Data Center Record.
Census GEOID: 13097 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 4 primary and local sources

● Being Built Announced June 29, 2026 · 9 Buildings · Stream Data Centers

Stream Data Centers Atlanta West Campus (SDC ATLA)

Street address 2075 Jason Industrial Pkwy, Winston, GA 30187, Douglas County permit coordinates Exact, the point of the EPA's facility record [4] air.gaepd.org

Overview, regulatory gates and specifications

Stream Data Centers (SDC ATLA) received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-097-0103 (S 01 to 0) on June 29, 2026 following Georgia DCA DRI #4334 review for a 9 building hyperscale campus with 315 emergency generators at 2075 Jason Industrial Parkway in unincorporated Douglas County. [3] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-097-0103 (S 01-0) issued. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
$60,000,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia EPD Air Quality Perm
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
18,000 gal/day
the developer's figure

Equivalent to ~60 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $60,000,000.

Site & Buildings [1]
9 buildings
GA EPD Air Quality Permit and DRI filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2075 Jason Industrial Pkwy, Winston, GA 30187.

Taxes & Permanent Jobs [1]
$60,000,000/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $60,000,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
18,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 60 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 60 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
9 buildings permitted
apps.dca.ga.gov (opens in a new tab)
Backup generators
315 generators permitted
[4] air.gaepd.org
Capital investment
Not disclosed
Who leads it
Stream Data Centers attributed via corporate HQ or property filing
[4] air.gaepd.org
Tax each year
$60,000,000 the developer's figure
Permitted legal entity
SDC ATLA, LLC what a permit allows
[4] air.gaepd.org [4] air.gaepd.org
State air permit registration
GA EPD AIRS 097-00103, GA EPD Permit 7374-097-0103-S-01-0, EPA FRS 110072245618, Georgia DCA DRI #4334 state air permit register
[4] air.gaepd.org
State permit status
Georgia EPD Air Quality Permit No. 7374-097-0103 (S 01-0) issued the state's permit register, as of June 29, 2026, last verified November 11, 2026
[4] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Stream Data Centers Atlanta West Campus (SDC ATLA), water: 18,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 18,000 ÷ 300 = 60 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Stream Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Stream Data Centers Atlanta West Campus (SDC ATLA).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 9 buildings GA EPD Air Quality Permit and DRI filing
Cooling & Water System 18,000 gal/day the developer's figure
Backup Diesel / Gas Generators 315 units what a permit allows [4] air.gaepd.org
Tax Abatement & Annual Revenue $60,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

What was decided

Acts of Douglas County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Douglas County case by case The Douglas County Board of Commissioners voted 4 to 1 to deny a rezoning request for a proposed 4,400,000 square foot data center campus on more than 700 acres near the Interstate 20 Liberty Road exit. fox5atlanta.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    Stream Data Centers (SDC ATLA) received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-097-0103 (S 01 to 0) on June 29, 2026 following Georgia DCA DRI #4334 review for a 9 building hyperscale campus with 315 emergency generators at 2075 Jason Industrial Parkway in unincorporated Douglas County.

    [4] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Trammell Crow Douglas Waldrop Data Center Campus (DRI #4192) Douglas County 1 mi Proposed Trammell Crow Company 2 buildings
Avemore Technology Park (Villa Rica, DRI #4451) Villa Rica, Carroll County 7 mi Proposed Avemore Development Applicant 428.29 acres
Vantage Data Centers Atlanta (GA1 Douglasville) Douglasville, Douglas County 9 mi Being built Vantage Data Centers 256 MW
STACK Infrastructure ATL02 Lithia Springs Lithia Springs, Douglas County 10 mi Running STACK Infrastructure 1 building
T5@Atlanta III Data Center Lithia Springs, Douglas County 10 mi Running T5 Data Centers 1 building
Switch The Keep Campus (Atlanta) Lithia Springs, Douglas County 10 mi Running Switch 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Stream Data Centers Atlanta West Campus (SDC ATLA)

Answered directly from the verified filings and local actions on this page.

Who is building Stream Data Centers Atlanta West Campus (SDC ATLA)?

Stream Data Centers is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Stream Data Centers Atlanta West Campus (SDC ATLA) say it needs?

Power: not disclosed by any source on file. Water: 18,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Stream Data Centers Atlanta West Campus (SDC ATLA) stand today?
What has Douglas County decided about it?

Douglas County (rated case by case): The Douglas County Board of Commissioners voted 4 to 1 to deny a rezoning request for a proposed 4,400,000 square foot data center campus on more than 700 acres near the Interstate 20 Liberty Road exit (July 8, 2026, fox5atlanta.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO Detailed Facility Report (110072245618) (opens in a new tab), U.S. Environmental Protection Agency, June 29, 2026
  2. Georgia DCA DRI #4334 Application Summary (Stream Data Centers Atlanta West Campus (SDC ATLA)) (opens in a new tab), Georgia Department of Community Affairs, June 29, 2026

Reporting

  1. Stream files for 1.3 million sq ft data center campus outside Atlanta, Georgia - Data Center Dynamics (opens in a new tab), Data Center Dynamics, November 28, 2024, news outlet
  2. Georgia EPD Air Quality Permit 7374-097-0103-S-01-0 (Stream Data Centers Atlanta West Campus (SDC ATLA)) (opens in a new tab), Georgia Environmental Protection Division, June 29, 2026, news outlet

4 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Stream Data Centers Atlanta West Campus (SDC ATLA)", https://datacenterrecord.org/projects/stream-data-centers-atlanta-area-campus-ga, last verified June 29, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Stream Data Centers Atlanta West Campus (SDC ATLA)", https://datacenterrecord.org/projects/stream-data-centers-atlanta-area-campus-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.741112, -84.814459
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-29802
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110072245618
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Rating of the county's rows
Case by case
Published
October 1, 2026
Last verified
June 29, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Stream Data Centers Atlanta West Campus (SDC ATLA) · 4 sources, 1 entry, 1 decision nearby · basis and source tier on every row · verified June 29, 2026