● Stalled or Cancelled Announced January 26, 2026 · 12 Buildings · Atlas Development, LLC

Atlas Development Project Bus Campus (Temple, DRI #4606)

Street address Parcels 102 0044, 102 0040, 102 0048 and 102 0005, Temple, GA 30179, Carroll County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Atlas Development, LLC filed Georgia DCA DRI #4606 on January 26, 2026 for Project Bus, a 12 building data center campus on 350.73 acres in Temple, Carroll County, before formally withdrawing the DRI application. [1] On the regulatory record, state permit status is Georgia DCA DRI #4606 application withdrawn. [1]

1. Land & Parcel
350.73 acres on file
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
$42,560,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4606 applic
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

Stated annual local tax revenue: $42,560,000.

Site & Buildings [2]
350.73 acres
the developer's figure

12 planned or operational data hall buildings.

Location: Parcels 102 0044, 102 0040, 102 0048 and 102 0005, Temple, GA 30179.

Taxes & Permanent Jobs [1]
$42,560,000/yr
the developer's figure

275 permanent on site jobs disclosed.

Stated annual local tax revenue: $42,560,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
350.73 acres developer figure
[2] apps.dca.ga.gov
Buildings
12 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Atlas Development, LLC as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
275 the developer's figure
Tax each year
$42,560,000 the developer's figure
Permitted legal entity
Atlas Development, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4606 state air permit register
State permit status
Georgia DCA DRI #4606 application withdrawn the state's permit register, as of January 26, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Atlas Development, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Atlas Development Project Bus Campus (Temple, DRI #4606).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 350.73 acres 350.73 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 12 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $42,560,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: stalled or cancelled (content date)

    Atlas Development, LLC filed Georgia DCA DRI #4606 on January 26, 2026 for Project Bus, a 12 building data center campus on 350.73 acres in Temple, Carroll County, before formally withdrawing the DRI application.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Avemore Technology Park (Villa Rica, DRI #4451) Villa Rica, Carroll County 6 mi Proposed Avemore Development Applicant 428.29 acres
Trammell Crow Douglas Waldrop Data Center Campus (DRI #4192) Douglas County 11 mi Proposed Trammell Crow Company 2 buildings
Stream Data Centers Atlanta West Campus (SDC ATLA) Douglas County 12 mi Being built Stream Data Centers 9 buildings
Vantage Data Centers Atlanta (GA1 Douglasville) Douglasville, Douglas County 20 mi Being built Vantage Data Centers 256 MW
STACK Infrastructure ATL02 Lithia Springs Lithia Springs, Douglas County 21 mi Running STACK Infrastructure 1 building
T5@Atlanta III Data Center Lithia Springs, Douglas County 22 mi Running T5 Data Centers 1 building

Blank cell: not disclosed by any source on file.

Common questions about Atlas Development Project Bus Campus (Temple, DRI #4606)

Answered directly from the verified filings and local actions on this page.

Who is building Atlas Development Project Bus Campus (Temple, DRI #4606)?

Atlas Development, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Atlas Development Project Bus Campus (Temple, DRI #4606) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Atlas Development Project Bus Campus (Temple, DRI #4606) stand today?
What has Temple or Carroll County decided about it?

No decision by Temple or Carroll County about data centers is on the record. The Carroll County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4606 Application Summary (Atlas Development Project Bus Campus (Temple, DRI #4606)) (opens in a new tab), Georgia Department of Community Affairs, January 26, 2026
  2. Georgia DCA DRI #4606 Initial Form (Atlas Development Project Bus Campus (Temple, DRI #4606)) (opens in a new tab), Georgia Department of Community Affairs, January 26, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Atlas Development Project Bus Campus (Temple, DRI #4606)", https://datacenterrecord.org/projects/georgia-dri-4606-project-bus-ga, last verified January 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Atlas Development Project Bus Campus (Temple, DRI #4606)", https://datacenterrecord.org/projects/georgia-dri-4606-project-bus-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
33.767153, -85.014189
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4606
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4606
Location last verified
November 11, 2026
How acreage was disclosed
the developer's figure
Published
October 21, 2026
Last verified
January 26, 2026
Not disclosed