while meeting environmental, transparency and community benefit requirements.

    delawareonline.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  4. Pennsylvania

    Governor Josh Shapiro issued Executive Order 2026-05 to protect Pennsylvania consumers from data center impacts

    newsweek.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  5. Approval Swatara Township, Pennsylvania

    Swatara Township Board of Commissioners approved community benefits agreements for Highlands West and Highlands East data centers

    local21news.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for October 2026, not acts of their own: 1 line of background, plans and statements
  1. East Buffalo Township, Pennsylvania

    East Buffalo Township scheduled public hearing for October 12, 2026 at 5:30 p.m. to consider data center ordinance for final approval

    dailyitem.com (opens in a new tab) (a planned date)

September 2026 15 acts on the line from 19 reports; 33 reported; 57 lines of background, plans and statements

  1. Pennsylvania

    On Tuesday, lawmakers in the Pennsylvania House and Senate backed separate proposals related to data centers, including one that would bar non disclosure agreements for public agencies.

    tribdem.com (opens in a new tab), news outlet (the weekday its sentence names, the last before the report; filed under Sep 30, 2026)

  2. Approval Pennsylvania

    Senate Bill 1408 was unanimously approved by the Senate Communications and Technology Committee on September 29, 2026, prohibiting use of non disclosure agreements between data center developers and local governments and state agencies

    news-graphic.com (opens in a new tab), news outlet

    2 more reports of this
    1. Sep 29 Senate Bill 1408 unanimously approved by the Senate Communications and Technology Committee on September 29, 2026, prohibiting non disclosure agreements between data center developers and local governments and state agencies cbs19news.com (opens in a new tab)
    2. Oct 1 Pennsylvania Senate Communications and Technology Committee approved Senate Bill 1408 sponsored by Senator Tracy Pennycuick prohibiting non disclosure agreements between data centers and local governments and state agencies. tristatealert.com (opens in a new tab)
  3. Ordinance Newtown Township, Pennsylvania

    Newtown Township planning commission recommended an ordinance that would set limits on data center development

    audacy.com (opens in a new tab), national outlet

  4. Filing Lancaster AI Hub West, Lancaster, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on September 25, 2026; its tracker lists the project as permits under review (3 permits: 2 pending, 1 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  5. Filing waiting on permits Newport Ridge Data Center, Newport Township, Pennsylvania

    Newport Township issued zoning permits for 15 closed loop data center buildings powered by three natural gas generation facilities, with seven sited in the mixed use zone and eight in the industrial zone.

    citizensvoice.com (opens in a new tab), news outlet

  6. Groundbreaking being built Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Groundbreaking held September 10 for Project Phoenix data center complex in Shippingport

    timesonline.com (opens in a new tab), news outlet (the day its own sentence names; filed under Sep 13, 2026)

    2 more reports of this
    1. Sep 10 Groundbreaking held September 10 for Project Phoenix data center campus keystonenewsroom.com (opens in a new tab)
    2. Reported September 14 Groundbreaking held for Project Phoenix data center complex in Shippingport beavercountyradio.com (opens in a new tab)
  7. Wyoming County, Pennsylvania

    Amended SALDO takes effect on September 9, 2026.

    wcexaminer.com (opens in a new tab), local outlet (the day its own sentence names; filed under Sep 8, 2026)

  8. Pennsylvania

    Pennsylvania Public Utility Commission voted 5-0 Wednesday to begin updating emergency electric load control rules focusing on customer curtailment order during grid conditions

    local21news.com (opens in a new tab), local outlet

  9. Ordinance Wyoming County, Pennsylvania

    Wyoming County Commissioners approved an amendment to the SALDO on September 8, 2026 to regulate high intensity nonresidential land developments such as data centers, applying to commercial projects 10,000 square feet or larger.

    wcexaminer.com (opens in a new tab), local outlet

  10. running TECfusions Keystone Connect AI Data Center, New Kensington, Pennsylvania

    TECfusions' Building J is live and providing computing power to a tenant, with township permits for work inside the building and a land development plan for its electrical and mechanical upgrades approved on August 5, 2026.

    keystonenewsroom.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  11. proposed Smithfield Gateway Project, Smithfield Township, Pennsylvania

    The proposed Smithfield Gateway data center is a 500,000 square foot building.

    lehighvalleylive.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  12. Scranton Materials Data Center, Ransom Township, Pennsylvania

    Mudiita Land Venture LLC purchased 528.6 acres in Ransom Township near Old Forge for a planned hyperscale data center campus, on land also eyed for a pumped storage hydroelectric project.

    thetimes-tribune.com (opens in a new tab), local outlet

  13. Filing waiting on permits PAX-1 Data Center, Middlesex Township, Pennsylvania

    Middlesex Township supervisors approved PAX-1 data center development matters.

    cumberlink.com (opens in a new tab), news outlet

  14. stalled PAX-1 Data Center, Middlesex Township, Pennsylvania

    A judge granted a partial victory to opponents of a data center in Cumberland County.

    pennlive.com (opens in a new tab), local outlet

  15. being built Amazon Luzerne Data Center (Susquehanna Campus), Salem Township, Pennsylvania

    Amazon's data center project in Salem Township is in construction.

    thecentersquare.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

Reported in September 2026, dated only by the article that carried them: 33 acts
  1. Moratorium adopted Hazle Township, Pennsylvania

    Hazle Township's government rejected the data center project on zoning grounds and placed a temporary moratorium on data center construction

    breitbart.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  2. Indiana County, Pennsylvania

    Indiana County Conservation District issued two PAG-02 Stormwater General Permits (PAC320065 and PAC320066) to Homer City Generation LP for AI Data Center/Power Plant Complex in Center and Blacklick Townships, Indiana County.

    paenvironmentdaily.blogspot.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  3. Rate rule Pennsylvania

    The PUC approved a settlement in PPL Electric Utilities' rate case that requires data centers to make an annual contribution to customer assistance programs.

    spotlightpa.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  4. Salem Township, Pennsylvania

    DEP published notice inviting comments on NPDES Water Quality Permit for Amazon Data Services ADS Berwick Data Center in Salem Township, Luzerne County

    paenvironmentdaily.blogspot.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  5. Lackawanna County, Pennsylvania

    Lackawanna County Commissioners approved contract for AI data center health impact study

    paenvironmentdaily.blogspot.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  6. Philadelphia, Pennsylvania

    Mayor Cherelle Parker signed an executive order to create a task force to guide data center regulations.

