Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 2 primary and local sources
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Belmont Holdings I, LLC, Loudoun Prop 1, LLC, and Loudoun Prop 2, LLC, registration 74321 (permit action 74321-2), Loudoun County, on September 28, 2026. The permit action supersedes the earlier permit action dated January 28, 2026. The permit document authorizes 186 emergency backup generators totaling 534.7 MW of permitted backup generator rating at 19560 and 19570 Hyperspace Lane and 43243 Goose Park Square (Belmont Innovation Campus), Ashburn, Virginia 20147. [1]
How much power it needs, how much water it would use and who would use it have not been disclosed.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for SDC Capital Partners - Belmont Innovation Campus.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | 186 units (534.7 MW) | what a permit allows [1] deq.virginia.gov | |
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Loudoun County and Ashburn about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Loudoun County | Virginia Loudoun County moved future projects to special exception process | commercialobserver.com (opens in a new tab) | |
| Loudoun County | Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards | patch.com (opens in a new tab) | |
| Loudoun County | Phase one of Loudoun County data center policy overhaul was approved in March 2025 and ended by right data center development except for already approved projects | patch.com (opens in a new tab) | |
| Loudoun County | Loudoun County Board of Supervisors launched data center policy review project in 2024 | patch.com (opens in a new tab) | |
| Loudoun County | Loudoun County had already removed data centers as a by right zoning option and is exploring removing by right status to grandfathered projects | datacenterdynamics.com (opens in a new tab) | |
| Loudoun County | Loudoun County Board of Supervisors voted 7 to 1 on motion to pause data center applications for 12 months, effective immediately | datacenterdynamics.com (opens in a new tab) |
| Date | Who | Decision | Source |
|---|---|---|---|
| Loudoun County | Loudoun County Board of Supervisors voted 7-1-1 to direct staff to prepare a 12 month pause resolution on data center and substation applications, effective September 15, 2026. | yahoo.com (opens in a new tab) | |
| Loudoun County | Staff recommendation is that Loudoun County board take no action on data center moratorium | fox5dc.com (opens in a new tab) | |
| Loudoun County | Loudoun County supervisors scheduled to discuss possible data center moratorium at business meeting Tuesday at 4 p.m. | fox5dc.com (opens in a new tab) | |
| Loudoun County | Virginia's Loudoun County is considering limits on new data centers after decades of rapid growth | baltimoresun.com (opens in a new tab) | |
| Loudoun County | By 2008, Loudoun County launched a marketing push to lure more data center facilities to the area | moneywise.com (opens in a new tab) | |
| Loudoun County | In 2000, Loudoun's zoning administrator determined that data centers could be treated like office buildings and built by right in office zoned areas without Board of Supervisors approval | moneywise.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Belmont Holdings I, LLC, Loudoun Prop 1, LLC, and Loudoun Prop 2, LLC, registration 74321 (permit action 74321-2), Loudoun County, on September 28, 2026. The permit action supersedes the earlier permit action dated January 28, 2026. The permit document authorizes 186 emergency backup generators totaling 534.7 MW of permitted backup generator rating at 19560 and 19570 Hyperspace Lane and 43243 Goose Park Square (Belmont Innovation Campus), Ashburn, Virginia 20147.
Verified data center records in Virginia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Data Services, Inc. IAD-114 IAD-115 Ashburn, Loudoun County | Less than 1 mi | Proposed | Amazon Web Services | |
| Amazon Data Services IAD-215 Ashburn, Loudoun County | Less than 1 mi | Proposed | Amazon Web Services | |
| CloudHQ - Darab Ventures One, Two, Six LLC Ashburn, Loudoun County | Less than 1 mi | Proposed | CloudHQ | |
| DataBank - Zayo Group, LLC Ashburn, Loudoun County | Less than 1 mi | Proposed | DataBank | |
| Amazon Data Services, Inc. IAD-6 IAD-13 IAD-54 Ashburn, Loudoun County | Less than 1 mi | Proposed | Amazon Web Services | |
| Sabey Data Centers - Intergate Ashburn, LLC Ashburn, Loudoun County | Less than 1 mi | Proposed | Sabey Data Centers |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
SDC Capital Partners is the developer, sdccapitalpartners.com (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is waiting on permits, since September 28, 2026. The newest entry: Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Belmont Holdings I, LLC, Loudoun Prop 1, LLC, and Loudoun Prop 2, LLC, registration 74321 (permit action 74321-2), Loudoun County, on September 28, 2026. [1]
Loudoun County (rated restrictive): Virginia Loudoun County moved future projects to special exception process (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Loudoun County: Loudoun County holding two open house meetings on September 28 and 30, 2026 to discuss phase two data center policy standards (reported September 21, 2026, patch.com (opens in a new tab)). 12 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. SDC Capital Partners - Belmont Innovation Campus. Last verified September 28, 2026. https://datacenterrecord.org/projects/belmont-holdings-i-loudoun-74321-va. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about SDC Capital Partners - Belmont Innovation Campus
Data Center Record, "SDC Capital Partners - Belmont Innovation Campus", https://datacenterrecord.org/projects/belmont-holdings-i-loudoun-74321-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.