Industrial VI Enterprises, LLC filed Georgia DCA DRI #4607 on January 27, 2026 for the 75 South Data Center Campus, proposing 7 buildings totaling 2,240,000 square feet and 450 MW in unincorporated Spalding County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4607 regional review filing. [1]
Equivalent to ~373,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 22% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
Equivalent to ~100 U.S. households (U.S. EPA 300 gal/day household baseline).
Stated annual local tax revenue: $86,301,335.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: Tax Parcels 214 01016B and 214 01016, Spalding County, GA.
200 permanent on site jobs disclosed.
Stated annual local tax revenue: $86,301,335.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for 75 South Data Center Campus (Spalding County, DRI #4607).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 450 MW | the developer's figure | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 7 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 30,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | $86,301,335/yr | the developer's figure |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Industrial VI Enterprises, LLC filed Georgia DCA DRI #4607 on January 27, 2026 for the 75 South Data Center Campus, proposing 7 buildings totaling 2,240,000 square feet and 450 MW in unincorporated Spalding County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Project Spalding Data Center Campus (DRI #4425) Spalding County | 3 mi | Proposed | Project Spalding Applicant | 6 buildings |
| Wallace Jackson Data Center Campus (Spalding County, DRI #4599) Spalding County | 4 mi | Proposed | Wallace Jackson, LLC | 189.64 acres |
| Amazon Web Services Butts County Campus Jackson, Butts County | 9 mi | Being built | Amazon Web Services | 4 buildings |
| Strickland Tract Data Center Campus (Henry County, DRI #4251) Henry County | 10 mi | Proposed | Red Wolf DCD Properties, LLC | 2 buildings |
| Equinix Hampton Data Center Campus Hampton, Henry County | 12 mi | Being built | Equinix | 1 building |
| Hampton Technology Park (DRI #4624) Hampton, Henry County | 12 mi | Proposed | Hampton Technology Park Owner, LLC | 1.5 GW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Industrial VI Enterprises, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: 450 MW (the developer's figure, apps.dca.ga.gov (opens in a new tab)). Water: 30,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
No decision by Spalding County about data centers is on the record. The Spalding County page and the Georgia scorecard list every rated row the day a person publishes one.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. 75 South Data Center Campus (Spalding County, DRI #4607). Last verified January 27, 2026. https://datacenterrecord.org/projects/spalding-75-south-data-center-campus-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about 75 South Data Center Campus (Spalding County, DRI #4607)