    whyy.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  7. Groundbreaking Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Aligned breaks ground on Project Phoenix data center campus in Shippingport

    datacenterdynamics.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

  8. Pennsylvania

    Amazon receives discount on 6% sales and use tax on equipment it has pledged to buy, store or use in Pennsylvania

    politicspa.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  9. Statement Pennsylvania

    A report commissioned by Pennsylvania utility regulators examined scenarios in which the regional electricity grid would fall short of demands six times per decade on average if new power plants are built over the next 15 years

    penncapital-star.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  10. Moratorium Pennsylvania

    Pennsylvania introduced SB 1359 and HB 2533 for three year moratorium and impact studies.

    mashable.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  11. Groundbreaking Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix broke ground as a three facility, 2 gigawatt campus

    washingtonexaminer.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  12. Ordinance Wellsboro, Pennsylvania

    The amendment passed unanimously and now requires all data centers to comply with ordinances about light levels, water usage and environmental impact

    weny.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  13. Pennsylvania

    Pennsylvania has pulled datacenters out of fast track permitting and made state permits conditional on new guardrails

    newsletter.semianalysis.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

  14. Statement Pennsylvania

    Pennsylvania Public Utility Commission released independent analysis warning rapid data center development could impact electricity reliability

    abc27.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 14 Pennsylvania PUC released a study warning data centers could pose serious risks to electric grid reliability wgal.com (opens in a new tab)
  15. Pennsylvania

    Commission unanimously adopted motion by Vice Chair Kimberly Barrow addressing PJM proposed RBP and Interim Resource Adequacy Service

    paenvironmentdaily.blogspot.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  16. Moratorium Philadelphia, Pennsylvania

    Activists rallied at Philadelphia City Hall calling for data center moratorium

    6abc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  17. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Three building campus featuring closed loop cooling system requiring zero water for operational cooling

    keystonenewsroom.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  18. Denial Upper Merion, Pennsylvania

    Upper Merion Township board rejected proposal for five data centers totaling over 4.6 million square feet relying on natural gas turbines and diesel backup generators

    northeasttimes.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  19. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Three building campus built on former Bruce Mansfield coal fired power plant site in Shippingport Industrial Park

    timesonline.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

    2 more reports of this
    1. Reported September 14 Project Phoenix built on former Bruce Mansfield coal fired power plant site beavercountyradio.com (opens in a new tab)
    2. Reported September 14 Project Phoenix built on former Bruce Mansfield coal fired power plant site in Shippingport Industrial Park keystonenewsroom.com (opens in a new tab)
  20. Moratorium adopted Pennsylvania

    Pennsylvania Governor Josh Shapiro imposed moratorium on data centers not covering their own power needs

    reuters.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  21. Pennsylvania

    Pennsylvania PUC voted unanimously to approve motions for emergency curtailment rule updates and technical conference on data center cost allocation

    utilitydive.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 11 Pennsylvania PUC voted unanimously to approve two motions on emergency curtailment rules and cost allocation for data centers utilitydive.com (opens in a new tab)
  22. Pennsylvania

    Pennsylvania Public Utility Commission voted 5-0 to establish a Ratemaking Working Group to examine potential changes to utility ratemaking practices

    dailyenergyinsider.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 11 PUC established Ratemaking Working Group to examine return on equity issues and transparency in rate cases utilitydive.com (opens in a new tab)
  23. Indiana County, Pennsylvania

    Indiana County Planning Commission voted to table Amazon Web Services application for data centers in Center and Black Lick Townships

    wccsradio.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  24. Indiana County, Pennsylvania

    Tabling decision triggers 90 day investigation period for Planning Commission review

    wccsradio.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  25. Ordinance Wyoming County, Pennsylvania

    Wyoming County commissioners voted to formally adopt an amendment to the county's Subdivision and Land Development Ordinance for data center development

    rocket-courier.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  26. Litigation Lancaster, Pennsylvania

    Lancaster Residents Against Glut and Exhaust appealed second data center approval at 216 Greenfield Road after city planning commission granted conditional preliminary approval

    thecooldown.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  27. Denial North Coventry, Pennsylvania

    North Coventry supervisors voted unanimously against a proposal to put a small scale data center at the former Coventry Mall site

    pottsmerc.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  28. Moratorium Pennsylvania

    Senator Katie Muth introduced a bill calling for a 3 year moratorium on data center development

    dailykos.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  29. Hearing Smithfield Township, Pennsylvania

    Smithfield Township postponed a conditional use hearing on the data center development that was publicly advertised.

    lehighvalleylive.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  30. Filing Smithfield Gateway Project, Smithfield Township, Pennsylvania

    Revised documents submitted include traffic statements, acoustical evaluations of sound emissions, and emergency response plans.

    lehighvalleylive.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  31. Archbald, Pennsylvania

    Mid Valley School District issued a request for proposals for a baseline environmental sound and noise study of school complex on Underwood Road in Throop.

    thetimes-tribune.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  32. Ordinance Pennsylvania

    Pennsylvania House passed legislation to codify GRID standards, but Senate did not act

    datacenterfrontier.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

  33. Pennsylvania

    Governor Shapiro issued an executive order affecting data center project scrutiny at local level

    theconversation.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for September 2026, not acts of their own: 57 lines of background, plans and statements
  1. Pennsylvania

    Governor Josh Shapiro signed an executive order this summer that set guardrails for data center development and eliminated fast track permitting for data centers

    nbcphiladelphia.com (opens in a new tab) (an act at a time its sentence does not give)

  2. Pennsylvania

    Pennsylvania's latest budget included transparency measures for data centers on power and water usage

    nbcphiladelphia.com (opens in a new tab) (no act in the sentence)

  3. Pennsylvania

    Pennsylvania municipalities are rushing to ready townships for data center proposals while opposition remains

    cbsnews.com (opens in a new tab) (a description, not an act)

  4. Blair County, Pennsylvania

    State legislators hosting informational session on data center impacts September 26, 2026 in Blair County from 6:30 to 8 p.m.

    wjactv.com (opens in a new tab) (no act in the sentence)

  5. Pennsylvania

    Pennsylvania regulators have issued guidelines on how large data centers should pay into customer assistance programs, though the guidance is not binding.

    spotlightpa.org (opens in a new tab) (a description, not an act)

  6. Archbald, Pennsylvania

    Archbald Borough to continue hearings on Project Green Mountain AI data center complex on September 30

    paenvironmentdaily.blogspot.com (opens in a new tab) (a description, not an act)

