● Proposed Campus Announced July 31, 2024 · 2 Buildings · Red Wolf DCD Properties, LLC

Strickland Tract Data Center Campus (Henry County, DRI #4251)

Street address Strickland Rd and Simpson Mill Rd, McDonough, GA 30253, Henry County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Red Wolf DCD Properties, LLC filed Georgia DCA DRI #4251 on July 31, 2024 (superseding earlier DRI #4198) for a 1,253,754 square foot data center campus along Strickland Road in unincorporated Henry County. [1] Filings on the record specify 2 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4251 regional review filing. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
In local review
3. Tax & EDA Deal
$2,700,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4251 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
4,000 gal/day
the developer's figure

Equivalent to ~13 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $2,700,000.

Site & Buildings [2]
2 buildings
Georgia DCA DRI Initial Form

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Strickland Rd and Simpson Mill Rd, McDonough, GA 30253.

Taxes & Permanent Jobs [1]
$2,700,000/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $2,700,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
4,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 13 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 13 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
2 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Red Wolf DCD Properties, LLC as stated by the source
[1] apps.dca.ga.gov
Tax each year
$2,700,000 the developer's figure
Permitted legal entity
Red Wolf DCD Properties, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4251, Georgia DCA DRI #4198 state air permit register
State permit status
Georgia DCA DRI #4251 regional review filing the state's permit register, as of July 31, 2024, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Strickland Tract Data Center Campus (Henry County, DRI #4251), water: 4,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 4,000 ÷ 300 = 13.33 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Red Wolf DCD Properties, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Strickland Tract Data Center Campus (Henry County, DRI #4251).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 4,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $2,700,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

What was decided

Acts of Henry County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hampton case by case At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl. hamptonga.gov (opens in a new tab)
January 6, 2026 McDonough, GA Henry County commissioners discuss data centers Henry County Board of Commissioners 3 clips

Atlanta News First report on Henry County Board of Commissioners and community proceedings in McDonough, GA: Henry County commissioners discuss data centers (January 6, 2026).

  1. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Yeah, that's right. Georgia is now one of the largest data center hubs in the country. And Henry County commissioners say they want to make sure some protections are in place for the people who live here as these data centers become more prevalent. Now, these commissioners say right now they don't have any standards in place to protect citizens or natural resources when it comes to data centers, and that's what they say this ordinance will do. While"
  2. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "commissioners say they know they are coming. Commission Chair Carla Harold said the county did not know about a data center being built in Hampton, Georgia until it was already approved by the city. An issue of who will provide the immense amount of water required prompted the county's water authority to pass their own set of ordinances for any future major water uses, forcing"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "feasibility study before they would agree to provide water. I just want to make sure that we have policy in place that protects you know our water supply, our water resources and that nothing is passed on to you [snorts] know the residents that if if"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Red Wolf DCD Properties, LLC filed Georgia DCA DRI #4251 on July 31, 2024 (superseding earlier DRI #4198) for a 1,253,754 square foot data center campus along Strickland Road in unincorporated Henry County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Hampton Technology Park (DRI #4624) Hampton, Henry County 5 mi Proposed Hampton Technology Park Owner, LLC 1.5 GW
Equinix Hampton Data Center Campus Hampton, Henry County 6 mi Being built Equinix 1 building
Stillwater Technology Park (Lovejoy, DRI #4794) Lovejoy, Clayton County 9 mi Stalled or cancelled Stillwater Development, LLC 1.25 GW
Wallace Jackson Data Center Campus (Spalding County, DRI #4599) Spalding County 10 mi Proposed Wallace Jackson, LLC 189.64 acres
75 South Data Center Campus (Spalding County, DRI #4607) Spalding County 10 mi Proposed Industrial VI Enterprises, LLC 450 MW
Project Spalding Data Center Campus (DRI #4425) Spalding County 11 mi Proposed Project Spalding Applicant 6 buildings

Blank cell: not disclosed by any source on file.

Common questions about Strickland Tract Data Center Campus (Henry County, DRI #4251)

Answered directly from the verified filings and local actions on this page.

Who is building Strickland Tract Data Center Campus (Henry County, DRI #4251)?

Red Wolf DCD Properties, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Strickland Tract Data Center Campus (Henry County, DRI #4251) say it needs?

Power: not disclosed by any source on file. Water: 4,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Strickland Tract Data Center Campus (Henry County, DRI #4251) stand today?
What has Henry County decided about it?

Hampton (rated case by case): At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl, hamptonga.gov (opens in a new tab). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4251 Application Summary (Strickland Tract Data Center Campus (Henry County, DRI #4251)) (opens in a new tab), Georgia Department of Community Affairs, July 31, 2024
  2. Georgia DCA DRI #4251 Initial Form (Strickland Tract Data Center Campus (Henry County, DRI #4251)) (opens in a new tab), Georgia Department of Community Affairs, July 31, 2024

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Strickland Tract Data Center Campus (Henry County, DRI #4251)", https://datacenterrecord.org/projects/georgia-dri-4251-strickland-tract-ga, last verified July 31, 2024. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Strickland Tract Data Center Campus (Henry County, DRI #4251)", https://datacenterrecord.org/projects/georgia-dri-4251-strickland-tract-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.391546, -84.213265
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4251
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4251
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
July 31, 2024
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed