Data centers in Hermantown, Minnesota

Hermantown has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Hermantown yet. St. Louis County's own decisions are on the St. Louis County page.

Updated · Every line below links to its source · How the record works

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

The data center in Hermantown

Each row is one site with its stage, its latest dated entry and what its sources disclose. A figure no source gives reads Not disclosed.

  1. Proposed Built from one source

    Google Hermantown Data Center

    Hermantown, St. Louis County · Google

    Latest, reported September 3, 2026: In March, Minnesota Power signed an agreement with Google to supply power to the proposed Hermantown data center. enr.com local outlet

    Land
    Not disclosed
    Power
    Not disclosed
    Water
    Not disclosed
    Tenant
    Not disclosed

Where

1 data center in Hermantown: proposed. A dashed edge means the exact site is not in the public record; every pin here marks a town or the county.

The outline is Hermantown's boundary from the U.S. Census Bureau. Tap a pin for that data center's facts and a link to its page.

What was said

Scott Jensen, Republican candidate for Minnesota State Auditor, warned that Google data center in Hermantown will alter Duluth's landscape and regional ecosystem through water demand, grid challenges, and St. Louis River runoff impacts
Scott Jensen, Republican candidate for Minnesota State Auditor · September 28, 2026 · paraphrased · Duluth News Tribune local outlet
DNR Deputy Director Randall Doneen raised concerns about the environmental review for the proposed Hermantown data center, including gaps in groundwater data and lack of alternative site analysis
Randall Doneen, Minnesota DNR Deputy Director · September 11, 2026 · paraphrased · FOX 9 Minneapolis-St. Paul local outlet
Josh Skelton, Minnesota Power CEO, said the modernization provides flexibility when extreme weather hits, system conditions change quickly, or energy is needed in a different place than expected.
Josh Skelton, Minnesota Power CEO · September 3, 2026 · paraphrased · Engineering News-Record local outlet

Every Minnesota statement, by speaker

4 more statements on this page

Andrea Zupancich, Republican candidate for Minnesota state Senate

Grant Hauschild as part of Senate Tax Committee greenlit bills giving tax breaks to data centers

September 10, 2026, MinnPost · MinnPost local outlet · the record (Paraphrased; said in the source itself)

Jobs for Minnesotans executive

Jobs for Minnesotans supports local data center development and trusts Minnesota's strict policies protecting environment, water quality, and energy generation

September 10, 2026, MinnPost · MinnPost local outlet · the record (Paraphrased; said in the source itself)

Republican candidate for Minnesota state Senate

Jobs for Minnesotans nonprofit board member Andrea Zupancich opposes tax breaks for data centers while running for state Senate against Grant Hauschild who supports them

September 10, 2026, MinnPost · MinnPost local outlet · the record (Paraphrased; said in the source itself)

The Hermantown data center faces opposition from residents opposed to its proposed $80 million property tax break and concerns about water, noise and power use.

September 3, 2026, Engineering News-Record · Engineering News-Record local outlet · the record (Paraphrased; said in the source itself)

Disclosed figures

nothing disclosed by 1 record

Power, water, jobs and tax, summed only where a data center disclosed the figure; what each facility is for; how each is cooled. Nothing here is estimated.

Power, water, jobs and tax

FigureDisclosed totalDisclosedNot disclosedBasis
PowerNot disclosed01Not disclosed by any of the 1 record
Water, stated per dayNot disclosed01Not disclosed by any of the 1 record
Water, stated per yearNot disclosed01Not disclosed by any of the 1 record
Permanent jobsNot disclosed01Not disclosed by any of the 1 record
Tax each yearNot disclosed01Not disclosed by any of the 1 record

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

By what the facilities are for

UseRecordsPowerWaterJobsTax each year
Not disclosed1Not disclosedNot disclosedNot disclosedNot disclosedNot disclosed: power, water, jobs, tax each year

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

What the facilities are for

No source on file states what any of the 1 tracked facility in Hermantown is for.

How the facilities are cooled

No source on file states how any of the 1 tracked facility in Hermantown is cooled.

Cite this page

Data Center Record, "Data centers in Hermantown, St. Louis County, Minnesota", https://datacenterrecord.org/states/mn/st-louis-county/hermantown, updated September 17, 2026.

Cite this page

Data Center Record, "Data center records in Hermantown, St. Louis County, Minnesota", https://datacenterrecord.org/states/mn/st-louis-county/hermantown. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

The rows here are part of the Minnesota export.

For researchers
Place id
us/mn/st-louis-county/hermantown
Level
city
Census GEOID
Not disclosed
Rating value
Not disclosed
Scale word
Not disclosed