● Proposed Campus Announced March 7, 2025 · Microsoft

Microsoft Compass Creek Data Center

Street address 19515 Compass Creek Parkway, Leesburg, Virginia, Loudoun County county centroid County level, the center of the county [2] wjla.com

Overview, regulatory gates and specifications

Microsoft Corporation operates the Compass Creek data center campus (IAD01 through IAD05) at 19515 Compass Creek Parkway in Leesburg, Loudoun County, Virginia. Virginia DEQ minor NSR air permit action 74220 4, issued April 30, 2026, authorizes 75 emergency diesel engine generator sets totaling 213.65 MW of backup electrical capacity. [1] Microsoft's Leesburg data center violated air quality standards during power grid outage between June 27 and July 1, 2025 [2]

Verified Site & Permit Summary
Verified address
19515 Compass Creek Parkway, Leesburg, Virginia, Loudoun County county centroid
Operator / developer
Microsoft
Permit / registry ID
undefined: undefined [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
104 generators (313.5 MW) permitted
[1] deq.virginia.gov
Capital investment
$31 million developer figure
[2] wjla.com
Who leads it
Microsoft attributed via corporate HQ or property filing
[2] wjla.com
Permitted legal entity
Microsoft Corporation what a permit allows
[1] deq.virginia.gov [2] wjla.com
State air permit registration
74220 state air permit register
[1] deq.virginia.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Microsoft · Applicant / Shell LLC: Microsoft Corporation
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft Compass Creek Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators 104 units (313.5 MW) what a permit allows [1] deq.virginia.gov
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Loudoun County and Leesburg about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Loudoun County restrictive Virginia Loudoun County moved future projects to special exception process commercialobserver.com (opens in a new tab)
Loudoun County restrictive Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards patch.com (opens in a new tab)
Loudoun County restrictive Phase one of Loudoun County data center policy overhaul was approved in March 2025 and ended by right data center development except for already approved projects patch.com (opens in a new tab)
Loudoun County restrictive Loudoun County Board of Supervisors launched data center policy review project in 2024 patch.com (opens in a new tab)
Loudoun County restrictive Loudoun County had already removed data centers as a by right zoning option and is exploring removing by right status to grandfathered projects datacenterdynamics.com (opens in a new tab)
Loudoun County restrictive Loudoun County Board of Supervisors voted 7 to 1 on motion to pause data center applications for 12 months, effective immediately datacenterdynamics.com (opens in a new tab)
6 earlier decisions on the county's rows
DateWhoDecisionSource
Loudoun County restrictive Loudoun County Board of Supervisors voted 7-1-1 to direct staff to prepare a 12 month pause resolution on data center and substation applications, effective September 15, 2026. yahoo.com (opens in a new tab)
Loudoun County restrictive Staff recommendation is that Loudoun County board take no action on data center moratorium fox5dc.com (opens in a new tab)
Loudoun County restrictive Loudoun County supervisors scheduled to discuss possible data center moratorium at business meeting Tuesday at 4 p.m. fox5dc.com (opens in a new tab)
Loudoun County restrictive Virginia's Loudoun County is considering limits on new data centers after decades of rapid growth baltimoresun.com (opens in a new tab)
Loudoun County restrictive By 2008, Loudoun County launched a marketing push to lure more data center facilities to the area moneywise.com (opens in a new tab)
Loudoun County restrictive In 2000, Loudoun's zoning administrator determined that data centers could be treated like office buildings and built by right in office zoned areas without Board of Supervisors approval moneywise.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (source date; the content gives no date of its own)

    Microsoft's Leesburg data center violated air quality standards during power grid outage between June 27 and July 1, 2025

    [2] wjla.com

  2. · Status: running (content date)

    Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Microsoft Corporation, registration 74220 (permit action 74220-4), Loudoun County, on March 7, 2025. The permit action supersedes the earlier permit action dated August 16, 2024. The permit document authorizes 104 emergency backup generators totaling 313.5 MW of permitted backup generator rating at Leesburg (IAD01-02-03-04-05) Data Center, 19515 Compass Creek Parkway, Leesburg, VA 20175.

    [1] deq.virginia.gov

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: wjla.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Virginia

Verified data center records in Virginia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Amazon Data Services Inc - IAD-667, IAD-668, IAD-669, IAD-670, and IAD-671 Leesburg, Loudoun County Less than 1 mi Proposed Amazon Web Services
STACK NVA06 Leesburg, Loudoun County Less than 1 mi Running STACK Infrastructure 1 building
Compass Loudoun County campus Leesburg, Loudoun County Less than 1 mi Running Compass Datacenters
Vantage Data Centers Ashburn Ashburn, Loudoun County ~4 mi Running Vantage Data Centers 3 buildings
SDC Capital Partners - Belmont Innovation Campus Ashburn, Loudoun County ~6 mi Proposed SDC Capital Partners
Amazon Data Services, Inc. IAD-114 IAD-115 Ashburn, Loudoun County ~6 mi Proposed Amazon Web Services

Blank cell: not disclosed by any source on file.

Common questions about Microsoft Compass Creek Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Microsoft Compass Creek Data Center?

Microsoft is the developer, wjla.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Microsoft Compass Creek Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Microsoft Compass Creek Data Center stand today?
What has Leesburg or Loudoun County decided about it?

Loudoun County (rated restrictive): Virginia Loudoun County moved future projects to special exception process (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Loudoun County: Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards (reported September 21, 2026, patch.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Virginia DEQ Air Permit 74220-4: Microsoft Corp - Leesburg Data Center (IAD01-02-03-04-05) (Microsoft Corporation) (opens in a new tab), Virginia Department of Environmental Quality, March 7, 2025

Reporting

  1. Microsoft ordered nearly $2.5M fine for air pollution from Northern Virginia data center - WJLA (opens in a new tab), WJLA, September 16, 2026, local outlet

2 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Microsoft Compass Creek Data Center", https://datacenterrecord.org/projects/microsoft-compass-creek-data-center-leesburg-va, last verified October 26, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Microsoft Compass Creek Data Center", https://datacenterrecord.org/projects/microsoft-compass-creek-data-center-leesburg-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
39.11556, -77.56444
How the location is known
Location is the county center; exact site not disclosed.
Location source
the county seat point for Loudoun County (Leesburg) from the county seat list until a source places the parcel
Rating of the county's rows
Restrictive
Published
October 19, 2026
Last verified
October 26, 2026
Not disclosed
Coordinate source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Microsoft Compass Creek Data Center · 2 sources, 2 entries, 12 decisions nearby · basis and source tier on every row · verified October 26, 2026