Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 2 primary and local sources
B9 Union City Owner LLC filed Georgia DCA DRI #4825 on October 29, 2026 (updating earlier DRI #4617) for The Crossing Business Park, a 1,501,400 square foot data center development on 232.15 acres east of Roosevelt Highway in Union City, Fulton County. [1] Filings on the record specify 4 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4825 regional review filing. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
4 planned or operational data hall buildings.
Location: East of Roosevelt Hwy, Union City, GA 30291.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for The Crossing Business Park Data Center Campus (Union City, DRI #4825).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | 232.15 acres | 232.15 acres | the developer's figure [2] apps.dca.ga.gov |
| Data Hall Buildings | 4 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Fulton County and Union City about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Atlanta | Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks | theatlantavoice.com (opens in a new tab) | |
| Atlanta | Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. | fox5atlanta.com (opens in a new tab) | |
| Atlanta | The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. | usatoday.com (opens in a new tab) | |
| Atlanta | Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise | wsbradio.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
B9 Union City Owner LLC filed Georgia DCA DRI #4825 on October 29, 2026 (updating earlier DRI #4617) for The Crossing Business Park, a 1,501,400 square foot data center development on 232.15 acres east of Roosevelt Highway in Union City, Fulton County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Vantage Data Centers Atlanta GA1 Campus (Stacks Road) South Fulton, Fulton County | 1 mi | Being built | Vantage Data Centers | 1 building |
| ATL03 Red Oak Data Center Campus (Union City) Union City, Fulton County | 1 mi | Proposed | TA Realty / Burr Computer Environments | 67.8 acres |
| RSC South Fulton Parkway Data Center Campus (DRI #4342) South Fulton, Fulton County | 1 mi | Proposed | RSC Investment Management LLC | 59 acres |
| Microsoft Union City ATL50 Campus (DRI #4843) Union City, Fulton County | 2 mi | Proposed | Microsoft Corporation | 88.01 acres |
| EdgeConneX Union City Campus (ATL11) Union City, Fulton County | 2 mi | Running | EdgeConneX | 3 buildings |
| Microsoft East Point Data Center (ATL06) East Point, Fulton County | 3 mi | Running | Microsoft Corporation | 1 building |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
B9 Union City Owner LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, since October 29, 2026. The newest entry: B9 Union City Owner LLC filed Georgia DCA DRI #4825 on October 29, 2026 (updating earlier DRI #4617) for The Crossing Business Park, a 1,501,400 square foot data center development on 232.15 acres east of Roosevelt Highway in Union City, Fulton County. [1]
Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. The Crossing Business Park Data Center Campus (Union City, DRI #4825). Last verified October 29, 2026. https://datacenterrecord.org/projects/the-crossing-business-park-union-city-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about The Crossing Business Park Data Center Campus (Union City, DRI #4825)
Data Center Record, "The Crossing Business Park Data Center Campus (Union City, DRI #4825)", https://datacenterrecord.org/projects/the-crossing-business-park-union-city-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.