Microsoft Corporation operates the Compass Creek data center campus (IAD01 through IAD05) at 19515 Compass Creek Parkway in Leesburg, Loudoun County, Virginia. Virginia DEQ minor NSR air permit action 74220 4, issued April 30, 2026, authorizes 75 emergency diesel engine generator sets totaling 213.65 MW of backup electrical capacity. [1] Microsoft's Leesburg data center violated air quality standards during power grid outage between June 27 and July 1, 2025 [2]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Microsoft Compass Creek Data Center.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | 104 units (313.5 MW) | what a permit allows [1] deq.virginia.gov | |
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Loudoun County and Leesburg about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Loudoun County | Virginia Loudoun County moved future projects to special exception process | commercialobserver.com (opens in a new tab) | |
| Loudoun County | Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards | patch.com (opens in a new tab) | |
| Loudoun County | Phase one of Loudoun County data center policy overhaul was approved in March 2025 and ended by right data center development except for already approved projects | patch.com (opens in a new tab) | |
| Loudoun County | Loudoun County Board of Supervisors launched data center policy review project in 2024 | patch.com (opens in a new tab) | |
| Loudoun County | Loudoun County had already removed data centers as a by right zoning option and is exploring removing by right status to grandfathered projects | datacenterdynamics.com (opens in a new tab) | |
| Loudoun County | Loudoun County Board of Supervisors voted 7 to 1 on motion to pause data center applications for 12 months, effective immediately | datacenterdynamics.com (opens in a new tab) |
| Date | Who | Decision | Source |
|---|---|---|---|
| Loudoun County | Loudoun County Board of Supervisors voted 7-1-1 to direct staff to prepare a 12 month pause resolution on data center and substation applications, effective September 15, 2026. | yahoo.com (opens in a new tab) | |
| Loudoun County | Staff recommendation is that Loudoun County board take no action on data center moratorium | fox5dc.com (opens in a new tab) | |
| Loudoun County | Loudoun County supervisors scheduled to discuss possible data center moratorium at business meeting Tuesday at 4 p.m. | fox5dc.com (opens in a new tab) | |
| Loudoun County | Virginia's Loudoun County is considering limits on new data centers after decades of rapid growth | baltimoresun.com (opens in a new tab) | |
| Loudoun County | By 2008, Loudoun County launched a marketing push to lure more data center facilities to the area | moneywise.com (opens in a new tab) | |
| Loudoun County | In 2000, Loudoun's zoning administrator determined that data centers could be treated like office buildings and built by right in office zoned areas without Board of Supervisors approval | moneywise.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (source date; the content gives no date of its own)
Microsoft's Leesburg data center violated air quality standards during power grid outage between June 27 and July 1, 2025
· Status: running (content date)
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Microsoft Corporation, registration 74220 (permit action 74220-4), Loudoun County, on March 7, 2025. The permit action supersedes the earlier permit action dated August 16, 2024. The permit document authorizes 104 emergency backup generators totaling 313.5 MW of permitted backup generator rating at Leesburg (IAD01-02-03-04-05) Data Center, 19515 Compass Creek Parkway, Leesburg, VA 20175.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: wjla.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Virginia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Data Services Inc - IAD-667, IAD-668, IAD-669, IAD-670, and IAD-671 Leesburg, Loudoun County | Less than 1 mi | Proposed | Amazon Web Services | |
| STACK NVA06 Leesburg, Loudoun County | Less than 1 mi | Running | STACK Infrastructure | 1 building |
| Compass Loudoun County campus Leesburg, Loudoun County | Less than 1 mi | Running | Compass Datacenters | |
| Vantage Data Centers Ashburn Ashburn, Loudoun County | ~4 mi | Running | Vantage Data Centers | 3 buildings |
| SDC Capital Partners - Belmont Innovation Campus Ashburn, Loudoun County | ~6 mi | Proposed | SDC Capital Partners | |
| Amazon Data Services, Inc. IAD-114 IAD-115 Ashburn, Loudoun County | ~6 mi | Proposed | Amazon Web Services |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Microsoft is the developer, wjla.com (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, as reported September 16, 2026. The newest entry, reported September 16, 2026: Microsoft's Leesburg data center violated air quality standards during power grid outage between June 27 and July 1, 2025 [2].
Loudoun County (rated restrictive): Virginia Loudoun County moved future projects to special exception process (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Loudoun County: Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards (reported September 21, 2026, patch.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Microsoft Compass Creek Data Center. Last verified October 26, 2026. https://datacenterrecord.org/projects/microsoft-compass-creek-data-center-leesburg-va. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Microsoft Compass Creek Data Center
Data Center Record, "Microsoft Compass Creek Data Center", https://datacenterrecord.org/projects/microsoft-compass-creek-data-center-leesburg-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.