Stillwater Development, LLC filed Georgia DCA DRI #4794 on July 22, 2026 for a 3,465,000 square foot, 1,250 MW data center campus at 11760 Panhandle Road in Lovejoy before withdrawing the application amid municipal opposition and Lovejoy's September 2026 data center ban. [1] Filings on the record specify 8 planned or operational buildings. [1] On the regulatory record, state permit status is Georgia DCA DRI #4794 application withdrawn. [1]
Equivalent to ~1,037,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 60% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
Equivalent to ~1,200 U.S. households (U.S. EPA 300 gal/day household baseline).
Stated annual local tax revenue: $25,000,000.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 11760 Panhandle Rd, Lovejoy, GA 30228.
650 permanent on site jobs disclosed.
Stated annual local tax revenue: $25,000,000.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Stillwater Technology Park (Lovejoy, DRI #4794).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 1.25 GW | the developer's figure | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 8 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 360,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | $25,000,000/yr | the developer's figure |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Clayton County and Lovejoy about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Lovejoy | The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits. | atlantanewsfirst.com (opens in a new tab) | |
| Lovejoy | Lovejoy city council updated zoning code to explicitly prohibit data centers. | ajc.com (opens in a new tab) |
FOX 5 Atlanta report on Lovejoy City Council and community proceedings in Lovejoy, GA: Data center controversy continues in Georgia | FOX 5 News (October 13, 2026).
"grounds. The city established a 50 ft buffer between the data center and the burial grounds, they say to ensure it is not destroyed. And a proposed data center in Lovejoy is no longer moving forward. City leaders say the developer has withdrawn its special administrative permit application and will instead pursue residential development for the property. Mayor Marci Fluellen says the"
"environment, and the community. That event comes as the city council continues considering how to regulate future data center development after approving a moratorium earlier this summer. Data centers are not going away. And I don't, you know, I think there are parts of Georgia where communities may actually want data centers because they might"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: stalled or cancelled (content date)
Stillwater Development, LLC filed Georgia DCA DRI #4794 on July 22, 2026 for a 3,465,000 square foot, 1,250 MW data center campus at 11760 Panhandle Road in Lovejoy before withdrawing the application amid municipal opposition and Lovejoy's September 2026 data center ban.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Hampton Technology Park (DRI #4624) Hampton, Henry County | 5 mi | Proposed | Hampton Technology Park Owner, LLC | 1.5 GW |
| Equinix Hampton Data Center Campus Hampton, Henry County | 5 mi | Being built | Equinix | 1 building |
| Strickland Tract Data Center Campus (Henry County, DRI #4251) Henry County | 9 mi | Proposed | Red Wolf DCD Properties, LLC | 2 buildings |
| QTS Fayetteville ATL2 East Campus (DRI #4603) Fayetteville, Fayette County | 9 mi | Proposed | QTS Data Centers | 4 buildings |
| QTS Atlanta Metro Fayetteville (ATL2) Fayetteville, Fayette County | 9 mi | Running | QTS Data Centers | 16 buildings |
| Digital Fort Gillem ATL 15 and 16 Campus (Forest Park, DRI #4482) Forest Park, Clayton County | 13 mi | Proposed | Digital Fort Gillem, LLC | 97 acres |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Stillwater Development, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: 1.25 GW (the developer's figure, apps.dca.ga.gov (opens in a new tab)). Water: 360,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
It is cancelled, since July 22, 2026. The newest entry: Stillwater Development, LLC filed Georgia DCA DRI #4794 on July 22, 2026 for a 3,465,000 square foot, 1,250 MW data center campus at 11760 Panhandle Road in Lovejoy before withdrawing the application amid municipal opposition and Lovejoy's September 2026 data center ban. [1]
Lovejoy (rated closed): The City of Lovejoy on Monday passed an ordinance banning data center construction within city limits (September 29, 2026, atlantanewsfirst.com (opens in a new tab)); and Lovejoy: Lovejoy city council updated zoning code to explicitly prohibit data centers (September 25, 2026, ajc.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Stillwater Technology Park (Lovejoy, DRI #4794). Last verified July 22, 2026. https://datacenterrecord.org/projects/stillwater-technology-park-lovejoy-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Stillwater Technology Park (Lovejoy, DRI #4794)
Data Center Record, "Stillwater Technology Park (Lovejoy, DRI #4794)", https://datacenterrecord.org/projects/stillwater-technology-park-lovejoy-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.