  7. Luzerne County, Pennsylvania

    Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County

    paenvironmentdaily.blogspot.com (opens in a new tab) (no act in the sentence)

  8. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Shippingport Industrial Park site is adjacent to Shippingport Power Station, a former coal power plant being redeveloped into natural gas energy campus

    datacenterdynamics.com (opens in a new tab) (a description, not an act)

  9. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix site is located in Shippingport Industrial Park, Beaver County, 30 miles northwest of Pittsburgh

    datacenterdynamics.com (opens in a new tab) (a description, not an act)

  10. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix will use dedicated on site power source rather than local electrical grid

    datacenterdynamics.com (opens in a new tab) (a plan or a schedule, not an act yet)

  11. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix is a 2GW data center campus with three facilities

    datacenterdynamics.com (opens in a new tab) (a description, not an act)

  12. Pennsylvania

    Pennsylvania governor is focusing on requiring new data centers to bring their own power sources as part of their projects following a recent executive order

    wgal.com (opens in a new tab) (a description, not an act)

  13. Pennsylvania

    Stacy Garrity vowed to pause data center developments if elected in Pennsylvania governor race

    bostonglobe.com (opens in a new tab) (a statement; who said what is on the statements pages)

  14. Pennsylvania

    Advocates and legislators on both sides of the aisle are pushing to repeal the tax subsidy

    politicspa.com (opens in a new tab) (a description, not an act)

  15. Pennsylvania

    The report examined a scenario in which no new data centers are built after 2026, described as the only scenario in which PJM is able to achieve its reliability goal

    penncapital-star.com (opens in a new tab) (a description, not an act)

  16. Lehigh County, Pennsylvania

    South Whitehall Township in Lehigh County facing community opposition to a data center proposal

    cbsnews.com (opens in a new tab) (a description, not an act)

  17. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    On site natural gas power generation will feed the servers and eventually send surplus electricity back to PJM grid

    washingtonexaminer.com (opens in a new tab) (a plan or a schedule, not an act yet)

  18. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix site is 660 acres on the former Bruce Mansfield coal plant footprint

    washingtonexaminer.com (opens in a new tab) (a description, not an act)

  19. Wellsboro, Pennsylvania

    Data centers can only be constructed in the Commercial Manufacturing district

    weny.com (opens in a new tab) (a description, not an act)

  20. Pennsylvania

    A provision of the Municipalities Planning Code dating to 2000 already directed Commonwealth agencies to consider local zoning and comprehensive plans when reviewing development applications

    broadandliberty.com (opens in a new tab) (a plan or a schedule, not an act yet)

  21. Pennsylvania

    House Bill 2650 would have made GRID mandatory by statute but passed the House and died without a Senate vote

    broadandliberty.com (opens in a new tab) (a plan or a schedule, not an act yet)

  22. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix is a 2 GW three facility campus in Pennsylvania that has broken ground.

    stocktwits.com (opens in a new tab) (a description, not an act)

  23. Pennsylvania

    PUC is implementing Act 45 of 2025 providing accountability layer for Pennsylvania utility load forecasts submitted to PJM

    cpbj.com (opens in a new tab) (a description, not an act)

  24. Philadelphia, Pennsylvania

    Philadelphia City Planning Commission identified two potential locations for industrial scale data centers: Bellwether District and Grant Avenue area

    6abc.com (opens in a new tab) (no act in the sentence)

  25. Philadelphia, Pennsylvania

    Philadelphia City Council has not introduced legislation or resolution on data centers as of September 14, 2026

    6abc.com (opens in a new tab) (a description, not an act)

  26. Philadelphia, Pennsylvania

    No Data Centers in Philly coalition called for a three year moratorium on data center construction

    whyy.org (opens in a new tab) (a statement; who said what is on the statements pages)

  27. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix features closed loop cooling system that requires no water for operational cooling

    beavercountyradio.com (opens in a new tab) (a description, not an act)

  28. Pennsylvania

    PUC plans a technical conference this fall on cost allocation for large computational loads including data centers

    local21news.com (opens in a new tab) (a plan or a schedule, not an act yet)

  29. Pennsylvania

    Final order targeted for Jan. 28, 2027

    local21news.com (opens in a new tab) (no act in the sentence)

  30. Philadelphia, Pennsylvania

    No Data Centers in Philly campaign organized rally at City Hall on Monday demanding Philadelphia City Council halt data center development

    northeasttimes.com (opens in a new tab) (no act in the sentence)

  31. Philadelphia, Pennsylvania

    No zoning rules currently govern where data centers can be built or what protections must be offered to surrounding communities

    northeasttimes.com (opens in a new tab) (a description, not an act)

  32. Philadelphia, Pennsylvania

    Two proposed data center sites identified in Philadelphia: one in Southwest Philadelphia and one in the Northeast

    northeasttimes.com (opens in a new tab) (no act in the sentence)

  33. Philadelphia, Pennsylvania

    Philadelphia does not currently have any rules governing where data centers can be built or how communities should be protected.

    whyy.org (opens in a new tab) (a description, not an act)

  34. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Facility features closed loop cooling system requiring zero water for operational cooling

    timesonline.com (opens in a new tab) (a description, not an act)

  35. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix will utilize dedicated onsite power source versus local electrical grid

    timesonline.com (opens in a new tab) (a plan or a schedule, not an act yet)

  36. Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    Project Phoenix is a 2 GW data center campus in Shippingport

    timesonline.com (opens in a new tab) (a description, not an act)

  37. Pennsylvania

    DEP Northwest Regional Office will hold public meeting and hearing on major amendment to NPDES water quality permit for Homer City Data Center/Power Plant Complex on October 14 at Homer Center High School from 5 to 7:30 p.m.

    paenvironmentdaily.blogspot.com (opens in a new tab) (a plan or a schedule, not an act yet)

  38. Pennsylvania

    PUC Law Bureau and Bureau of Technical Utility Services will present tentative order outlining proposed changes to load management framework at Oct. 1 meeting, with vote targeted for Jan. 28

    utilitydive.com (opens in a new tab) (a plan or a schedule, not an act yet)

  39. Lancaster, Pennsylvania

    Appeal scheduled for zoning hearing board September 28 at 4 p.m. at City Hall

    thecooldown.com (opens in a new tab) (a plan or a schedule, not an act yet)

  40. Wyoming County, Pennsylvania

    Amended SALDO requires large scale developments to coordinate with electric providers, state agencies and interstate compacts on water pollution, water consumption, electric connectivity, erosion and stormwater runoff before county project approval.

