On the record as of October 27, 2026.

An act sits on the day it happened: the day its own sentence names, or the day its source gives for it. An act the record knows only from the date of the article that reported it sits under that article's month, one tap away, marked Reported with the article's date. So do background, plans and statements, which are not acts. The same act reported by several sources is one line with the reports behind it, on its day where any of them dates it. The milestones alone, for every state, are on the timeline.

8 acts on the line for New Hampshire, from 45 dated lines in the records' histories and the scorecard. 17 more acts are dated only by the article that reported them and sit under their month. 2 lines report an act already listed. 18 lines are background, plans or statements. 4 lines sit on a date other than the one they were filed under, because their own sentence names the day, the month or the year it happened; each says so. Where a line sits is read from its own words and the row is never changed (how dates are read).

Narrow the acts
Kind
Topic

Each count is the number of lines on this page the chip keeps. Topics are matched from the words of each line and are a finding aid, not a fact about the event.

2026 7 acts on the line from 8 reports; 17 reported, dated only by the article; 18 lines of background, plans and statements

September 2026 2 acts on the line; 11 reported; 13 lines of background, plans and statements

  1. reported Bow Data Center, Bow, New Hampshire

    An unnamed town official in Bow confirmed there were high level discussions with a company about bringing a 350 megawatt data center to the town

    indepthnh.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  2. Moratorium New Hampshire

    Gov. Kelly Ayotte announced this month that she intends to include a moratorium on data centers in the policy provisions of the upcoming state budget.

    concordmonitor.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 23, 2026)

Reported in September 2026, dated only by the article that carried them: 11 acts
  1. Filing Bow Data Center, Bow, New Hampshire

    Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project

    concordmonitor.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  2. Filing Bow Data Center (350 MW), Bow, New Hampshire

    Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid.

    concordmonitor.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  3. Moratorium rejected New Hampshire

    New Hampshire introduced HB 1265 for one year data center moratorium; bill failed.

    mashable.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  4. New Hampshire

    Republicans proposed bill granting data center developers permission by right to set up in any New Hampshire town or city

    unionleader.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  5. New Hampshire

    Democrats tabled the data center by right bill after public opposition to Nottingham proposal

    unionleader.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  6. Filing New Hampshire

    Maggiore and Stavis filed bill prohibiting non disclosure agreements between towns and data center developers and guaranteeing public voice on state owned land

    unionleader.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  7. Moratorium Nottingham, New Hampshire

    Nottingham residents voted in favor of a 12 month moratorium on any data center development within town limits

    ctpublic.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 9 Nottingham residents voted in favor of a 12 month moratorium on data center development with 1,335 votes in favor to 143 against nenc.news (opens in a new tab)
  8. Bow Data Center (350 MW), Bow, New Hampshire

    Merrimack Station coal fired power plant in Bow set to cease operations in 2028

    wmur.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  9. Filing Bow Data Center (350 MW), Bow, New Hampshire

    Granite Shore Power filed request for 350 megawatt facility interconnection to power grid

    wmur.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  10. Filing Bow Data Center, Bow, New Hampshire

    Eversource and Granite Shore Power filed an application to the Federal Energy Regulatory Committee for a viability study for an up to 350 megawatt interconnection at the Merrimack Station coal plant

    indepthnh.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  11. Bow Data Center (350 MW), Bow, New Hampshire

    Town official confirmed high level discussions between company and Bow about bringing data center to town

    nhpr.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for September 2026, not acts of their own: 13 lines of background, plans and statements
  1. Bow Data Center, Bow, New Hampshire

    A preliminary study will examine the viability of a potential 350 megawatt interconnection associated with Granite Shore Power related to the rumored Bow data center.

    unionleader.com (opens in a new tab) (a plan or a schedule, not an act yet)

  2. Bow Data Center, Bow, New Hampshire

    Data center would be located next to Merrimack Station power plant

    concordmonitor.com (opens in a new tab) (a plan or a schedule, not an act yet)

  3. Bow Data Center, Bow, New Hampshire

    Eversource has been in communication with a developer interested in building a data center in Bow

    concordmonitor.com (opens in a new tab) (a description, not an act)

  4. Nottingham, New Hampshire

    The vote was 1,335 in favor, to 143 against

    ctpublic.org (opens in a new tab) (no act in the sentence)

  5. Nottingham Data Center (unnamed developer), Nottingham, New Hampshire

    A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC

    nenc.news (opens in a new tab) (a plan or a schedule, not an act yet)

  6. New Hampshire

    New Hampshire will introduce a moratorium on AI data centers in the next state budget

    nhtalkradio.com (opens in a new tab) (a plan or a schedule, not an act yet)

  7. Bow Data Center, Bow, New Hampshire

    The project is proposed at the Merrimack Station, a coal fired power plant that ceased operations in September 2025

    nhtalkradio.com (opens in a new tab) (a description, not an act)

  8. Bow Data Center, Bow, New Hampshire

    Granite Shore Power is exploring a 350 megawatt data center project in Bow

    nhtalkradio.com (opens in a new tab) (a plan or a schedule, not an act yet)

