● Proposed Campus Announced October 26, 2026 · 11 Buildings · Eatonton 379, LLC

Eatonton 379 Data Center Campus (Putnam County, DRI #4861)

Street address Eatonton Industrial Tract, Eatonton, GA 31024, Putnam County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Eatonton 379, LLC filed Georgia DCA DRI #4861 on October 26, 2026 for an 11 building, 3,510,000 square foot, 520 MW data center campus on 543 acres in Eatonton, Putnam County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4861 regional review filing. [1]

1. Land & Parcel
543 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$37,350,000/yr stated
4. Utility Grid Queue
520 MW disclosed
5. Air & Water Permits
Georgia DCA DRI #4861 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
520 MW
the developer's figure

Equivalent to ~431,600 U.S. homes (U.S. EIA 830 homes/MW baseline) · 25% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
75,000 gal/day
the developer's figure

Equivalent to ~250 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $37,350,000.

Site & Buildings [2]
543 acres
the developer's figure

11 planned or operational data hall buildings.

Location: Eatonton Industrial Tract, Eatonton, GA 31024.

Taxes & Permanent Jobs [1]
$37,350,000/yr
the developer's figure

100 permanent on site jobs disclosed.

Stated annual local tax revenue: $37,350,000.

Key specifications on the record

Power capacity
520 MW developer figure Equivalent to the continuous electricity demand of about 431,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 5 percent of New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
75,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 250 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 250 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
543 acres developer figure
[2] apps.dca.ga.gov
Buildings
11 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Eatonton 379, LLC as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
100 the developer's figure
Tax each year
$37,350,000 the developer's figure
Permitted legal entity
Eatonton 379, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4861 state air permit register
State permit status
Georgia DCA DRI #4861 regional review filing the state's permit register, as of October 26, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. Eatonton 379 Data Center Campus (Putnam County, DRI #4861), capacity: 520 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 520 ÷ 10,245 = 0.05 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Eatonton 379 Data Center Campus (Putnam County, DRI #4861), water: 75,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 75,000 ÷ 300 = 250 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Eatonton 379, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Eatonton 379 Data Center Campus (Putnam County, DRI #4861).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 520 MW the developer's figure
Site Footprint (Acres) 543 acres 543 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 11 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 75,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $37,350,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Eatonton 379, LLC filed Georgia DCA DRI #4861 on October 26, 2026 for an 11 building, 3,510,000 square foot, 520 MW data center campus on 543 acres in Eatonton, Putnam County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Social Circle Technology Park (DRI #4426) Social Circle, Walton County 29 mi Proposed SC Infrastructure 317 acres
Social Circle Parkway Data Center Campus (DRI #4329) Social Circle, Walton County 29 mi Proposed Sailfish Investors Acquisitions, LLC 4 buildings
Meta Stanton Springs Data Center Campus Social Circle, Newton County 30 mi Running Meta 9 buildings
Covington Hazelbrand Hyperscale Data Center (ATL2) Covington, Newton County 32 mi Being built ATL2 Data Center 1 building
Amazon Web Services Covington Campus (ATL089) Covington, Newton County 33 mi Being built Amazon Web Services 1 building
Gregory Road Data Center Campus (Covington, DRI #4428) Covington, Newton County 34 mi Proposed Gregory Road Data Center Applicant 213 acres

Blank cell: not disclosed by any source on file.

Common questions about Eatonton 379 Data Center Campus (Putnam County, DRI #4861)

Answered directly from the verified filings and local actions on this page.

Who is building Eatonton 379 Data Center Campus (Putnam County, DRI #4861)?

Eatonton 379, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Eatonton 379 Data Center Campus (Putnam County, DRI #4861) say it needs?
Where does Eatonton 379 Data Center Campus (Putnam County, DRI #4861) stand today?
What has Eatonton or Putnam County decided about it?

No decision by Eatonton or Putnam County about data centers is on the record. The Putnam County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4861 Application Summary (Eatonton 379 Data Center Campus (Putnam County, DRI #4861)) (opens in a new tab), Georgia Department of Community Affairs, October 26, 2026
  2. Georgia DCA DRI #4861 Initial Form (Eatonton 379 Data Center Campus (Putnam County, DRI #4861)) (opens in a new tab), Georgia Department of Community Affairs, October 26, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Eatonton 379 Data Center Campus (Putnam County, DRI #4861)", https://datacenterrecord.org/projects/eatonton-379-data-center-putnam-county-ga, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Eatonton 379 Data Center Campus (Putnam County, DRI #4861)", https://datacenterrecord.org/projects/eatonton-379-data-center-putnam-county-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.304423, -83.40654
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4861
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4861
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
520 MW, the developer's figure
Published
November 11, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, Interconnection, Rating of the county's rows

Researcher view · Eatonton 379 Data Center Campus (Putnam County, DRI #4861) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 26, 2026

Download CSV JSON