    wcexaminer.com (opens in a new tab) (a description, not an act)

  41. Upper Burrell Township, Pennsylvania

    Upper Burrell Township planning commission will meet on September 15 to review the latest data center ordinance

    keystonenewsroom.com (opens in a new tab) (a plan or a schedule, not an act yet)

  42. TECfusions Keystone Connect AI Data Center, New Kensington, Pennsylvania

    TECfusions Keystone Connect could generate up to 3 gigawatts of computational power

    keystonenewsroom.com (opens in a new tab) (a plan or a schedule, not an act yet)

  43. TECfusions Keystone Connect AI Data Center, New Kensington, Pennsylvania

    TECfusions Keystone Connect campus spans 1,400 acres

    keystonenewsroom.com (opens in a new tab) (a description, not an act)

  44. Pennsylvania

    The executive order requires developers to show proof of local approvals before receiving any state permits or authorizations

    spotlightpa.org (opens in a new tab) (a description, not an act)

  45. Pennsylvania

    Data centers are being kicked out of Pennsylvania's Fast Track permitting program previously available to major projects

    spotlightpa.org (opens in a new tab) (a description, not an act)

  46. Pennsylvania

    The executive order sets up two tracks for data centers with peak demand over 25 MW: an easier track for developers signing a consent agreement with GRID standards allowing rolling basis permits, and a harder track requiring all documentation upfront

    spotlightpa.org (opens in a new tab) (a description, not an act)

  47. Smithfield Township, Pennsylvania

    The revised ordinance requires data center campuses to be located no closer than 2,000 feet from residential use or zoning district.

    lehighvalleylive.com (opens in a new tab) (a description, not an act)

  48. Lackawanna County, Pennsylvania

    Lackawanna County is conducting an air quality and public health impact assessment study for data center and power plant development.

    thetimes-tribune.com (opens in a new tab) (a description, not an act)

  49. Archbald, Pennsylvania

    Valley View School Board decided to continue its participation in litigation against proposed data centers and power plants.

    thetimes-tribune.com (opens in a new tab) (a description, not an act)

  50. Pennsylvania

    Township planning third vote on data center after Sunshine Act violation

    thecentersquare.com (opens in a new tab) (a plan or a schedule, not an act yet)

  51. Homer City Energy Campus Redevelopment, Homer City, Pennsylvania

    The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople.

    post-gazette.com (opens in a new tab) (a description, not an act)

  52. Pennsylvania

    GRID ties environmental permitting and tax incentives to requirements on power, water, workforce and community standards

    datacenterfrontier.com (opens in a new tab) (no act in the sentence)

  53. Pennsylvania

    Qualifying developers must demonstrate incremental energy capacity and pay full cost of that capacity in same PJM locational deliverability area

    datacenterfrontier.com (opens in a new tab) (a description, not an act)

  54. Pennsylvania

    Developers must procure at least 10% of annual electricity from incremental clean firm energy beginning January 1, 2027, increasing to 14.5% in 2030 and 32% in 2035

    datacenterfrontier.com (opens in a new tab) (a description, not an act)

  55. Pennsylvania

    Senate Bill 1359 would impose statewide moratorium on hyperscale data center development and permitting

    datacenterfrontier.com (opens in a new tab) (a plan or a schedule, not an act yet)

  56. Pennsylvania

    Senate Bill 1345 would authorize municipalities to temporarily stop accepting new applications for high impact data centers for up to 18 months

    datacenterfrontier.com (opens in a new tab) (a plan or a schedule, not an act yet)

  57. Homer City Energy Campus Redevelopment, Homer City, Pennsylvania

    Fifty three trucks hauling oversized loads will travel through Armstrong, Westmoreland, and Indiana counties over four months transporting large industrial pieces

    cbsnews.com (opens in a new tab) (a plan or a schedule, not an act yet)

August 2026 25 acts on the line from 41 reports; 10 reported; 25 lines of background, plans and statements

  1. Filing waiting on permits Lower Mount Bethel Technology Center, Lower Mount Bethel Township, Pennsylvania

    Township authority over data center plans in Northampton County is described as uncertain.

    lehighvalleylive.com (opens in a new tab), local outlet

  2. Wildcat Ridge Data Center Campus, Archbald, Pennsylvania

    PPL completed a land deal in Archbald to pave the way for massive data center power plants.

    thetimes-tribune.com (opens in a new tab), local outlet

  3. Litigation Salem Township, Pennsylvania

    Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order

    thecentersquare.com (opens in a new tab), national outlet (the weekday its sentence names, the last before the report; filed under Sep 1, 2026)

  4. Opening running TECfusions Keystone Connect AI Data Center, New Kensington, Pennsylvania

    TECfusions announced that its New Kensington data center is live and delivering GPU capacity for artificial intelligence and high performance computing workloads.

    globenewswire.com (opens in a new tab), primary source

  5. Filing waiting on permits 4-3 Salem Township Data Center, Salem Township, Pennsylvania

    A proposed third data center campus in Salem Township encompassing 279 properties and 4,466 acres is undergoing a zoning hearing process that a Luzerne County judge ordered to be redone after residents were locked out of the July 23, 2026 meeting.

    citizensvoice.com (opens in a new tab), news outlet

  6. Filing waiting on permits Pittsburgh International Race Complex Data Center (Switch), Big Beaver, Pennsylvania

    Switch filed for local approval to build a three building data center campus on the 384 acre former Pittsburgh International Race Complex site in Big Beaver Borough, Beaver County.

    post-gazette.com (opens in a new tab), local outlet

  7. proposed Falls Township Data Center (Keystone Trade Center), Falls Township, Pennsylvania

    Amazon has been confirmed as the end user in a contentious Pennsylvania data center project.

