● Proposed Campus Announced January 13, 2026 · 4 Buildings · QTS Data Centers

QTS Fayetteville ATL2 East Campus (DRI #4603)

Street address West of Veterans Pkwy, Fayetteville, GA 30214, Fayette County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

QTS Eastwood, LLC filed Georgia DCA DRI #4603 on January 13, 2026 for ATL2 East, a 2,000,000 square foot data center campus expansion west of Veterans Parkway in Fayetteville, Fayette County. [1] Filings on the record specify 4 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4603 regional review filing. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
In local review
3. Tax & EDA Deal
$29,000,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4603 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
200,000 gal/day
the developer's figure

Equivalent to ~667 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $29,000,000.

Site & Buildings [2]
4 buildings
Georgia DCA DRI Initial Form

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: West of Veterans Pkwy, Fayetteville, GA 30214.

Taxes & Permanent Jobs [1]
$29,000,000/yr
the developer's figure

100 permanent on site jobs disclosed.

Stated annual local tax revenue: $29,000,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
200,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 667 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 667 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
4 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
QTS Data Centers attributed via corporate HQ or property filing
[1] apps.dca.ga.gov
Jobs once it runs
100 the developer's figure
Tax each year
$29,000,000 the developer's figure
Permitted legal entity
QTS Eastwood, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4603 state air permit register
State permit status
Georgia DCA DRI #4603 regional review filing the state's permit register, as of January 13, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it
The math behind the comparison
  1. QTS Fayetteville ATL2 East Campus (DRI #4603), water: 200,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 200,000 ÷ 300 = 666.67 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Fayetteville ATL2 East Campus (DRI #4603).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 200,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $29,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

What was decided

Acts of Fayette County and Fayetteville about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Fayetteville closed The City of Fayetteville adopted Ordinance 26-0-12 prohibiting new data centers across all municipal zoning districts. tomshardware.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    QTS Eastwood, LLC filed Georgia DCA DRI #4603 on January 13, 2026 for ATL2 East, a 2,000,000 square foot data center campus expansion west of Veterans Parkway in Fayetteville, Fayette County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS Atlanta Metro Fayetteville (ATL2) Fayetteville, Fayette County Less than 1 mi Running QTS Data Centers 16 buildings
Fairburn Technology Center (DRI #4213) Fairburn, Fulton County 7 mi Proposed Bohannon Road Venture, LLC 59.6 acres
Microsoft Palmetto Data Center (CCO06) Palmetto, Fulton County 8 mi Running Microsoft 2 buildings
T5 Data Centers Atlanta IV Campus (Coweta County, DRI #4079) Coweta County 9 mi Proposed T5 Data Centers 7 buildings
ATL03 Red Oak Data Center Campus (Union City) Union City, Fulton County 9 mi Proposed TA Realty / Burr Computer Environments 67.8 acres
T5 Data Centers Fairburn Campus Fairburn, Fulton County 9 mi Proposed T5 Data Centers 2 buildings

Blank cell: not disclosed by any source on file.

Common questions about QTS Fayetteville ATL2 East Campus (DRI #4603)

Answered directly from the verified filings and local actions on this page.

Who is building QTS Fayetteville ATL2 East Campus (DRI #4603)?

QTS Data Centers is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does QTS Fayetteville ATL2 East Campus (DRI #4603) say it needs?

Power: not disclosed by any source on file. Water: 200,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does QTS Fayetteville ATL2 East Campus (DRI #4603) stand today?
What has Fayetteville or Fayette County decided about it?

Fayetteville (rated closed): The City of Fayetteville adopted Ordinance 26-0-12 prohibiting new data centers across all municipal zoning districts (May 10, 2026, tomshardware.com (opens in a new tab)). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4603 Application Summary (QTS Fayetteville ATL2 East Campus (DRI #4603)) (opens in a new tab), Georgia Department of Community Affairs, January 13, 2026
  2. Georgia DCA DRI #4603 Initial Form (QTS Fayetteville ATL2 East Campus (DRI #4603)) (opens in a new tab), Georgia Department of Community Affairs, January 13, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Fayetteville ATL2 East Campus (DRI #4603)", https://datacenterrecord.org/projects/qts-fayetteville-atl2-east-ga, last verified January 13, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Fayetteville ATL2 East Campus (DRI #4603)", https://datacenterrecord.org/projects/qts-fayetteville-atl2-east-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.454353, -84.516761
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4603
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4603
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Rating of the county's rows
Closed
Published
November 11, 2026
Last verified
January 13, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · QTS Fayetteville ATL2 East Campus (DRI #4603) · 2 sources, 1 entry, 1 decision nearby · basis and source tier on every row · verified January 13, 2026

Download CSV JSON