  9. New Hampshire

    New Hampshire politicians and officials called for a statewide moratorium on AI data centers

    indepthnh.org (opens in a new tab) (a statement; who said what is on the statements pages)

  10. New Hampshire

    Governor Kelly Ayotte said she will introduce a moratorium against artificial intelligence data centers in the state's next budget.

    indepthnh.org (opens in a new tab) (a statement; who said what is on the statements pages)

  11. Bow Data Center, Bow, New Hampshire

    Granite Shore Power owns the 345 acre Merrimack Plant site

    indepthnh.org (opens in a new tab) (a description, not an act)

  12. Bow Data Center (350 MW), Bow, New Hampshire

    Data center would use Merrimack River for cooling water source

    nhpr.org (opens in a new tab) (a plan or a schedule, not an act yet)

  13. Bow Data Center (350 MW), Bow, New Hampshire

    Merrimack Station is former coal fired power plant that closed in September 2025

    nhpr.org (opens in a new tab) (a description, not an act)

August 2026 No acts on the line; 2 reported

Reported in August 2026, dated only by the article that carried them: 2 acts
  1. Ordinance Rochester, New Hampshire

    Rochester adopted ordinance prohibiting data centers in every zoning district except recycling industrial district, which requires conditional use permit

    wmur.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  2. Ordinance Rochester, New Hampshire

    Rochester amended Section 275-2.2 of general city ordinances to define data center as building, structure, facility, or campus used primarily for housing, operation, management, processing, storage, transmission, or distribution of digital data through computer servers and related IT infrastructure

    wmur.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

July 2026 No acts on the line; 1 reported

Reported in July 2026, dated only by the article that carried it: 1 act
  1. Moratorium Nottingham, New Hampshire

    Nottingham held a town vote on 12 month moratorium on data center construction by July 3, 2026

    nhpr.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

June 2026 2 acts on the line; 5 lines of background, plans and statements

  1. New Hampshire

    SB439 was defeated on June 13, 2026

    vnews.com (opens in a new tab), news outlet (the day its own sentence names)

  2. Filing reported Nottingham Data Center (unnamed developer), Nottingham, New Hampshire

    Moulton withdrew his application hours before the planning board meeting last Wednesday

    businessnhmagazine.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for June 2026, not acts of their own: 5 lines of background, plans and statements
  1. New Hampshire

    Senate Bill 439 would have created a statewide definition of data centers and granted local municipalities more authority over regulating them

    businessnhmagazine.com (opens in a new tab) (a plan or a schedule, not an act yet)

  2. New Hampshire

    Sen. Timothy Lang amendment would limit towns' ability to regulate data centers and allow them in commercial and industrial zones

    businessnhmagazine.com (opens in a new tab) (a plan or a schedule, not an act yet)

  3. New Hampshire

    The amended bill died in a bipartisan floor vote in the House, 304-11

    businessnhmagazine.com (opens in a new tab) (no act in the sentence)

  4. New Hampshire

    A Democratic bill would prohibit building data centers in the state and create a committee to study their environmental impact, but it failed in committee

    businessnhmagazine.com (opens in a new tab) (a plan or a schedule, not an act yet)

  5. Nottingham, New Hampshire

    The planning board's workshop meeting will be held at 7 p.m. on June 3 at the town office building

    businessnhmagazine.com (opens in a new tab) (a plan or a schedule, not an act yet)

May 2026 1 act on the line; 3 reported

  1. New Hampshire

    The amended bill passed the House Committee on Municipal and County Government along party lines on May 5

    businessnhmagazine.com (opens in a new tab), local outlet

Reported in May 2026, dated only by the article that carried them: 3 acts
  1. New Hampshire

    New Hampshire House tables data center bill

    vnews.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  2. New Hampshire

    State of New Hampshire made a decision on data centers

    indepthnh.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  3. New Hampshire

    House sets by right data center zoning bill aside in decisive vote

    newhampshirebulletin.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

April 2026 2 acts on the line from 3 reports

  1. Filing Bow Data Center (350 MW), Bow, New Hampshire

    Granite Shore Power filed request with Federal Energy Regulatory Commission in April 2026 to enter discussions with Eversource about connecting 350 megawatt project to power grid

    nhpr.org (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 1, 2026)

    1 more report of this
    1. April, no day given FERC filing shows Granite Shore Power requested viability study for data center project at Merrimack Station site in Bow, filed in April 2026 newhampshirebulletin.com (opens in a new tab)
  2. Filing Bow Data Center (350 MW), Bow, New Hampshire

    Public Service of New Hampshire, subsidiary of Eversource Energy, filed viability assessment with Granite Shore Power LLC in April 2026

    wmur.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 2, 2026)

2025 1 act on the line

September 2025 1 act on the line

  1. Bow Data Center, Bow, New Hampshire

    Merrimack Station, a coal fired power plant, ceased operations in September 2025 and was due for retirement in 2028

    indepthnh.org (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 2, 2026)