American Tower operates the RA1 edge colocation data center at 6011 Chapel Hill Road in Raleigh, Wake County, North Carolina. [1] Filings on the record specify disclosed capacity of 2 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications. [1]
Equivalent to ~1,660 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.1% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 6011 Chapel Hill Road, Raleigh, NC 27607.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for American Tower Raleigh Data Center (RA1).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 2 MW | 2 MW | the developer's figure [1] americantower.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] americantower.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Wake County and Raleigh about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Raleigh | Raleigh enacted a data center moratorium just last week | bisnow.com (opens in a new tab) | |
| Cary | Cary approved an 18 month moratorium on data centers | abc11.com (opens in a new tab) | |
| Cary | Cary, NC adopted a data center pause or moratorium | govtech.com (opens in a new tab) |
Raleigh City Council voted on October 6, 2026 to enact a six month moratorium suspending development approvals for large data centers while residents packed council chambers demanding a longer 32 month pause.
"concerns that folks in this community had tonight as they packed those council chambers. Six months, they tell me, just isn't long enough to do the research to find out more on those potential impacts. But city leaders say they're not starting at square one. They've done the research. They've been doing this research well before"
"Community advocates pushed back against data centers and the city's temporary pause on them. During a rally. Their concerns were made clear six months isn't long enough. There's a lot that the city does not know. Can it get all this information in six months? That that becomes a really big question. The same energy outside filled council chambers Tuesday"
"Raleigh. This moratorium doesn't have a conditionality about it. It's simply time. So in six months, whether or not the city is able to do what it says it's going to do, the moratorium ends. In a 7 to 1 vote. The City Council approved a temporary pause on data centers development, a move that some say doesn't go far enough. What is the harm in giving Raleigh more time? We have a city of nearly half a million people, and there is still a"
Using this data in a report? Support the record.
Garner Town Council took up Agenda Item 1.3 on May 19, 2026, with Planning Director Jeff Triezenberg presenting a temporary development moratorium on permitting and approvals for data centers, data processing facilities, and cryptocurrency mining operations.
"in Garner. Thank you very much. With that, we'll move along to item 1.3, which is a moratorum for data centers to be considered. And we'll be calling from we'll be calling on our planning director, Mr. Jeff Treenberg, to give us an overview. This was something that council expressed some interest in at a recent meeting. there's a process to go through it. We just can't say no"
"to approve a temporary development moratorum on the permitting and issuance of various approvals for what we're terming data centers, data processing facilities, cryptocurrency mining operations and similar undefined uses. we don't expect this to be hopefully any longer than a year, perhaps sooner."
Using this data in a report? Support the record.
PBS North Carolina report on Apex Town Council and community proceedings in Apex, NC: Inside the Fight over Data Centers in North Carolina State Lines Special (February 14, 2026).
"Today we're going to have a fun conversation about data centers. Data centers are giant warehouses filled with thousands of computer servers. Every email, every stream, every photo you store, it all lives in a building like this. North Carolina already has several. Apple, Google, Meta, they've been here for years. But AI has triggered massive new demand and tech companies are proposing hyperscale data centers across"
"revenue, but they need enormous amounts of electricity and water. In the town of Apex, town leaders are weighing those trade offs right now. P I P Lorraine McEvoy lives in New Hill just outside of Apex close to the site of a proposed data center. I work for a health data technology company. So I'm very familiar with data centers. We use data centers every day. So not anti data center. However, anti hyperscale data center directly"
"near the Shearon Harris nuclear power plant. Four buildings designed to run around the clock powering AI and cloud services. No decision has been made, but the proposal has already drawn many neighbors to town hall. The number of people speaks volumes to the town council. We show up, we wear red, we try try pack out the house so that they can see, visibly, like people don't want this. Or, if it's going to have to be here, let's make sure it's something that we can all live with."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.
Verified data center records in North Carolina within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Flexential Raleigh (RAL01, RAL02, and RAL03) Morrisville, Wake County | 7 mi | Running | Flexential | 11 MW |
| TierPoint Raleigh Raleigh, Wake County | 9 mi | Running | TierPoint | 5 MW |
| Southeast Raleigh data center Raleigh, Wake County | 10 mi | Stalled or cancelled | Beacon Partners | 1 building |
| Inflow Data Center Durham, Durham County | 10 mi | Running | 11:11 Systems | 4 MW |
| TierPoint Research Triangle Park (RTP) Durham, Durham County | 11 mi | Running | TierPoint | 14 MW |
| CyrusOne Durham DUR1 and DUR2 Durham, Durham County | 13 mi | Running | CyrusOne | 12 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
American Tower is the developer. No construction contractor is named on the record yet.
Power: 2 MW (the developer's figure, americantower.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Raleigh: Raleigh enacted a data center moratorium just last week (October 1, 2026, bisnow.com (opens in a new tab)); and Cary: Cary approved an 18 month moratorium on data centers (reported August 28, 2026, abc11.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. American Tower Raleigh Data Center (RA1). Last verified October 27, 2026. https://datacenterrecord.org/projects/american-tower-ra1-raleigh-nc. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about American Tower Raleigh Data Center (RA1)
Data Center Record, "American Tower Raleigh Data Center (RA1)", https://datacenterrecord.org/projects/american-tower-ra1-raleigh-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.