Data Center Record.
Census GEOID: 37063 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 2 Buildings · TierPoint

TierPoint Research Triangle Park (RTP)

Street address 99 TW Alexander Drive, Durham, NC 27709, Durham County verified address Exact, at the address [1] tierpoint.com

Overview, regulatory gates and specifications

TierPoint operates the Research Triangle Park data center campus at 99 TW Alexander Drive in Durham, Durham County, North Carolina. [1] Filings on the record specify disclosed capacity of 14 MW (the developer's figure), 2 planned or operational buildings. [1] Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
14 MW
the developer's figure

Equivalent to ~11,620 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.7% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 99 TW Alexander Drive, Durham, NC 27709.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
14 MW developer figure Equivalent to the continuous electricity demand of about 11,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
[1] tierpoint.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] tierpoint.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
TierPoint as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. TierPoint Research Triangle Park (RTP), capacity: 14 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 14 ÷ 10,245 = 0.0014 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: TierPoint
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for TierPoint Research Triangle Park (RTP).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 14 MW 14 MW the developer's figure [1] tierpoint.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page [1] tierpoint.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Durham County and Durham about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Durham County Durham County, NC paused data center development wunc.org (opens in a new tab)
Durham County Durham County voted for a pause on data centers govtech.com (opens in a new tab)
Durham County Durham County leaders weigh data center moratorium with exemptions for smaller ones abc11.com (opens in a new tab)
Durham County Durham County adopted a 9 month pause on data centers wral.com (opens in a new tab)
August 24, 2026 Durham, NC Durham County Board of Commissioners Late Night Data Center Moratorium Hearing Durham County Board of Commissioners 3 clips

At an August 24, 2026 hearing that drew so many speakers the board voted to extend the session until midnight, the Durham County Board of Commissioners weighed a countywide moratorium on data centers amid resident concerns over Duke Energy fossil fuel generation and water supplies.

  1. ABC11 Broadcast Report Broadcast Report transcribed from local broadcast report
    "really packing that meeting out and calling for a moratorium. They're pushing for a 32 month moratorium, and they called out some of their concerns that they have surrounding data centers here in the community. One big one. We heard this one before so much. That is the energy usage, the water usage, also calling out air pollution. I want to take you guys inside of that meeting so you can see"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "centers in Durham. The proposed moratorium would only apply to projects larger than 100,000ft , and that means smaller data centers could continue through the development process, particularly around areas such as Research Triangle Park. Now, during this moratorium, the county is expected to study the potential impacts of data centers, review how other North Carolina communities regulate their data centers, and also"
  3. ABC11 Broadcast Report Broadcast Report transcribed from local broadcast report
    "out their concerns about data centers in their community, pushing back against them. Some commissioners shared their concerns, too, as a long form moratorium could impact RTP. We've made it clear what we want. We want these loopholes removed, and we want the time to write a strong ordinance regulating all data centers. On behalf of the 55,000"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.

    [1] tierpoint.com

Nearest data centers in North Carolina

Verified data center records in North Carolina within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Inflow Data Center Durham, Durham County 2 mi Running 11:11 Systems 4 MW
CyrusOne Durham DUR1 and DUR2 Durham, Durham County 3 mi Running CyrusOne 12 MW
Flexential Raleigh (RAL01, RAL02, and RAL03) Morrisville, Wake County 4 mi Running Flexential 11 MW
American Tower Raleigh Data Center (RA1) Raleigh, Wake County 11 mi Running American Tower 2 MW
TierPoint Raleigh Raleigh, Wake County 16 mi Running TierPoint 5 MW
Southeast Raleigh data center Raleigh, Wake County 21 mi Stalled or cancelled Beacon Partners 1 building

Blank cell: not disclosed by any source on file.

Common questions about TierPoint Research Triangle Park (RTP)

Answered directly from the verified filings and local actions on this page.

Who is building TierPoint Research Triangle Park (RTP)?

TierPoint is the developer. No construction contractor is named on the record yet.

How much power and water does TierPoint Research Triangle Park (RTP) say it needs?

Power: 14 MW (the developer's figure, tierpoint.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does TierPoint Research Triangle Park (RTP) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Durham or Durham County decided about it?

Durham County: Durham County, NC paused data center development (reported August 26, 2026, wunc.org (opens in a new tab)); and Durham County: Durham County voted for a pause on data centers (reported August 25, 2026, govtech.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. TierPoint Research Triangle Park (RTP) Official Disclosure (opens in a new tab), TierPoint, news outlet

1 source on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "TierPoint Research Triangle Park (RTP)", https://datacenterrecord.org/projects/tierpoint-research-triangle-park-rtp-durham-nc, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "TierPoint Research Triangle Park (RTP)", https://datacenterrecord.org/projects/tierpoint-research-triangle-park-rtp-durham-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
35.896667, -78.878838
How the location is known
Location from the site's street address.
Location source
https://www.tierpoint.com/data-centers/
Coordinate source
TierPoint Research Triangle Park specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
14 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · TierPoint Research Triangle Park (RTP) · 1 source, 1 entry, 4 decisions nearby · basis and source tier on every row · verified October 27, 2026