● Stalled or Cancelled Announced July 22, 2026 · 8 Buildings · Stillwater Development, LLC

Stillwater Technology Park (Lovejoy, DRI #4794)

Street address 11760 Panhandle Rd, Lovejoy, GA 30228, Clayton County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Stillwater Development, LLC filed Georgia DCA DRI #4794 on July 22, 2026 for a 3,465,000 square foot, 1,250 MW data center campus at 11760 Panhandle Road in Lovejoy before withdrawing the application amid municipal opposition and Lovejoy's September 2026 data center ban. [1] Filings on the record specify 8 planned or operational buildings. [1] On the regulatory record, state permit status is Georgia DCA DRI #4794 application withdrawn. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
$25,000,000/yr stated
4. Utility Grid Queue
1.25 GW disclosed
5. Air & Water Permits
Georgia DCA DRI #4794 applic
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
1.25 GW
the developer's figure

Equivalent to ~1,037,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 60% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
360,000 gal/day
the developer's figure

Equivalent to ~1,200 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $25,000,000.

Site & Buildings [2]
8 buildings
Georgia DCA DRI Initial Form

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 11760 Panhandle Rd, Lovejoy, GA 30228.

Taxes & Permanent Jobs [1]
$25,000,000/yr
the developer's figure

650 permanent on site jobs disclosed.

Stated annual local tax revenue: $25,000,000.

Key specifications on the record

Power capacity
1.25 GW developer figure Equivalent to the continuous electricity demand of about 1,037,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.6 times the 2,080 MW generating capacity of Hoover Dam. About 0.12 times New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
360,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 1,200 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 1,200 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
8 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Stillwater Development, LLC as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
650 the developer's figure
Tax each year
$25,000,000 the developer's figure
Permitted legal entity
Stillwater Development, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4794 state air permit register
State permit status
Georgia DCA DRI #4794 application withdrawn the state's permit register, as of July 22, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. Stillwater Technology Park (Lovejoy, DRI #4794), capacity: 1,250 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,250 ÷ 10,245 = 0.12 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Stillwater Technology Park (Lovejoy, DRI #4794), water: 360,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 360,000 ÷ 300 = 1,200 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Stillwater Development, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Stillwater Technology Park (Lovejoy, DRI #4794).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1.25 GW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 8 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 360,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $25,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

What was decided

Acts of Clayton County and Lovejoy about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Lovejoy closed The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits. atlantanewsfirst.com (opens in a new tab)
Lovejoy closed Lovejoy city council updated zoning code to explicitly prohibit data centers. ajc.com (opens in a new tab)
October 13, 2026 Lovejoy, GA Data center controversy continues in Georgia | FOX 5 News Lovejoy City Council 2 clips

FOX 5 Atlanta report on Lovejoy City Council and community proceedings in Lovejoy, GA: Data center controversy continues in Georgia | FOX 5 News (October 13, 2026).

  1. FOX 5 Atlanta Broadcast Report Broadcast Report transcribed from local broadcast report
    "grounds. The city established a 50 ft buffer between the data center and the burial grounds, they say to ensure it is not destroyed. And a proposed data center in Lovejoy is no longer moving forward. City leaders say the developer has withdrawn its special administrative permit application and will instead pursue residential development for the property. Mayor Marci Fluellen says the"
  2. FOX 5 Atlanta Broadcast Report Broadcast Report transcribed from local broadcast report
    "environment, and the community. That event comes as the city council continues considering how to regulate future data center development after approving a moratorium earlier this summer. Data centers are not going away. And I don't, you know, I think there are parts of Georgia where communities may actually want data centers because they might"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: stalled or cancelled (content date)

    Stillwater Development, LLC filed Georgia DCA DRI #4794 on July 22, 2026 for a 3,465,000 square foot, 1,250 MW data center campus at 11760 Panhandle Road in Lovejoy before withdrawing the application amid municipal opposition and Lovejoy's September 2026 data center ban.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Hampton Technology Park (DRI #4624) Hampton, Henry County 5 mi Proposed Hampton Technology Park Owner, LLC 1.5 GW
Equinix Hampton Data Center Campus Hampton, Henry County 5 mi Being built Equinix 1 building
Strickland Tract Data Center Campus (Henry County, DRI #4251) Henry County 9 mi Proposed Red Wolf DCD Properties, LLC 2 buildings
QTS Fayetteville ATL2 East Campus (DRI #4603) Fayetteville, Fayette County 9 mi Proposed QTS Data Centers 4 buildings
QTS Atlanta Metro Fayetteville (ATL2) Fayetteville, Fayette County 9 mi Running QTS Data Centers 16 buildings
Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482) Forest Park, Clayton County 13 mi Proposed Digital Fort Gillem, LLC 97 acres

Blank cell: not disclosed by any source on file.

Common questions about Stillwater Technology Park (Lovejoy, DRI #4794)

Answered directly from the verified filings and local actions on this page.

Who is building Stillwater Technology Park (Lovejoy, DRI #4794)?

Stillwater Development, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Stillwater Technology Park (Lovejoy, DRI #4794) say it needs?
Where does Stillwater Technology Park (Lovejoy, DRI #4794) stand today?
What has Lovejoy or Clayton County decided about it?

Lovejoy (rated closed): The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits (September 29, 2026, atlantanewsfirst.com (opens in a new tab)); and Lovejoy: Lovejoy city council updated zoning code to explicitly prohibit data centers (September 25, 2026, ajc.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4794 Application Summary (Stillwater Technology Park (Lovejoy, DRI #4794)) (opens in a new tab), Georgia Department of Community Affairs, July 22, 2026
  2. Georgia DCA DRI #4794 Initial Form (Stillwater Technology Park (Lovejoy, DRI #4794)) (opens in a new tab), Georgia Department of Community Affairs, July 22, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Stillwater Technology Park (Lovejoy, DRI #4794)", https://datacenterrecord.org/projects/stillwater-technology-park-lovejoy-ga, last verified July 22, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Stillwater Technology Park (Lovejoy, DRI #4794)", https://datacenterrecord.org/projects/stillwater-technology-park-lovejoy-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
33.432928, -84.35936
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4794
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4794
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
Capacity, if disclosed
1.25 GW, the developer's figure
Rating of the county's rows
Closed
Published
November 11, 2026
Last verified
July 22, 2026
Not disclosed