Red Wolf DCD Properties, LLC filed Georgia DCA DRI #4251 on July 31, 2024 (superseding earlier DRI #4198) for a 1,253,754 square foot data center campus along Strickland Road in unincorporated Henry County. [1] Filings on the record specify 2 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4251 regional review filing. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Equivalent to ~13 U.S. households (U.S. EPA 300 gal/day household baseline).
Stated annual local tax revenue: $2,700,000.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: Strickland Rd and Simpson Mill Rd, McDonough, GA 30253.
Permanent operational headcount not yet disclosed on the record.
Stated annual local tax revenue: $2,700,000.
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Strickland Tract Data Center Campus (Henry County, DRI #4251).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 4,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | $2,700,000/yr | the developer's figure |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Henry County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Hampton | At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl. | hamptonga.gov (opens in a new tab) |
Atlanta News First report on Henry County Board of Commissioners and community proceedings in McDonough, GA: Henry County commissioners discuss data centers (January 6, 2026).
"Yeah, that's right. Georgia is now one of the largest data center hubs in the country. And Henry County commissioners say they want to make sure some protections are in place for the people who live here as these data centers become more prevalent. Now, these commissioners say right now they don't have any standards in place to protect citizens or natural resources when it comes to data centers, and that's what they say this ordinance will do. While"
"commissioners say they know they are coming. Commission Chair Carla Harold said the county did not know about a data center being built in Hampton, Georgia until it was already approved by the city. An issue of who will provide the immense amount of water required prompted the county's water authority to pass their own set of ordinances for any future major water uses, forcing"
"feasibility study before they would agree to provide water. I just want to make sure that we have policy in place that protects you know our water supply, our water resources and that nothing is passed on to you [snorts] know the residents that if if"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Red Wolf DCD Properties, LLC filed Georgia DCA DRI #4251 on July 31, 2024 (superseding earlier DRI #4198) for a 1,253,754 square foot data center campus along Strickland Road in unincorporated Henry County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Hampton Technology Park (DRI #4624) Hampton, Henry County | 5 mi | Proposed | Hampton Technology Park Owner, LLC | 1.5 GW |
| Equinix Hampton Data Center Campus Hampton, Henry County | 6 mi | Being built | Equinix | 1 building |
| Stillwater Technology Park (Lovejoy, DRI #4794) Lovejoy, Clayton County | 9 mi | Stalled or cancelled | Stillwater Development, LLC | 1.25 GW |
| Wallace Jackson Data Center Campus (Spalding County, DRI #4599) Spalding County | 10 mi | Proposed | Wallace Jackson, LLC | 189.64 acres |
| 75 South Data Center Campus (Spalding County, DRI #4607) Spalding County | 10 mi | Proposed | Industrial VI Enterprises, LLC | 450 MW |
| Project Spalding Data Center Campus (DRI #4425) Spalding County | 11 mi | Proposed | Project Spalding Applicant | 6 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Red Wolf DCD Properties, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: 4,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
Hampton (rated case by case): At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl, hamptonga.gov (opens in a new tab). 1 event is on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Strickland Tract Data Center Campus (Henry County, DRI #4251). Last verified July 31, 2024. https://datacenterrecord.org/projects/georgia-dri-4251-strickland-tract-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Strickland Tract Data Center Campus (Henry County, DRI #4251)
Data Center Record, "Strickland Tract Data Center Campus (Henry County, DRI #4251)", https://datacenterrecord.org/projects/georgia-dri-4251-strickland-tract-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.