Data Center Record.
Census GEOID: 37025 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Running Announced October 27, 2026 · 1 Building · Segra

Segra Kannapolis Data Center

Street address 465 Charles Babbage Lane, Kannapolis, NC 28081, Cabarrus County verified address Exact, at the address [1] echo.epa.gov

Overview, regulatory gates and specifications

Segra operates a commercial colocation data center at 465 Charles Babbage Lane on the North Carolina Research Campus in Kannapolis, Cabarrus County, North Carolina. [1] Filings on the record specify disclosed capacity of 4 MW (the developer's figure), 1 planned or operational building. [2] Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
North Carolina Department of
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
4 MW
the developer's figure

Equivalent to ~3,320 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 465 Charles Babbage Lane, Kannapolis, NC 28081.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
4 MW developer figure Equivalent to the continuous electricity demand of about 3,320 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.039 percent) of New York City's summer peak demand in 2024.
[2] segra.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] segra.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Segra as stated by the source
[2] segra.com
State permit status
North Carolina Department of Environmental Quality Stationary Emergency Generator and Commercial Facility Record (465 Charles Babbage Lane, Kannapolis, NC 28081) the state's permit register, as of November 6, 2026
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Segra Kannapolis Data Center, capacity: 4 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 4 ÷ 10,245 = 0.00039 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Segra
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Segra Kannapolis Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 4 MW 4 MW the developer's figure [2] segra.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] segra.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Cabarrus County and Kannapolis about data centers, on the record with their source. A rule about the area is not a decision about this record.

March 24, 2026 Harrisburg, NC Data center debate: Family TURNS DOWN $26 million to keep farmland Harrisburg City Council 2 clips

The National Desk report on Harrisburg City Council and community proceedings in Harrisburg, NC: Data center debate: Family TURNS DOWN $26 million to keep farmland (March 24, 2026).

  1. The National Desk Broadcast Report Broadcast Report transcribed from local broadcast report
    "half of that property with plans to make it an AI data center. Now, they aren't the only ones here. Dozens of other landowners in the area they've also been approached by a major AI company land in Mason County is reportedly valued at about $6,000 per acre. The offer that came in was roughly 10 times that amount. They call us old stupid farmers, you know, but we're not."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "disappearing, and we don't have any water and poison. We know we've had it. Now, despite that refusal the Huddleston family said the company revised its plans using land from owners who did agree to sell meaning that data center likely still going up in Mason County."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.

    [1] echo.epa.gov

Nearest data centers in North Carolina

Verified data center records in North Carolina within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Flexential Charlotte North (CLT4 and CLT5) Charlotte, Mecklenburg County 15 mi Running Flexential 12 MW
H5 Charlotte Charlotte, Mecklenburg County 15 mi Running H5 Data Centers 12 MW
Historic Charlotte building site data center Charlotte, Mecklenburg County 23 mi Proposed 1 building
Digital Realty Charlotte Charlotte, Mecklenburg County 23 mi Running Digital Realty 6 MW
Digital Realty Moores Chapel Road Data Center Charlotte, Mecklenburg County ~24 mi Proposed Digital Realty
DC74 Data Centers Charlotte (CLT1) Charlotte, Mecklenburg County 28 mi Running DC74 Data Centers 5 MW

Blank cell: not disclosed by any source on file.

Common questions about Segra Kannapolis Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Segra Kannapolis Data Center?

Segra is the developer, segra.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Segra Kannapolis Data Center say it needs?

Power: 4 MW (the developer's figure, segra.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Segra Kannapolis Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Kannapolis or Cabarrus County decided about it?

No decision by Kannapolis or Cabarrus County about data centers is on the record. The Cabarrus County page and the North Carolina scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. US EPA ECHO and North Carolina Department of Environmental Quality Stationary Generator & Parcel Record (465 Charles Babbage Lane, Kannapolis, NC 28081) (opens in a new tab), U.S. Environmental Protection Agency and North Carolina Department of Environmental Quality, November 6, 2026
  2. Segra Facility Specifications (465 Charles Babbage Lane, Kannapolis, NC 28081) (opens in a new tab), Segra, November 6, 2026

2 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Segra Kannapolis Data Center", https://datacenterrecord.org/projects/segra-kannapolis-nc, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Segra Kannapolis Data Center", https://datacenterrecord.org/projects/segra-kannapolis-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
35.504805, -80.62259
How the location is known
Location from the site's street address.
Location source
https://www.segra.com/
Coordinate source
Segra Kannapolis specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
4 MW, the developer's figure
Published
October 21, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Segra Kannapolis Data Center · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified November 6, 2026

Download CSV JSON