● Proposed Campus Recorded October 20, 2026 · 3 Buildings

Microsoft Floyd County ATL80 Campus (DRI #4860)

Street address 0 Huffaker Rd NW, Rome, GA 30165, Floyd County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Microsoft Corporation filed Georgia DCA DRI #4860 on October 20, 2026 for ATL80, a 3 building, 422 MW data center campus on 349.03 acres north of Huffaker Road in unincorporated Floyd County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4860 regional review filing. [1]

1. Land & Parcel
349.03 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$36,000,000/yr stated
4. Utility Grid Queue
422 MW disclosed
5. Air & Water Permits
Georgia DCA DRI #4860 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
422 MW
the developer's figure

Equivalent to ~350,260 U.S. homes (U.S. EIA 830 homes/MW baseline) · 20% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
13,500 gal/day
the developer's figure

Equivalent to ~45 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $36,000,000.

Site & Buildings [2]
349.03 acres
the developer's figure

3 planned or operational data hall buildings.

Location: 0 Huffaker Rd NW, Rome, GA 30165.

Taxes & Permanent Jobs [1]
$36,000,000/yr
the developer's figure

150 permanent on site jobs disclosed.

Stated annual local tax revenue: $36,000,000.

Key specifications on the record

Power capacity
422 MW developer figure Equivalent to the continuous electricity demand of about 350,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 4 percent of New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
13,500 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 45 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 45 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
349.03 acres developer figure
[2] apps.dca.ga.gov
Buildings
3 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Microsoft Corporation as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
150 the developer's figure
Tax each year
$36,000,000 the developer's figure
Permitted legal entity
Microsoft Corporation the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4860 state air permit register
State permit status
Georgia DCA DRI #4860 regional review filing the state's permit register, as of October 20, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. Microsoft Floyd County ATL80 Campus (DRI #4860), capacity: 422 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 422 ÷ 10,245 = 0.04 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Microsoft Floyd County ATL80 Campus (DRI #4860), water: 13,500 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 13,500 ÷ 300 = 45 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Microsoft Corporation
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft Floyd County ATL80 Campus (DRI #4860).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 422 MW the developer's figure
Site Footprint (Acres) 349.03 acres 349.03 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 3 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 13,500 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $36,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting Filing (content date)

    Microsoft Corporation filed Georgia DCA DRI #4860 on October 20, 2026 for ATL80, a 3 building, 422 MW data center campus on 349.03 acres north of Huffaker Road in unincorporated Floyd County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Project Gracie Data Center Campus (Floyd County, DRI #4448) Floyd County 2 mi Proposed Project Gracie Applicant 7 buildings
Kingston Technology Hub (Bartow County, DRI #4835) Kingston, Bartow County 19 mi Proposed Thor Acquisition WC LLC 150 MW
Project Springbank Data Center Campus (Bartow County, DRI #4403) Bartow County 20 mi Proposed Springbank Development Applicant 6 buildings
Project Bunkhouse Data Center Campus (Bartow County, DRI #4433) Bartow County 27 mi Proposed Project Bunkhouse Applicant 12 buildings
Switch The Keep 2 Campus (Cartersville) Cartersville, Bartow County 32 mi Being built Switch, Ltd. 126 acres
DataBank Cartersville Campus (Project Indo) Cartersville, Bartow County 33 mi Proposed DataBank 200 MW

Blank cell: not disclosed by any source on file.

Common questions about Microsoft Floyd County ATL80 Campus (DRI #4860)

Answered directly from the verified filings and local actions on this page.

Who is building Microsoft Floyd County ATL80 Campus (DRI #4860)?

Microsoft Corporation is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Microsoft Floyd County ATL80 Campus (DRI #4860) say it needs?
Where does Microsoft Floyd County ATL80 Campus (DRI #4860) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4860 Application Summary (Microsoft Floyd County ATL80 Campus (DRI #4860)) (opens in a new tab), Georgia Department of Community Affairs, October 20, 2026
  2. Georgia DCA DRI #4860 Initial Form (Microsoft Floyd County ATL80 Campus (DRI #4860)) (opens in a new tab), Georgia Department of Community Affairs, October 20, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft Floyd County ATL80 Campus (DRI #4860)", https://datacenterrecord.org/projects/georgia-dri-4860-atl80-ga, last verified October 20, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft Floyd County ATL80 Campus (DRI #4860)", https://datacenterrecord.org/projects/georgia-dri-4860-atl80-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
34.29891, -85.30659
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4860
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4860
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
422 MW, the developer's figure
Published
October 21, 2026
Last verified
October 20, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, Interconnection, Rating of the county's rows

Researcher view · Microsoft Floyd County ATL80 Campus (DRI #4860) · 2 sources, 1 entry · basis and source tier on every row · verified October 20, 2026

Download CSV JSON