    buckscountycouriertimes.com (opens in a new tab), news outlet

  8. reported PAX-1 Data Center, Middlesex Township, Pennsylvania

    The PAX-1 data center project in Cumberland County does not have all the necessary permits to operate

    fox43.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  9. Pennsylvania

    Governor Josh Shapiro signed Executive Order 2026-05 on August 18, 2026

    statecapitallobbyist.com (opens in a new tab), primary source

    12 more reports of this
    1. Reported August 18 Governor Shapiro signed an executive order mandating four minimum standards for data center development: companies must pay for their own energy, minimize noise and air pollution and water usage, hire local workers, and give back to communities in negotiated benefit agreements. cbsnews.com (opens in a new tab)
    2. Aug 18 Pennsylvania Department of Environmental Protection launched a Data Center Permit Tracker map on August 18, 2026, at the direction of Governor Josh Shapiro, showing all proposed data center projects that have engaged with the department; it went live the same day Shapiro signed his executive order requiring compliance with the Governor's Responsible Infrastructure Development (GRID) requirements thetimes-tribune.com (opens in a new tab)
    3. Aug 18 Governor Josh Shapiro signed an executive order on August 18 imposing strictest guardrails on data centers, removing artificial intelligence data centers from permit fast track and requiring local approval before Department of Environmental Protection reviews applications. creators.com (opens in a new tab)
    4. Aug 18 Pennsylvania Department of Environmental Protection launched a Data Center Permit Tracker on August 18, 2026 at the direction of Gov. Josh Shapiro following his Governor's Responsible Infrastructure Development (GRID) executive order signed the same day, requiring all data centers applying for permits to comply with GRID requirements and showing 23 confirmed data center projects statewide. republicanherald.com (opens in a new tab)
    5. Aug 18 Governor Shapiro signed an executive order requiring data centers applying for permits with the state to comply with his Governor's Responsible Infrastructure Development (GRID) requirements on August 18, 2026 wcexaminer.com (opens in a new tab)
    6. Aug 18 Governor Shapiro signed an executive order on August 18, 2026 limiting data center construction weny.com (opens in a new tab)
    7. Aug 18 Governor Josh Shapiro signed an executive order on Tuesday imposing stricter regulations on data center projects in Pennsylvania and removing them from the PA Permit Fast Track program fox43.com (opens in a new tab)
    8. Reported August 19 Pennsylvania Governor signed executive order setting strict requirements on data center developments datacenterdynamics.com (opens in a new tab)
    9. Reported September 15 Pennsylvania's Fiscal Code already required every data center with a peak electric demand of 10 megawatts or greater to report annual energy and water usage, enacted just five weeks before Shapiro signed the executive order broadandliberty.com (opens in a new tab)
    10. Reported September 16 Josh Shapiro signed an executive order seeking stricter guardrails for data center development in Pennsylvania bostonglobe.com (opens in a new tab)
    11. Reported September 22 Governor of Pennsylvania Josh Shapiro signed an executive order that he said introduced the strictest guardrails for AI data center developments in the US. w.media (opens in a new tab)
    12. Reported September 22 A year after the July 2025 summit, Shapiro signed an order imposing new requirements on data center projects and removing them from regulatory fast track initiative techcrunch.com (opens in a new tab)
  10. Pennsylvania

    Pennsylvania Governor Josh Shapiro issued August 18 executive order creating GRID framework for large data centers

    datacenterfrontier.com (opens in a new tab), trade press (the day its own sentence names; filed under Sep 3, 2026)

    3 more reports of this
    1. Aug 18 Pennsylvania Governor Josh Shapiro issued an executive order on August 18, 2026, requiring a framework that puts consumers before data centers in dampening grid usage and prohibiting data center utility cost pass throughs to ordinary customers. wvgazettemail.com (opens in a new tab)
    2. Reported August 19 Governor Shapiro issued an executive order affecting data center development spotlightpa.org (opens in a new tab)
    3. Reported September 4 Governor Shapiro issued an executive action on data centers buckscountybeacon.com (opens in a new tab)
  11. Pennsylvania

    Pennsylvania Department of Environmental Protection launched a Data Center Permit Tracker on August 18, 2026 at the direction of Governor Josh Shapiro

    wcexaminer.com (opens in a new tab), local outlet

  12. River Pointe Data Center, Upper Mount Bethel Township, Pennsylvania

    Slate Belt Holdings has proposed a data center campus in Upper Mount Bethel Township, with supervisors discussing a draft agreement amid resident opposition.

    mcall.com (opens in a new tab), local outlet

  13. reported MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    MLP Ventures proposal includes closed loop water system

    cbsnews.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  14. proposed Kline Township Data Center Development, Kline Township, Pennsylvania

    An unnamed technology company is discussing plans for an AI factory data center in Schuylkill County, Pennsylvania amid resident concerns.

    republicanherald.com (opens in a new tab), news outlet

  15. proposed Pittsburgh International Race Complex Data Center (Switch), Big Beaver, Pennsylvania

    A developer submitted plans for a data center campus at a former Beaver County racetrack.

    post-gazette.com (opens in a new tab), local outlet

  16. Denial stalled MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    The Upper Merion Township Board of Supervisors denied the developer's two extension requests and several preliminary land development proposals for the King of Prussia data center campus; the developer, Brian O'Neill, said he would appeal.

    6abc.com (opens in a new tab), local outlet

  17. Filing Starpointe Data Center, Hanover Township, Pennsylvania

    A controversial data center proposed in a rural Washington County community drew hundreds of residents to a township meeting and was the subject of a public hearing.

    observer-reporter.com (opens in a new tab), news outlet

  18. Filing reported 900 Conshohocken Rd. Data Center, Plymouth Township, Pennsylvania

    Brian O'Neill is seeking approval for a 2 million square foot data center facility at 900 Conshohocken Road in Plymouth Township

    6abc.com (opens in a new tab), local outlet

  19. Filing reported MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    Brian O'Neill of MLP Ventures is seeking approval for a 4.5 million square foot data center campus in King of Prussia

    6abc.com (opens in a new tab), local outlet

  20. Approval reported TECfusions Keystone Connect AI Data Center, New Kensington, Pennsylvania

    Upper Burrell Township approved a land development plan for TECfusions Building J on August 5, 2026

    keystonenewsroom.com (opens in a new tab), local outlet (the day its own sentence names; filed under Sep 8, 2026)

  21. proposed Wildcat Ridge Data Center Campus, Archbald, Pennsylvania

    A proposed Wildcat Ridge Data Center Campus in Archbald would contain 588 backup diesel generators to power 14 data center buildings.

    kleinmanenergy.upenn.edu (opens in a new tab), news outlet

  22. Pennsylvania

    Governor Shapiro signed executive order removing AI data center proposals from Fast Track permitting and mandating GRID Requirements for data center developers

    wccsradio.com (opens in a new tab), local outlet

    1 more report of this
    1. Reported August 24 Data center projects removed from PA Permit Fast Track Program effective with Executive Order 2026-05 statecapitallobbyist.com (opens in a new tab)
  23. Ordinance Smithfield Township, Pennsylvania

