Data centers in Kingston, Georgia
Kingston has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Kingston yet. Bartow County's own decisions are on the Bartow County page.
The data center in Kingston
Every Kingston record 1 record · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| Kingston Technology Hub (Bartow County, DRI #4835) Kingston, Bartow County | Proposed Waiting on permits Georgia DCA DRI #4835 regional review filing | Thor Acquisition WC LLC | 150 | Thor Acquisition WC LLC filed Georgia DCA DRI #4835 on September 4, 2026 for Kingston Technology Hub, a 350,000 square foot, 150 MW data center facility on 559 acres in Kingston, Bartow County. apps.dca.ga.gov (opens in a new tab) primary source September 4, 2026 | the developer's figure | site | 1 | 2026-09-04 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What happened
-
Now waiting on permitsKingston Technology Hub (Bartow County, DRI #4835)
apps.dca.ga.gov (opens in a new tab) primary source
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Georgia county.
Disclosed figures
150 MW power, water from 1 record, 50 jobs
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 150 MW | 1 | 0 | 1 the developer's figure |
| Water, stated per day | 50,000 gallons a day | 1 | 0 | 1 the developer's figure |
| Permanent jobs | 50 jobs | 1 | 0 | 1 the developer's figure |
| Tax each year | $2,000,000 | 1 | 0 | 1 the developer's figure |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 1 | 150 MW | 50,000 gallons a day | 50 jobs | $2,000,000 |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Kingston is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Kingston is cooled.
About this data
Report a correction · Send a tip about Kingston · The rows here are part of the Georgia export.
Cite this page
Data Center Record, "Data center records in Kingston, Bartow County, Georgia", https://datacenterrecord.org/states/ga/bartow-county/kingston. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 1343668
- Census geography
- Incorporated place, Kingston city
- Rating
- Not rated