Digital Fort Gillem, LLC filed Georgia DCA DRI #4482 on May 30, 2025 for ATL 15 and 16, proposing 1,902,654 square feet of data center space on 97 acres inside the former Fort Gillem site in Forest Park, Clayton County. [1] Filings on the record specify 2 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4482 regional review filing. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Equivalent to ~10,000 U.S. households (U.S. EPA 300 gal/day household baseline).
Stated annual local tax revenue: $52,500,000.
2 planned or operational data hall buildings.
Location: Fort Gillem Logistics Center, Forest Park, GA 30297.
Permanent operational headcount not yet disclosed on the record.
Stated annual local tax revenue: $52,500,000.
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | 97 acres | 97 acres | the developer's figure [2] apps.dca.ga.gov |
| Data Hall Buildings | 2 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 3,000,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | $52,500,000/yr | the developer's figure |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Clayton County and Forest Park about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Lovejoy | The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits. | atlantanewsfirst.com (opens in a new tab) | |
| Lovejoy | Lovejoy city council updated zoning code to explicitly prohibit data centers. | ajc.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Digital Fort Gillem, LLC filed Georgia DCA DRI #4482 on May 30, 2025 for ATL 15 and 16, proposing 1,902,654 square feet of data center space on 97 acres inside the former Fort Gillem site in Forest Park, Clayton County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03) Atlanta, Fulton County | 9 mi | Running | EdgeConneX | 3 buildings |
| Microsoft East Point Data Center (ATL06) East Point, Fulton County | 9 mi | Running | Microsoft Corporation | 1 building |
| Centersquare Atlanta (ATL1) Atlanta, Fulton County | 9 mi | Running | Centersquare | 1 building |
| Selig Drive SW Data Center (Data Center Fulton) Atlanta, Fulton County | 9 mi | Being built | Data Center Fulton, LLC | 1 building |
| Digital Realty Downtown Atlanta (ATL13 / ATL14) Atlanta, Fulton County | 10 mi | Running | Digital Realty | 2 buildings |
| Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5) Atlanta, Fulton County | 10 mi | Running | Equinix | 5 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Digital Fort Gillem, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: 3,000,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
Lovejoy (rated closed): The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits (September 29, 2026, atlantanewsfirst.com (opens in a new tab)); and Lovejoy: Lovejoy city council updated zoning code to explicitly prohibit data centers (September 25, 2026, ajc.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482). Last verified May 30, 2025. https://datacenterrecord.org/projects/georgia-dri-4482-atl-15-and-16-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482)
Data Center Record, "Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482)", https://datacenterrecord.org/projects/georgia-dri-4482-atl-15-and-16-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.