    Supervisors amended the township zoning ordinance last month to strengthen regulations regarding future data center proposals.

    lehighvalleylive.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 7, 2026)

  24. Pennsylvania

    Gov. Josh Shapiro signed his executive order on data center development last month with promises of the strictest guardrails on development

    broadandliberty.com (opens in a new tab), news outlet (the month its own sentence names; no day is given; filed under Sep 15, 2026)

  25. Litigation stalled MLP Ventures King of Prussia Data Center Campus, King of Prussia, Pennsylvania

    Developer Brian O'Neill sued Upper Merion Township Board of Supervisors over its rejection last month of his proposed 4.6 million square foot data center campus.

    inquirer.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 18, 2026)

Reported in August 2026, dated only by the article that carried them: 10 acts
  1. Ordinance Marple Township, Pennsylvania

    Marple Township drafted a data center ordinance requiring minimum site size of 2 acres and 1,000 foot setback from other properties, permitting data centers only in light industrial districts

    thecooldown.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  2. Ordinance Marple Township, Pennsylvania

    Marple Township's proposed ordinance prohibits open loop evaporative cooling systems because they use large amounts of water and contribute to urban heat islands

    thecooldown.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  3. Pennsylvania

    Josh Shapiro revoked fast track approval for new data warehouses in Pennsylvania after previously touting an Amazon data center

    time.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  4. Moratorium Pennsylvania

    Stacy Garrity backed a temporary moratorium on new data centers in Pennsylvania

    time.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  5. Pennsylvania

    Governor Josh Shapiro removed AI data centers from Pennsylvania's fast track program and required local approval, enforceable commitments on power, water and community benefits

    fortune.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  6. Pennsylvania

    Shapiro announced a state portal for feedback on data centers and a map.

    thecentersquare.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  7. Wyoming County, Pennsylvania

    Wyoming County Planning Commission voted unanimously on a proposed SALDO amendment to regulate high intensity nonresidential land development such as data centers with a 10,000 square foot threshold.

    wcexaminer.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  8. Moratorium adopted Pennsylvania

    Pennsylvania House passed bill calling for six month moratorium on data center construction

    delcotimes.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  9. Pennsylvania

    Pennsylvania restricted data center construction

    wsj.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  10. Litigation Upper Merion, Pennsylvania

    Developer sued Upper Merion Township planning commission and board of supervisors; vote scheduled for Thursday pending court order

    cbsnews.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for August 2026, not acts of their own: 25 lines of background, plans and statements
  1. Pennsylvania

    Community opposition is slowing but not killing Pennsylvania data center projects

    spotlightpa.org (opens in a new tab) (a description, not an act)

  2. Pennsylvania

    Pennsylvania is experiencing rapid data center development attracting artificial intelligence industry investment

    nytimes.com (opens in a new tab) (a description, not an act)

  3. Bethlehem, Pennsylvania

    A zoning ordinance will be up for a public hearing October 6 at City Hall for proposed restrictions on data center placement and requirements

    mcall.com (opens in a new tab) (a plan or a schedule, not an act yet)

  4. Bethlehem, Pennsylvania

    The proposed ordinance requires a 200 foot building setback from any property line and at least a 1,000 foot setback from sensitive uses

    mcall.com (opens in a new tab) (a description, not an act)

  5. Bethlehem, Pennsylvania

    Data centers would be permitted only in the industrial zoning district and would require a special exception permit issued by the zoning hearing board

    mcall.com (opens in a new tab) (a plan or a schedule, not an act yet)

  6. Marple Township, Pennsylvania

    Marple Township ordinance requires environmental, traffic, and economic impact studies, noise and vibration standards with tighter limits during overnight hours, and proof that adequate water is available without groundwater damage

    thecooldown.com (opens in a new tab) (a description, not an act)

  7. Marple Township, Pennsylvania

    Marple Township board was expected to review the revised data center ordinance at a September 14 meeting

    thecooldown.com (opens in a new tab) (a plan or a schedule, not an act yet)

  8. River Pointe Data Center, Upper Mount Bethel Township, Pennsylvania

    The proposed data center campus would consist of 23 data center pads, each with a footprint of 201,000 square feet

    lehighvalleylive.com (opens in a new tab) (a plan or a schedule, not an act yet)

  9. Pennsylvania

    Pennsylvania has data center rules affecting construction

    constructiondive.com (opens in a new tab) (a description, not an act)

  10. Pennsylvania

    Data centers with peak demand over 25 megawatts must follow new review process

    statecapitallobbyist.com (opens in a new tab) (a description, not an act)

  11. Pennsylvania

    Operating data centers required to file detailed annual energy and water consumption reports beginning July 1, 2027, and every year thereafter

    statecapitallobbyist.com (opens in a new tab) (no act in the sentence)

  12. Pennsylvania

    Non disclosure agreements no longer permitted for data center projects involving agencies under the Governor's jurisdiction

    statecapitallobbyist.com (opens in a new tab) (no act in the sentence)

  13. Salem Township, Pennsylvania

    Salem Township Board of Supervisors scheduled to meet Wednesday to decide on data center overlay zone expansion

    timesleader.com (opens in a new tab) (a plan or a schedule, not an act yet)

  14. Pennsylvania

    The Legislature on July 12 concluded the budget process with virtually nothing done about public concerns on data centers.

    thecentersquare.com (opens in a new tab) (no act in the sentence)

  15. Wyoming County, Pennsylvania

    Maximum noise level threshold set at 55 decibels during normal operations for high intensity nonresidential projects.

    wcexaminer.com (opens in a new tab) (no act in the sentence)

  16. Pennsylvania

    Shapiro set binding GRID requirements in Pennsylvania targeting data center power costs

    powermag.com (opens in a new tab) (a description, not an act)

  17. Pennsylvania

    Shapiro's executive order takes into consideration environmental, energy and community costs of new data centers

    cbsnews.com (opens in a new tab) (a description, not an act)

  18. Pennsylvania

    The order prohibits nondisclosure agreements for data centers

    eenews.net (opens in a new tab) (a description, not an act)

  19. Pennsylvania

    Data centers with peak load of at least 25 megawatts must sign a consent order before permit reviews

    eenews.net (opens in a new tab) (a description, not an act)

  20. Pennsylvania

    The order calls for utilities to cut power to data centers first in case of grid emergency

    eenews.net (opens in a new tab) (a statement; who said what is on the statements pages)

