Data centers in Fairfield, California
Fairfield has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Fairfield yet. Solano County's own decisions are on the Solano County page.
How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.
The data center in Fairfield
Every Fairfield record 1 record · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry |
|---|---|---|---|---|
| NorthPoint Development Fairfield Solano Data Center Campus Proposal Fairfield, Solano County | Proposed | NorthPoint Development / Canon Partners | 150 | NorthPoint Development and Canon Partners are proposing a 150 MW data center on a 300 acre industrial campus in northeast Fairfield, with PG&E studying power infrastructure and entitlements nearly complete. vallejosun.com (opens in a new tab) query feed August 17, 2026 |
A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
| Record | Place | Stage | Operator | MW | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| NorthPoint Development Fairfield Solano Data Center Campus Proposal | Fairfield, Solano | Proposed | NorthPoint Development / Canon Partners | 150 | the developer's figure | site | 1 | 2026-10-27 |
Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.
What Fairfield has decided
June 15, 2026 Fairfield, CA Fairfield City Council Meeting April 7, 2026
In Fairfield, Solano County (CA), Fairfield City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Fairfield City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
">> Good evening. I'm going to call this meeting of the Fairfield City Council to order. Madame Clerk, roll call, please. Council member Carr >> here, >> Council Member Panduro >> here. >> Council member Sandu >> here. >> Council member Tonison >> here. >> Council member Williams >> here. >> Vice Mayor Bertani >> here. >> And Mayor Moy >> here. >> Thank you. >> All right. And the invocation tonight, I"
- Fairfield City Council Official Deliberation Elected Official auto captions, unchecked
"your will. You possess power over everything. You run the whole universe as you like without any assistance. You are independent and eternal. The only power owner of the day of judgment. Oh our Lord, we only worship you and ask help from you. Please unite our hearts"
- Resident public comment Resident Public Comment auto captions, unchecked
"Now we'll go to council reports. Um, Councilwoman Williams, please. >> Thank you. Uh, I have three different events to well, three different things to report about. One was a tour of the Rockville Hills Regional Park with the ARACK. hopefully I'm saying that right with"
Using this data in a report? Support the record.
What happened
-
Now proposedNorthPoint Development Fairfield Solano Data Center Campus Proposal
vallejosun.com (opens in a new tab) query feed
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every California county.
Disclosed figures
150 MW power
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 150 MW | 1 | 0 | 1 the developer's figure |
| Water, stated per day | 0 | 1 | ||
| Water, stated per year | 0 | 1 | ||
| Permanent jobs | 0 | 1 | ||
| Tax each year | 0 | 1 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 1 | 150 MW |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Fairfield is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Fairfield is cooled.
About this data
Report a correction · Send a tip about Fairfield · The rows here are part of the California export.
Cite this page
Data Center Record, "Data center records in Fairfield, Solano County, California", https://datacenterrecord.org/states/ca/solano-county/fairfield. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 0623182
- Census geography
- Incorporated place, Fairfield city
- Rating
- Not rated