● Proposed Campus Announced February 13, 2026 · 5 Buildings · Hampton Technology Park Owner, LLC

Hampton Technology Park (DRI #4624)

Street address Lower Woolsey Rd, PIN 003-01042003 and 003-01042000, Hampton, GA 30228, Henry County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Hampton Technology Park Owner, LLC filed Georgia DCA DRI #4624 on February 13, 2026 for a 5 building, 4,000,000 square foot, 1,500 MW peak load data center campus on 603.56 acres in Hampton, Henry County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4624 regional review filing. [1]

1. Land & Parcel
603.56 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
1.5 GW disclosed
5. Air & Water Permits
Georgia DCA DRI #4624 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
1.5 GW
the developer's figure

Equivalent to ~1,245,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 72% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water [1]
40,000 gal/day
the developer's figure

Equivalent to ~133 U.S. households (U.S. EPA 300 gal/day household baseline).

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
603.56 acres
the developer's figure

5 planned or operational data hall buildings.

Location: Lower Woolsey Rd, PIN 003-01042003 and 003-01042000, Hampton, GA 30228.

Taxes & Permanent Jobs [1]
150 jobs
the developer's figure

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
1.5 GW developer figure Equivalent to the continuous electricity demand of about 1,245,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.7 times the 2,080 MW generating capacity of Hoover Dam. About 0.15 times New York City's summer peak demand in 2024.
apps.dca.ga.gov (opens in a new tab)
Water usage
40,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 133 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 133 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
603.56 acres developer figure
[2] apps.dca.ga.gov
Buildings
5 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Hampton Technology Park Owner, LLC as stated by the source
[1] apps.dca.ga.gov
Jobs once it runs
150 the developer's figure
Permitted legal entity
Hampton Technology Park Owner, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4624 state air permit register
State permit status
Georgia DCA DRI #4624 regional review filing the state's permit register, as of February 13, 2026, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Tax each year
The math behind the comparison
  1. Hampton Technology Park (DRI #4624), capacity: 1,500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,500 ÷ 10,245 = 0.15 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

  1. Hampton Technology Park (DRI #4624), water: 40,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 40,000 ÷ 300 = 133.33 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Hampton Technology Park Owner, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Hampton Technology Park (DRI #4624).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1.5 GW the developer's figure
Site Footprint (Acres) 603.56 acres 603.56 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 5 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 40,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.

What was decided

Acts of Henry County and Hampton about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hampton case by case At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl. hamptonga.gov (opens in a new tab)
January 6, 2026 McDonough, GA Henry County commissioners discuss data centers Henry County Board of Commissioners 3 clips

Atlanta News First report on Henry County Board of Commissioners and community proceedings in McDonough, GA: Henry County commissioners discuss data centers (January 6, 2026).

  1. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "Yeah, that's right. Georgia is now one of the largest data center hubs in the country. And Henry County commissioners say they want to make sure some protections are in place for the people who live here as these data centers become more prevalent. Now, these commissioners say right now they don't have any standards in place to protect citizens or natural resources when it comes to data centers, and that's what they say this ordinance will do. While"
  2. Atlanta News First Broadcast Report Broadcast Report transcribed from local broadcast report
    "commissioners say they know they are coming. Commission Chair Carla Harold said the county did not know about a data center being built in Hampton, Georgia until it was already approved by the city. An issue of who will provide the immense amount of water required prompted the county's water authority to pass their own set of ordinances for any future major water uses, forcing"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "feasibility study before they would agree to provide water. I just want to make sure that we have policy in place that protects you know our water supply, our water resources and that nothing is passed on to you [snorts] know the residents that if if"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Hampton Technology Park Owner, LLC filed Georgia DCA DRI #4624 on February 13, 2026 for a 5 building, 4,000,000 square foot, 1,500 MW peak load data center campus on 603.56 acres in Hampton, Henry County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Equinix Hampton Data Center Campus Hampton, Henry County 1 mi Being built Equinix 1 building
Stillwater Technology Park (Lovejoy, DRI #4794) Lovejoy, Clayton County 5 mi Stalled or cancelled Stillwater Development, LLC 1.25 GW
Strickland Tract Data Center Campus (Henry County, DRI #4251) Henry County 5 mi Proposed Red Wolf DCD Properties, LLC 2 buildings
Project Spalding Data Center Campus (DRI #4425) Spalding County 11 mi Proposed Project Spalding Applicant 6 buildings
75 South Data Center Campus (Spalding County, DRI #4607) Spalding County 12 mi Proposed Industrial VI Enterprises, LLC 450 MW
Wallace Jackson Data Center Campus (Spalding County, DRI #4599) Spalding County 13 mi Proposed Wallace Jackson, LLC 189.64 acres

Blank cell: not disclosed by any source on file.

Common questions about Hampton Technology Park (DRI #4624)

Answered directly from the verified filings and local actions on this page.

Who is building Hampton Technology Park (DRI #4624)?

Hampton Technology Park Owner, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Hampton Technology Park (DRI #4624) say it needs?
Where does Hampton Technology Park (DRI #4624) stand today?
What has Hampton or Henry County decided about it?

Hampton (rated case by case): At the October 13, 2026 Hampton City Council public hearing, Henry County residents testified against the proposed Project Willow Calvin Center data center campus, citing spring fed groundwater depletion, electrical substation expansion, and cumulative industrial sprawl, hamptonga.gov (opens in a new tab). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4624 Application Summary (Hampton Technology Park (DRI #4624)) (opens in a new tab), Georgia Department of Community Affairs, February 13, 2026
  2. Georgia DCA DRI #4624 Initial Form (Hampton Technology Park (DRI #4624)) (opens in a new tab), Georgia Department of Community Affairs, February 13, 2026

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Hampton Technology Park (DRI #4624)", https://datacenterrecord.org/projects/georgia-dri-4624-hampton-technology-park-ga, last verified February 13, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Hampton Technology Park (DRI #4624)", https://datacenterrecord.org/projects/georgia-dri-4624-hampton-technology-park-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.381243, -84.303213
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4624
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4624
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
1.5 GW, the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
February 13, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, Interconnection

Researcher view · Hampton Technology Park (DRI #4624) · 2 sources, 1 entry, 1 decision nearby · basis and source tier on every row · verified February 13, 2026

Download CSV JSON