  21. Pennsylvania

    Data centers must shoulder all costs of their electricity service under the order

    eenews.net (opens in a new tab) (a description, not an act)

  22. Pennsylvania

    Pennsylvania dangles permitting carrot for data centers that bring their own power

    utilitydive.com (opens in a new tab) (a description, not an act)

  23. PAX-1 Data Center, Middlesex Township, Pennsylvania

    The 700 acre PAX-1 property is located off Country Club Road and construction crews have already begun moving dirt

    fox43.com (opens in a new tab) (a description, not an act)

  24. Pennsylvania

    Executive order bars data center developers from using non disclosure agreements

    news.bloomberglaw.com (opens in a new tab) (a description, not an act)

  25. Pennsylvania

    Governor Shapiro stated that if the local community does not approve a data center project, the state will not approve it either, giving veto power to municipalities.

    cbsnews.com (opens in a new tab) (a statement; who said what is on the statements pages)

July 2026 6 acts on the line from 7 reports; 1 line of background, plans and statements

  1. River Pointe Data Center, Upper Mount Bethel Township, Pennsylvania

    Talen Energy and Slate Belt Holdings proposed a 23 building data center campus in Northampton County, Pennsylvania.

    datacenterdynamics.com (opens in a new tab), trade press

    1 more report of this
    1. Reported August 26 Slate Belt Holdings, a partnership including Talen Energy and River Pointe Logistics Center team, proposed building a data center complex on 754 acres on the former River Pointe property lehighvalleylive.com (opens in a new tab)
  2. proposed 900 Conshohocken Rd. Data Center, Plymouth Township, Pennsylvania

    Plymouth Township council opposes a planned data center, accusing the developer of intimidation and bullying.

    timesherald.com (opens in a new tab), news outlet

  3. Scranton Materials Data Center, Ransom Township, Pennsylvania

    A firm purchased land in Ransom Township for a hyperscale data center campus.

    thetimes-tribune.com (opens in a new tab), local outlet

  4. proposed Highridge Data Project Nebius, Butler Township, Pennsylvania

    Nebius pitched a data center project in the West End area of Pennsylvania.

    republicanherald.com (opens in a new tab), news outlet

  5. Approval approved QTS Salem Township, Salem Township, Pennsylvania

    QTS acquired approximately 1,700 acres for $580 million in Salem Township and received Salem Township approval of road vacations and a final master plan for the data center campus.

    citizensvoice.com (opens in a new tab), news outlet

  6. Filing waiting on permits Pittsburgh International Race Complex Data Center (Switch), Big Beaver, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on July 9, 2026; its tracker lists the project as permits under review (4 permits: 1 pending, 3 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

Also on the record for July 2026, not acts of their own: 1 line of background, plans and statements
  1. Highridge Data Project Nebius, Butler Township, Pennsylvania

    A proposed 600 acre data center in Butler Township prompted a special municipal hearing.

    republicanherald.com (opens in a new tab) (no act in the sentence)

June 2026 2 acts on the line

  1. proposed 4-3 Salem Township Data Center, Salem Township, Pennsylvania

    The 4-3 Glen Brook Group announced a data center campus in Salem Township encompassing approximately 4,000 acres with a 39 building campus and potential power demand of 3.5 to 4 gigawatts.

    timesleader.com (opens in a new tab), local outlet

  2. Moratorium adopted Hazle Township, Pennsylvania

    Hazle Township supervisors passed a 180 day freeze on new data center applications on June 8, 2026, pausing Project Hazelnut while officials rewrite zoning rules

    thecooldown.com (opens in a new tab), national outlet

May 2026 6 acts on the line

  1. stalled 1205 Commonwealth Dr. Data Center (Pennhurst), East Vincent Township, Pennsylvania

    East Vincent Township supervisors unanimously rejected a proposed 1.9 million square foot data center at the Pennhurst State School and Hospital property; developer Pennhurst Holdings LLC appealed to the Chester County Court of Common Pleas.

    thecooldown.com (opens in a new tab), national outlet

  2. proposed Hunlock Data Center, Hunlock Township, Pennsylvania

    Castleton Commodities International LLC expressed interest in building a small data center near Hunlock Creek Energy Center in Luzerne County.

    thetimes-tribune.com (opens in a new tab), local outlet

  3. Filing waiting on permits Highridge Data Project Nebius, Butler Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on May 8, 2026; its tracker lists the project as permits under review (7 permits: 2 issued, 1 pending, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  4. stalled Project Gravity, Archbald, Pennsylvania

    Project Gravity is a proposed seven building AI data center complex in Archbald Borough, Lackawanna County, that was removed from Pennsylvania's fast track permitting program due to lack of transparency.

    paenvironmentdaily.blogspot.com (opens in a new tab), local outlet

  5. Rate rule Pennsylvania

    PUC established model large load tariff in May 2026 to ensure customers requiring 50 megawatts or more bear the costs they add to electric system

    abc27.com (opens in a new tab), local outlet (the month its source gives; it names no day)

  6. Moratorium Upper Burrell Township, Pennsylvania

    Upper Burrell Township established a 180 day moratorium on data center development in May 2026

    keystonenewsroom.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 8, 2026)

April 2026 3 acts on the line; 1 reported

  1. Filing waiting on permits Sharon Data Center Project, Sharon, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on April 28, 2026; its tracker lists the project as permits under review (2 permits: 1 pending, 1 received).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. Filing waiting on permits Triboro Industrial Park Data Center, Throop, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on April 28, 2026; its tracker lists the project as permits under review (6 permits: 1 issued, 1 pending, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  3. Filing waiting on permits Starpointe Data Center, Hanover Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on April 10, 2026; its tracker lists the project as permits under review (3 permits: 1 pending, 2 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

Reported in April 2026, dated only by the article that carried it: 1 act
  1. Ordinance Berks County, Pennsylvania

    Berks County township adopted ordinance setting limits for future AI data centers

    wgal.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

March 2026 1 act on the line

  1. Filing waiting on permits Project Boson / Highway Auto Data Center, Archbald, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on March 2, 2026; its tracker lists the project as permits under review (6 permits: 1 pending, 1 returned, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

February 2026 4 acts on the line

  1. Filing waiting on permits Carbon Node East / Panther Creek, Nesquehoning, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on February 25, 2026; its tracker lists the project as permits under review (5 permits: 3 pending, 2 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. proposed River Pointe Data Center, Upper Mount Bethel Township, Pennsylvania

    A proposed data center in the Slate Belt area of Pennsylvania drew public interest and concerns, prompting a town hall discussion.

