Data centers in Temple, Georgia
Temple has 1 data center on the record; it is stalled or cancelled. No city rule about data centers is on the record for Temple yet. Carroll County's own decisions are on the Carroll County page.
The data center in Temple
Every Temple record 1 record · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| Atlas Development Project Bus Campus (Temple, DRI #4606) Temple, Carroll County | Stalled or cancelled Georgia DCA DRI #4606 application withdrawn | Atlas Development, LLC | Atlas Development, LLC filed Georgia DCA DRI #4606 on January 26, 2026 for Project Bus, a 12 building data center campus on 350.73 acres in Temple, Carroll County, before formally withdrawing the DRI application. apps.dca.ga.gov (opens in a new tab) primary source January 26, 2026 | site | 1 | 2026-01-26 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What happened
-
CancelledAtlas Development Project Bus Campus (Temple, DRI #4606)
apps.dca.ga.gov (opens in a new tab) primary source
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Georgia county.
Disclosed figures
275 jobs
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 0 | 1 | ||
| Water, stated per day | 0 | 1 | ||
| Water, stated per year | 0 | 1 | ||
| Permanent jobs | 275 jobs | 1 | 0 | 1 the developer's figure |
| Tax each year | $42,560,000 | 1 | 0 | 1 the developer's figure |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 1 | 275 jobs | $42,560,000 |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Temple is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Temple is cooled.
About this data
Report a correction · Send a tip about Temple · The rows here are part of the Georgia export.
Cite this page
Data Center Record, "Data center records in Temple, Carroll County, Georgia", https://datacenterrecord.org/states/ga/carroll-county/temple. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 1375832
- Census geography
- Incorporated place, Temple city
- Rating
- Not rated