Georgia DCA DRI #4428 was filed in March 2025 for the Gregory Road Data Center Campus, proposing up to 1,410,000 square feet of data center space across 213 industrial acres in Covington, Newton County. [1] Filings on the record specify 4 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4428 regional review filing. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
4 planned or operational data hall buildings.
Location: 89 to 665 Gregory Rd, Covington, GA 30014.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Gregory Road Data Center Campus (Covington, DRI #4428).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | 213 acres | 213 acres | the developer's figure [2] apps.dca.ga.gov |
| Data Hall Buildings | 4 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Georgia DCA DRI #4428 was filed in March 2025 for the Gregory Road Data Center Campus, proposing up to 1,410,000 square feet of data center space across 213 industrial acres in Covington, Newton County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Web Services Covington Campus (ATL089) Covington, Newton County | Less than 1 mi | Being built | Amazon Web Services | 1 building |
| Covington Hazelbrand Hyperscale Data Center (ATL2) Covington, Newton County | 2 mi | Being built | ATL2 Data Center | 1 building |
| Meta Stanton Springs Data Center Campus Social Circle, Newton County | 4 mi | Running | Meta | 9 buildings |
| Social Circle Technology Park (DRI #4426) Social Circle, Walton County | 5 mi | Proposed | SC Infrastructure | 317 acres |
| Social Circle Parkway Data Center Campus (DRI #4329) Social Circle, Walton County | 6 mi | Proposed | Sailfish Investors Acquisitions, LLC | 4 buildings |
| Project Rockforge Data Center Campus (Rockdale County, DRI #4456) Rockdale County | 12 mi | Proposed | MMM Acquisitions LLC | 263 acres |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Gregory Road Data Center Applicant is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, since March 25, 2025. The newest entry, March 25, 2025: Georgia DCA DRI #4428 was filed in March 2025 for the Gregory Road Data Center Campus, proposing up to 1,410,000 square feet of data center space across 213 industrial acres in Covington, Newton County. [1]
No decision by Covington or Newton County about data centers is on the record. The Newton County page and the Georgia scorecard list every rated row the day a person publishes one.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Gregory Road Data Center Campus (Covington, DRI #4428). Last verified March 25, 2025. https://datacenterrecord.org/projects/georgia-dri-4428-gregory-road-data-center-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Gregory Road Data Center Campus (Covington, DRI #4428)
Data Center Record, "Gregory Road Data Center Campus (Covington, DRI #4428)", https://datacenterrecord.org/projects/georgia-dri-4428-gregory-road-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.