    lehighvalleylive.com (opens in a new tab), local outlet

  3. proposed Aligned PIT-01 (Project Phoenix), Shippingport, Pennsylvania

    A sprawling data center campus has been proposed adjacent to the former Bruce Mansfield power plant in Beaver County.

    triblive.com (opens in a new tab), news outlet

  4. Denial Montour County, Pennsylvania

    Citizens of Montour County won a rare victory in February when county leaders denied a rezoning application for a data center

    insideclimatenews.org (opens in a new tab), trade press (the month its own sentence names; no day is given; filed under Sep 22, 2026)

January 2026 2 acts on the line

  1. Filing waiting on permits Project Atlas, South Whitehall Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on January 28, 2026; its tracker lists the project as permits under review (6 permits: 3 pending, 1 received, 2 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. Filing waiting on permits Lancaster AI Hub West, Lancaster, Pennsylvania

    Pennsylvania DEP issued an air quality permit for 176 backup diesel generators totaling 3.25 MW for an AI data center project in the City of Lancaster.

    lancasteronline.com (opens in a new tab), news outlet

2026, no month given 2 acts

  1. Pennsylvania

    Josh Shapiro signed an executive order in summer 2026 imposing tight requirements and restrictions on data centers in Pennsylvania

    wcti12.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 21, 2026)

  2. Moratorium Pennsylvania

    State Sen. Katie Muth introduced a bill this year that would impose a three year moratorium on data center development

    insideclimatenews.org (opens in a new tab), trade press (the year its own sentence names; filed under Sep 22, 2026)

2025 11 acts on the line

December 2025 2 acts on the line

  1. Filing waiting on permits QTS Salem Township, Salem Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on December 8, 2025; its tracker lists the project as permits under review (15 permits: 5 pending, 10 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. Filing waiting on permits Springdale Data Center, Springdale, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on December 8, 2025; its tracker lists the project as permits under review (5 permits: 3 issued, 2 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

November 2025 4 acts on the line

  1. Filing waiting on permits Kline Township Data Center Development, Kline Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on November 26, 2025; its tracker lists the project as permits under review (10 permits: 4 issued, 2 pending, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. Denial Hazle Township, Pennsylvania

    Hazle Township Supervisors voted 3-0 on November 14, 2025 to deny land development approval for Project Hazelnut

    standardspeaker.com (opens in a new tab), news outlet

  3. Project Hazelnut, Hazle Township, Pennsylvania

    NorthPoint Development sought approval for 15 data center buildings on land north of Humboldt Industrial Park in Hazle Township

    standardspeaker.com (opens in a new tab), news outlet

  4. Filing waiting on permits Project Hazelnut, Hazle Township, Pennsylvania

    NorthPoint Development's preliminary and final major land development plan for Project Hazelnut, 15 data center buildings with ancillary buildings, parking, utilities, landscaping and stormwater on a 1,282 acre industrial technology campus north of Humboldt Industrial Park North, was before the Hazle Township Board of Supervisors on November 10, 2025, which tabled it.

    hazletownship.com (opens in a new tab), primary source

October 2025 1 act on the line

  1. Filing waiting on permits Project Gravity, Archbald, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on October 24, 2025; its tracker lists the project as permits under review (5 permits: 2 pending, 3 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

May 2025 2 acts on the line

  1. Filing waiting on permits Lancaster AI Hub East, Lancaster, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on May 14, 2025; its tracker lists the project as permits under review (5 permits: 2 issued, 1 pending, 2 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

  2. Filing waiting on permits Falls Township Data Center (Keystone Trade Center), Falls Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on May 5, 2025; its tracker lists Phase 1 as DEP review complete and Phase 2 as permits under review (15 permits: 14 issued, 1 pending).

    gis.dep.pa.gov (opens in a new tab), primary source

April 2025 1 act on the line

  1. being built Homer City Energy Campus Redevelopment, Homer City, Pennsylvania

    Homer City Energy Campus being transformed for data center innovation from brownfield

    datacenterfrontier.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

January 2025 1 act on the line

  1. Filing waiting on permits PAX-1 Data Center, Middlesex Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on January 30, 2025; its tracker lists the project as permits under review (21 permits: 9 issued, 4 pending, 8 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

2024 5 acts on the line

December 2024 1 act on the line

  1. Filing waiting on permits Wyalusing Energy Center, Wyalusing Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on December 27, 2024; its tracker lists the project as permits under review (5 permits: 1 issued, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

November 2024 2 acts on the line

  1. proposed Falls Township Data Center (Keystone Trade Center), Falls Township, Pennsylvania

    Falls Township approved a nondisclosure agreement for a data center project at the Keystone Trade Center outside Philadelphia.

    datacenterdynamics.com (opens in a new tab), trade press

  2. Filing waiting on permits Project Forge Data Center, East Whiteland Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on November 1, 2024; its tracker lists the project as permits under review (3 permits: 2 issued, 1 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

June 2024 1 act on the line

  1. Filing waiting on permits Amazon Luzerne Data Center (Susquehanna Campus), Salem Township, Pennsylvania

    The Pennsylvania DEP received the project's first permit application on June 11, 2024; its tracker lists Phase 1 as DEP review complete and Phase 2 as permits under review (45 permits: 36 issued, 5 pending, 4 not yet submitted).

    gis.dep.pa.gov (opens in a new tab), primary source

2024, no month given 1 act

  1. Pennsylvania

    Shapiro's fast track program introduced in late 2024 was intended to allow state approvals for key projects at the speed of business.

    sungazette.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 9, 2026)

2022 1 act on the line

September 2022 1 act on the line

  1. proposed Project Forge Data Center, East Whiteland Township, Pennsylvania

    fifteenfortyseven Critical Systems Realty and Green Fig Land Company announced plans to acquire 100 acres in Chester County to build a hyperscale data center campus with 150 MW capacity across two 1 million square foot buildings.

    datacenterfrontier.com (opens in a new tab), trade press

2021 1 act on the line from 2 reports

2021, no month given 1 act

  1. Approval Pennsylvania

    Pennsylvania's General Assembly approved a sales tax exemption for data center developments in 2021 under Gov. Tom Wolf

    governing.com (opens in a new tab), national outlet (the year its own sentence names; filed under Aug 14, 2026)

    1 more report of this
    1. 2021, no month given Pennsylvania's General Assembly first approved a sales tax exemption for data center developments in 2021 under Governor Tom Wolf inquirer.com (opens in a new tab)

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data