Data Center Record.
Census GEOID: 12086 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 1 Building · CoreSite

CoreSite Miami Doral Data Center (MI2)

Street address 2100 NW 84th Avenue, Doral, FL 33122, Miami-Dade County verified address Exact, at the address [1] coresite.com

Overview, regulatory gates and specifications

CoreSite operates its MI2 Miami Doral colocation data center at 2100 NW 84th Avenue in Doral, Miami-Dade County, Florida. [1] Filings on the record specify disclosed capacity of 12 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Florida state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
12 MW
the developer's figure

Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2100 NW 84th Avenue, Doral, FL 33122.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
12 MW developer figure Equivalent to the continuous electricity demand of about 9,960 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
[1] coresite.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] coresite.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
CoreSite as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. CoreSite Miami Doral Data Center (MI2), capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0.0012 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: CoreSite
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for CoreSite Miami Doral Data Center (MI2).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 12 MW 12 MW the developer's figure [1] coresite.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] coresite.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Miami-Dade County and Doral about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Miami-Dade County One data center is set to open in northwest Miami-Dade this year nbcmiami.com (opens in a new tab)
Miami Lakes Miami Lakes Town Council set to consider item by Steven Herzberg to trigger development of ordinance defining and prohibiting dedicated data centers as principal use. floridapolitics.com (opens in a new tab)
Miami-Dade County Miami-Dade County village considering data center ban bizjournals.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Florida state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] coresite.com

Nearest data centers in Florida

Verified data center records in Florida within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Equinix MI6 Miami Doral Data Center Doral, Miami-Dade County 1 mi Running Equinix 8 MW
QTS Miami Sweetwater Data Center (MIA1) Miami, Miami-Dade County 3 mi Running QTS Data Centers 10 MW
Nabiax and Telefonica KeyCenter Miami Data Center Miami, Miami-Dade County 3 mi Running Nabiax / Telefonica 12 MW
EdgeConneX Miami Doral Data Center (EDCMIA01) Miami, Miami-Dade County 3 mi Running EdgeConneX 12 MW
CoreSite Miami Allapattah Data Center (MI1) Miami, Miami-Dade County 6 mi Running CoreSite 10 MW
Equinix Miami NAP of the Americas and Downtown Campus (MI1 and MI2) Miami, Miami-Dade County 9 mi Running Equinix 32 MW

Blank cell: not disclosed by any source on file.

Common questions about CoreSite Miami Doral Data Center (MI2)

Answered directly from the verified filings and local actions on this page.

Who is building CoreSite Miami Doral Data Center (MI2)?

CoreSite is the developer. No construction contractor is named on the record yet.

How much power and water does CoreSite Miami Doral Data Center (MI2) say it needs?

Power: 12 MW (the developer's figure, coresite.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does CoreSite Miami Doral Data Center (MI2) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Doral or Miami-Dade County decided about it?

Miami-Dade County: One data center is set to open in northwest Miami-Dade this year (reported September 22, 2026, nbcmiami.com (opens in a new tab)); and Miami Lakes: Miami Lakes Town Council set to consider item by Steven Herzberg to trigger development of ordinance defining and prohibiting dedicated data centers as principal use (reported September 10, 2026, floridapolitics.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. CoreSite Miami Doral Data Center (MI2) Official Disclosure (opens in a new tab), CoreSite, news outlet

1 source on file.

Regional grid context

This site is in the FRCC All (FRCC) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CoreSite Miami Doral Data Center (MI2)", https://datacenterrecord.org/projects/coresite-miami-mi2-doral-fl, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CoreSite Miami Doral Data Center (MI2)", https://datacenterrecord.org/projects/coresite-miami-mi2-doral-fl. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
25.793318, -80.333581
How the location is known
Location from the site's street address.
Location source
https://www.coresite.com/data-centers/miami-data-centers
Coordinate source
Miami-Dade County Property Appraiser / CoreSite
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows