Georgia DCA DRI #4425 was filed in March 2025 for Project Spalding, a 2,559,500 square foot data center campus on Tax Parcels 120 02016 and 120 001008 in unincorporated Spalding County. [1] Filings on the record specify 6 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4425 regional review filing. [1]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Spalding Data Center Campus (DRI #4425).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 6 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Georgia DCA DRI #4425 was filed in March 2025 for Project Spalding, a 2,559,500 square foot data center campus on Tax Parcels 120 02016 and 120 001008 in unincorporated Spalding County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| 75 South Data Center Campus (Spalding County, DRI #4607) Spalding County | 3 mi | Proposed | Industrial VI Enterprises, LLC | 450 MW |
| Wallace Jackson Data Center Campus (Spalding County, DRI #4599) Spalding County | 7 mi | Proposed | Wallace Jackson, LLC | 189.64 acres |
| Equinix Hampton Data Center Campus Hampton, Henry County | 11 mi | Being built | Equinix | 1 building |
| Strickland Tract Data Center Campus (Henry County, DRI #4251) Henry County | 11 mi | Proposed | Red Wolf DCD Properties, LLC | 2 buildings |
| Hampton Technology Park (DRI #4624) Hampton, Henry County | 11 mi | Proposed | Hampton Technology Park Owner, LLC | 1.5 GW |
| Amazon Web Services Butts County Campus Jackson, Butts County | 12 mi | Being built | Amazon Web Services | 4 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Project Spalding Applicant is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, since March 20, 2025. The newest entry, March 20, 2025: Georgia DCA DRI #4425 was filed in March 2025 for Project Spalding, a 2,559,500 square foot data center campus on Tax Parcels 120 02016 and 120 001008 in unincorporated Spalding County. [1]
No decision by Spalding County about data centers is on the record. The Spalding County page and the Georgia scorecard list every rated row the day a person publishes one.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Project Spalding Data Center Campus (DRI #4425). Last verified March 20, 2025. https://datacenterrecord.org/projects/georgia-dri-4425-project-spalding-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Project Spalding Data Center Campus (DRI #4425)
Data Center Record, "Project Spalding Data Center Campus (DRI #4425)", https://datacenterrecord.org/projects/georgia-dri-4425-project-spalding-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.