Data centers in Eatonton, Georgia
Eatonton has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Eatonton yet. Putnam County's own decisions are on the Putnam County page.
The data center in Eatonton
Every Eatonton record 1 record · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| Eatonton 379 Data Center Campus (Putnam County, DRI #4861) Eatonton, Putnam County | Proposed Waiting on permits Georgia DCA DRI #4861 regional review filing | Eatonton 379, LLC | 520 | Eatonton 379, LLC filed Georgia DCA DRI #4861 on October 26, 2026 for an 11 building, 3,510,000 square foot, 520 MW data center campus on 543 acres in Eatonton, Putnam County. apps.dca.ga.gov (opens in a new tab) primary source October 26, 2026 | the developer's figure | site | 1 | 2026-10-26 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What happened
-
Now waiting on permitsEatonton 379 Data Center Campus (Putnam County, DRI #4861)
apps.dca.ga.gov (opens in a new tab) primary source
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Georgia county.
Disclosed figures
520 MW power, water from 1 record, 100 jobs
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 520 MW | 1 | 0 | 1 the developer's figure |
| Water, stated per day | 75,000 gallons a day | 1 | 0 | 1 the developer's figure |
| Permanent jobs | 100 jobs | 1 | 0 | 1 the developer's figure |
| Tax each year | $37,350,000 | 1 | 0 | 1 the developer's figure |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 1 | 520 MW | 75,000 gallons a day | 100 jobs | $37,350,000 |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Eatonton is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Eatonton is cooled.
About this data
Report a correction · Send a tip about Eatonton · The rows here are part of the Georgia export.
Cite this page
Data Center Record, "Data center records in Eatonton, Putnam County, Georgia", https://datacenterrecord.org/states/ga/putnam-county/eatonton. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 1326084
- Census geography
- Incorporated place, Eatonton city
- Rating
- Not rated