Data centers in Miami-Dade County, Florida
Miami-Dade County has 11 data centers on the record: 11 running. Miami-Dade County has a scorecard row with no rating yet.
The 11 data centers in Miami-Dade County
Every Miami-Dade County record 11 records · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| Nabiax and Telefonica KeyCenter Miami Data Center Miami, Miami-Dade County | Running Florida Department of Environmental Protection Stationary Emergency Generator and Commercial Facility Record (11300 NW 25th Street, Miami, FL 33172) | Nabiax / Telefonica | 12 | the developer's figure | site | 1 | 2026-11-06 | |
| CoreSite Miami Allapattah Data Center (MI1) Miami, Miami-Dade County | Running | CoreSite | 10 | the developer's figure | site | 1 | 2026-10-27 | |
| CoreSite Miami Doral Data Center (MI2) Doral, Miami-Dade County | Running | CoreSite | 12 | the developer's figure | site | 1 | 2026-10-27 | |
| DataBank Downtown Miami Carrier Hotel Data Center (MIA1) Miami, Miami-Dade County | Running | DataBank | 4 | the developer's figure | site | 2 | 2026-10-27 | |
| Digital Realty Downtown Miami Carrier Hotel (MIA10) Miami, Miami-Dade County | Running | Digital Realty | 10 | the developer's figure | site | 2 | 2026-10-27 | |
| EdgeConneX Miami Doral Data Center (EDCMIA01) Miami, Miami-Dade County | Running | EdgeConneX | 12 | the developer's figure | site | 1 | 2026-10-27 | |
| EdgeConneX Miami Gardens Data Center (EDCMIA02) Miami, Miami-Dade County | Running | EdgeConneX | 8 | the developer's figure | site | 1 | 2026-10-27 | |
| Equinix MI6 Miami Doral Data Center Doral, Miami-Dade County | Running | Equinix | 8 | the developer's figure | site | 2 | 2026-10-27 |
| Equinix Miami NAP of the Americas and Downtown Campus (MI1 and MI2) Miami, Miami-Dade County | Running | Equinix | 32 | the developer's figure | site | 1 | 2026-10-27 | |
|---|---|---|---|---|---|---|---|---|
| iM Critical Miami Data Center Miami, Miami-Dade County | Running | iM Critical | 8 | the developer's figure | site | 1 | 2026-10-27 | |
| QTS Miami Sweetwater Data Center (MIA1) Miami, Miami-Dade County | Running | QTS Data Centers | 10 | the developer's figure | site | 2 | 2026-10-27 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
The cities in Miami-Dade County on the record (3)
| City | Census GEOID | Projects | Rules |
|---|---|---|---|
| Miami | 1245000 | 0 | |
| Doral | 1217935 | 0 | |
| Miami Lakes | 1245100 | 1 |
A city without a record is listed, not linked.
What Miami-Dade County has decided 2 bodies, 0 decisions on the record
What the county and the cities in it have done about data centers: each body on its own row with its rating, open, case by case, restrictive or closed, never good or bad, and every vote, ordinance, moratorium or agreement one tap away, newest first, with its source. No dated decision is on the record yet.
| Body | Level | Rating | In force until | Latest act | Acts | Verified |
|---|---|---|---|---|---|---|
| Miami-Dade County | county | not rated | No dated act on this row yet. | 2026-09-22 | ||
| Miami Lakes | city | not rated | No dated act on this row yet. | 2026-09-10 |
A rating rests only on a binding act in force; "not rated" means no person has set one. Blank cell: no end date or count on the record for that column.
The rules across Florida · Report missing data or a local act
Nearby places with records
Distances run between the centers the Census Bureau gives each place. Every Florida county.
Disclosed figures
126 MW power
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 126 MW | 11 | 0 | 11 the developer's figure |
| Water, stated per day | 0 | 11 | ||
| Water, stated per year | 0 | 11 | ||
| Permanent jobs | 0 | 11 | ||
| Tax each year | 0 | 11 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 11 | 126 MW |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 11 tracked facilities in Miami-Dade County are for.
How the facilities are cooled
No source on file states how any of the 11 tracked facilities in Miami-Dade County are cooled.
About this data
Report a correction · Send a tip about Miami-Dade County · The rows here are part of the Florida export.
Cite this page
Data Center Record, "Data center records in Miami-Dade County, Florida", https://datacenterrecord.org/states/fl/miami-dade-county. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- county
- Census GEOID
- 12086
- Census geography
- County, Miami-Dade County
- Rating
- Not rated