Census GEOID: 13015 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary sources

● Proposed Campus Recorded September 4, 2026 · 1 Building

Kingston Technology Hub (Bartow County, DRI #4835)

Street address Tax Parcel 0037-0197-001, Kingston, GA 30145, Bartow County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Thor Acquisition WC LLC filed Georgia DCA DRI #4835 on September 4, 2026 for Kingston Technology Hub, a 350,000 square foot, 150 MW data center facility on 559 acres in Kingston, Bartow County. [1] Filings on the record specify 1 planned or operational building. [1] On the regulatory record, state permit status is Georgia DCA DRI #4835 regional review filing. [1]

1. Land & Parcel
559 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$2,000,000/yr stated
4. Utility Grid Queue
150 MW disclosed
5. Air & Water Permits
Georgia DCA DRI #4835 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
150 MW
the developer's figure

Equivalent to ~124,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
50,000 gal/day
the developer's figure

Equivalent to ~167 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $2,000,000.

Site & Buildings [2]
559 acres
the developer's figure

1 planned or operational data hall building.

Location: Tax Parcel 0037-0197-001, Kingston, GA 30145.

Taxes & Permanent Jobs [1]
$2,000,000/yr
the developer's figure

50 permanent on site jobs disclosed.

Stated annual local tax revenue: $2,000,000.

Key specifications on the record

Power capacity
150 MW developer figure Equivalent to the continuous electricity demand of about 124,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
50,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 167 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 167 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
559 acres developer figure
[2] apps.dca.ga.gov
Buildings
1 building permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Thor Acquisition WC LLC as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
50 the developer's figure
Tax each year
$2,000,000 the developer's figure
Permitted legal entity
Thor Acquisition WC LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4835 state air permit register
State permit status
Georgia DCA DRI #4835 regional review filing the state's permit register, as of September 4, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. Kingston Technology Hub (Bartow County, DRI #4835), capacity: 150 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 150 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Kingston Technology Hub (Bartow County, DRI #4835), water: 50,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 50,000 ÷ 300 = 166.67 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Thor Acquisition WC LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Kingston Technology Hub (Bartow County, DRI #4835).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 150 MW the developer's figure
Site Footprint (Acres) 559 acres 559 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 1 building Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 50,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $2,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting Filing (content date)

    Thor Acquisition WC LLC filed Georgia DCA DRI #4835 on September 4, 2026 for Kingston Technology Hub, a 350,000 square foot, 150 MW data center facility on 559 acres in Kingston, Bartow County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Project Springbank Data Center Campus (Bartow County, DRI #4403) Bartow County 6 mi Proposed Springbank Development Applicant 6 buildings
Project Bunkhouse Data Center Campus (Bartow County, DRI #4433) Bartow County 10 mi Proposed Project Bunkhouse Applicant 12 buildings
Switch The Keep 2 Campus (Cartersville) Cartersville, Bartow County 14 mi Being built Switch, Ltd. 126 acres
DataBank Cartersville Campus (Project Indo) Cartersville, Bartow County 14 mi Proposed DataBank 200 MW
Project Gracie Data Center Campus (Floyd County, DRI #4448) Floyd County 18 mi Proposed Project Gracie Applicant 7 buildings
Microsoft Floyd County ATL80 Campus (DRI #4860) Floyd County 19 mi Proposed Microsoft Corporation 422 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 150 MW, Bisnow: Kingston Technology Hub requires 150 megawatts of power per day from the Municipal Electric Authority of Georgia.

Common questions about Kingston Technology Hub (Bartow County, DRI #4835)

Answered directly from the verified filings and local actions on this page.

Who is building Kingston Technology Hub (Bartow County, DRI #4835)?

Thor Acquisition WC LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

Who will use Kingston Technology Hub (Bartow County, DRI #4835)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Kingston Technology Hub (Bartow County, DRI #4835) say it needs?
Where does Kingston Technology Hub (Bartow County, DRI #4835) stand today?
What is still unknown about Kingston Technology Hub (Bartow County, DRI #4835)?

Not disclosed by any source on file: how loud it would be, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4835 Application Summary (Kingston Technology Hub (Bartow County, DRI #4835)) (opens in a new tab), Georgia Department of Community Affairs, September 4, 2026
  2. Georgia DCA DRI #4835 Initial Form (Kingston Technology Hub (Bartow County, DRI #4835)) (opens in a new tab), Georgia Department of Community Affairs, September 4, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Kingston Technology Hub (Bartow County, DRI #4835)", https://datacenterrecord.org/projects/georgia-dri-4835-kingston-technology-hub-ga, last verified September 4, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Kingston Technology Hub (Bartow County, DRI #4835)", https://datacenterrecord.org/projects/georgia-dri-4835-kingston-technology-hub-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
34.224982, -84.987313
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4835
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4835
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
150 MW, the developer's figure
Published
October 21, 2026
Last verified
September 4, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, Interconnection, Rating of the county's rows

Researcher view · Kingston Technology Hub (Bartow County, DRI #4835) · 2 sources, 1 entry · basis and source tier on every row · verified September 4, 2026