Data Center Record.
Census GEOID: 13121 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced November 27, 2024 · 1 Building · Microsoft Corporation

Microsoft East Point Data Center (ATL06)

Street address 4615 Ben Hill Rd, East Point, GA 30349, Fulton County permit coordinates Exact, the point of the EPA's facility record [1] air.gaepd.org

Overview, regulatory gates and specifications

Microsoft Corporation operates the ATL06 cloud data center facility at 4615 Ben Hill Road in East Point, Fulton County under Georgia EPD Synthetic Minor Air Quality Permit Amendment No. 7376-121-0969 (S 01 to 1) issued November 27, 2024. [1] Filings on the record specify 1 planned or operational building. [1] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7376-121-0969 (S 01-1) issued. [1]

Verified Site & Permit Summary
Verified address
4615 Ben Hill Rd, East Point, GA 30349, Fulton County permit coordinates
Operator / developer
Microsoft Corporation
Permit / registry ID
undefined: undefined [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[1] air.gaepd.org
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Microsoft Corporation as stated by the source
[1] air.gaepd.org
Permitted legal entity
Microsoft Corporation what a permit allows
[1] air.gaepd.org
State air permit registration
GA EPD AIRS 121-00969, GA EPD Permit 7376-121-0969-S-01-1 state air permit register
State permit status
Georgia EPD Air Quality Permit No. 7376-121-0969 (S 01-1) issued the state's permit register, as of November 27, 2024, last verified November 11, 2026
[1] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Microsoft Corporation
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft East Point Data Center (ATL06).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 GA EPD Air Quality Permit [1] air.gaepd.org
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Fulton County and East Point about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Atlanta case by case Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks theatlantavoice.com (opens in a new tab)
Atlanta case by case Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. fox5atlanta.com (opens in a new tab)
Atlanta case by case The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. usatoday.com (opens in a new tab)
Atlanta case by case Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise wsbradio.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (content date)

    Microsoft Corporation operates the ATL06 cloud data center facility at 4615 Ben Hill Road in East Point, Fulton County under Georgia EPD Synthetic Minor Air Quality Permit Amendment No. 7376-121-0969 (S 01 to 1) issued November 27, 2024.

    [1] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Vantage Data Centers Atlanta GA1 Campus (Stacks Road) South Fulton, Fulton County 2 mi Being built Vantage Data Centers 1 building
RSC South Fulton Parkway Data Center Campus (DRI #4342) South Fulton, Fulton County 3 mi Proposed RSC Investment Management LLC 59 acres
EdgeConneX Union City Campus (ATL11) Union City, Fulton County 3 mi Running EdgeConneX 3 buildings
The Crossing Business Park Data Center Campus (Union City, DRI #4825) Union City, Fulton County 3 mi Proposed B9 Union City Owner LLC 232.15 acres
ATL03 Red Oak Data Center Campus (Union City) Union City, Fulton County 3 mi Proposed TA Realty / Burr Computer Environments 67.8 acres
Microsoft Union City ATL50 Campus (DRI #4843) Union City, Fulton County 4 mi Proposed Microsoft Corporation 88.01 acres

Blank cell: not disclosed by any source on file.

Common questions about Microsoft East Point Data Center (ATL06)

Answered directly from the verified filings and local actions on this page.

Who is building Microsoft East Point Data Center (ATL06)?

Microsoft Corporation is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Microsoft East Point Data Center (ATL06) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Microsoft East Point Data Center (ATL06) stand today?
What has East Point or Fulton County decided about it?

Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Georgia EPD Air Quality Permit 7376-121-0969-S-01-1 (Microsoft East Point Data Center (ATL06)) (opens in a new tab), Georgia Environmental Protection Division, November 27, 2024, news outlet

1 source on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft East Point Data Center (ATL06)", https://datacenterrecord.org/projects/microsoft-east-point-atl06-ga, last verified November 27, 2024. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft East Point Data Center (ATL06)", https://datacenterrecord.org/projects/microsoft-east-point-atl06-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.628789, -84.506948
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-29402
Coordinate source
https://air.gaepd.org/Permits/View/OP-29402
Location last verified
November 11, 2026
Rating of the county's rows
Case by case
Published
November 11, 2026
Last verified
November 27, 2024
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Microsoft East Point Data Center (ATL06) · 1 source, 1 entry, 4 decisions nearby · basis and source tier on every row · verified November 27, 2024