ATL2 Data Center received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-217-0079 (S 01 to 0) on June 29, 2026 to construct a hyperscale data center with 37 diesel emergency generators at 10835 Hazelbrand Road NE in Covington, Newton County. [2] Filings on the record specify 1 planned or operational building. [2] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-217-0079 (S 01-0) issued. [2]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 10835 Hazelbrand Rd NE, Covington, GA 30014.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Covington Hazelbrand Hyperscale Data Center (ATL2).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | GA EPD Air Quality Permit [2] air.gaepd.org | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | 37 units | what a permit allows [2] air.gaepd.org | |
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: being built (content date)
ATL2 Data Center received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-217-0079 (S 01 to 0) on June 29, 2026 to construct a hyperscale data center with 37 diesel emergency generators at 10835 Hazelbrand Road NE in Covington, Newton County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Web Services Covington Campus (ATL089) Covington, Newton County | 1 mi | Being built | Amazon Web Services | 1 building |
| Gregory Road Data Center Campus (Covington, DRI #4428) Covington, Newton County | 2 mi | Proposed | Gregory Road Data Center Applicant | 213 acres |
| Meta Stanton Springs Data Center Campus Social Circle, Newton County | 4 mi | Running | Meta | 9 buildings |
| Social Circle Technology Park (DRI #4426) Social Circle, Walton County | 4 mi | Proposed | SC Infrastructure | 317 acres |
| Social Circle Parkway Data Center Campus (DRI #4329) Social Circle, Walton County | 6 mi | Proposed | Sailfish Investors Acquisitions, LLC | 4 buildings |
| DC BLOX Conyers Data Center Campus (ATL East) Conyers, Rockdale County | 13 mi | Being built | DC Blox / Strategic Real Estate Partners | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
ATL2 Data Center is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, since June 29, 2026. The newest entry: ATL2 Data Center received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-217-0079 (S 01 to 0) on June 29, 2026 to construct a hyperscale data center with 37 diesel emergency generators at 10835 Hazelbrand Road NE in Covington, Newton County. [2]
No decision by Covington or Newton County about data centers is on the record. The Newton County page and the Georgia scorecard list every rated row the day a person publishes one.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Covington Hazelbrand Hyperscale Data Center (ATL2). Last verified June 29, 2026. https://datacenterrecord.org/projects/qts-covington-atl2-hazelbrand-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Covington Hazelbrand Hyperscale Data Center (ATL2)
Data Center Record, "Covington Hazelbrand Hyperscale Data Center (ATL2)", https://datacenterrecord.org/projects/qts-covington-atl2-hazelbrand-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.