● Proposed Campus Announced March 21, 2025 · 9 Buildings · SC Infrastructure

Social Circle Technology Park (DRI #4426)

Street address East of SR 11 and North of I-20, Social Circle, GA 30025, Walton County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

SC Infrastructure filed Georgia DCA DRI #4426 on March 21, 2025 (following companion Newton County DRI #4376) for Social Circle Technology Park, a 9 building, 2,567,040 square foot data center campus on 317 acres north of Interstate 20. [1] On the regulatory record, state permit status is Georgia DCA DRI #4426 regional review filing. [1]

1. Land & Parcel
317 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$7,000,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4426 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
230,000 gal/day
the developer's figure

Equivalent to ~767 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $7,000,000.

Site & Buildings [2]
317 acres
the developer's figure

9 planned or operational data hall buildings.

Location: East of SR 11 and North of I-20, Social Circle, GA 30025.

Taxes & Permanent Jobs [1]
$7,000,000/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $7,000,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
230,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 767 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 767 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
317 acres developer figure
[2] apps.dca.ga.gov
Buildings
9 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
SC Infrastructure as stated by the source
[1] apps.dca.ga.gov
Tax each year
$7,000,000 the developer's figure
Permitted legal entity
SC Infrastructure the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4426, Georgia DCA DRI #4376 state air permit register
State permit status
Georgia DCA DRI #4426 regional review filing the state's permit register, as of March 21, 2025, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Social Circle Technology Park (DRI #4426), water: 230,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 230,000 ÷ 300 = 766.67 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: SC Infrastructure
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Social Circle Technology Park (DRI #4426).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 317 acres 317 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 9 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 230,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $7,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    SC Infrastructure filed Georgia DCA DRI #4426 on March 21, 2025 (following companion Newton County DRI #4376) for Social Circle Technology Park, a 9 building, 2,567,040 square foot data center campus on 317 acres north of Interstate 20.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Stanton Springs Data Center Campus Social Circle, Newton County Less than 1 mi Running Meta 9 buildings
Social Circle Parkway Data Center Campus (DRI #4329) Social Circle, Walton County 2 mi Proposed Sailfish Investors Acquisitions, LLC 4 buildings
Covington Hazelbrand Hyperscale Data Center (ATL2) Covington, Newton County 4 mi Being built ATL2 Data Center 1 building
Amazon Web Services Covington Campus (ATL089) Covington, Newton County 5 mi Being built Amazon Web Services 1 building
Gregory Road Data Center Campus (Covington, DRI #4428) Covington, Newton County 5 mi Proposed Gregory Road Data Center Applicant 213 acres
DC BLOX Conyers Data Center Campus (ATL East) Conyers, Rockdale County 17 mi Being built DC Blox / Strategic Real Estate Partners 2 buildings

Blank cell: not disclosed by any source on file.

Common questions about Social Circle Technology Park (DRI #4426)

Answered directly from the verified filings and local actions on this page.

Who is building Social Circle Technology Park (DRI #4426)?

SC Infrastructure is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Social Circle Technology Park (DRI #4426) say it needs?

Power: not disclosed by any source on file. Water: 230,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Social Circle Technology Park (DRI #4426) stand today?
What has Social Circle or Walton County decided about it?

No decision by Social Circle or Walton County about data centers is on the record. The Walton County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4426 Application Summary (Social Circle Technology Park (DRI #4426)) (opens in a new tab), Georgia Department of Community Affairs, March 21, 2025
  2. Georgia DCA DRI #4426 Initial Form (Social Circle Technology Park (DRI #4426)) (opens in a new tab), Georgia Department of Community Affairs, March 21, 2025

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Social Circle Technology Park (DRI #4426)", https://datacenterrecord.org/projects/georgia-dri-4426-social-circle-technology-park-ga, last verified March 21, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Social Circle Technology Park (DRI #4426)", https://datacenterrecord.org/projects/georgia-dri-4426-social-circle-technology-park-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.61628, -83.740124
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4426
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4426
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Published
October 21, 2026
Last verified
March 21, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Social Circle Technology Park (DRI #4426) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified March 21, 2025

Download CSV JSON