● RunningAnnounced April 18, 2026 · 1 Building · Iron Mountain Data Centers
Iron Mountain Manassas Campus (VA-1)
Street address11680 Hayden Road, Manassas, VA 20109, Prince William Countypermit coordinatesExact, the point of the EPA's facility record [2] echo.epa.gov
Overview, regulatory gates and specifications
Iron Mountain Data Centers operates the Manassas (VA-1) data center campus at 11680 Hayden Road in Manassas, Prince William County, Virginia, registered in the EPA Facility Registry Service (FRS ID 110070144508). [1] Filings on the record specify 1 planned or operational building. [2] Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Iron Mountain Information Management, LLC, registration 74112 (permit action 74112-5), Prince William County, on April 18, 2026. The permit action supersedes the earlier permit action dated October 16, 2024. The permit document authorizes 58 emergency backup generators totaling 159.42 MW of permitted backup generator rating at Iron Mountain Information Management, LLC, VA1 11680 Hayden Road, Manassas, VA 20109, VA2 11660 Hayden Road, Manassas, VA 20109, VA3 11640 Hayden Road, Manassas, VA 20109, VA6 7745 Wellington Road, Manassas, VA 20109, VA7 8330 Bethlehem Road, Manassas, VA 20109, VA8/9 TBD Wellington Road, Manassas, VA 20109, VA10 11451 Hayden Rd, Manassas, VA 20109. [1]
✓1. Land & Parcel
Parcel located
✓2. Local Zoning
Zoning approved
○3. Tax & EDA Deal
Not yet on file
✓4. Utility Grid Queue
Energized
✓5. Air & Water Permits
58 generators permitted
What happens next:Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Cooling & Water
Not disclosed
Daily water volume not stated in public filings
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Technical specification and permit ledger
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Iron Mountain Manassas Campus (VA-1).
Water useA state water right filing or a water supply agreement.
Who would use itA lease announcement or a tenant named in a filing.
Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Prince William County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
Prince William County Board of Supervisors approved changes ending by right data center development and shrinking Data Center Opportunity Zone Overlay District from 9,698 acres to 3,641 acres
Prince William County Board of Supervisors voted unanimously to reduce Data Center Opportunity Zone Overlay District from 9,700 acres to 3,650 acres, eliminating by right development outside the overlay and requiring special use permits.
Prince William County Board of Supervisors voted unanimously to eliminate automatic approvals and data center opportunity overlay district, requiring special use permits and public hearings for all future data center projects
The amendment includes a 90 day grace period for qualifying projects already built or being built in the county, as well as those already with a site plan that has passed the quality control threshold
The overlay district allows data centers to be built by right within its parameters; the countywide amendment will drastically shrink the size and scope of the overlay from its originally adopted form which dates back over a decade to May 2016
Prince William County Board of Supervisors is expected to vote on zoning changes to restrict by right data center development, shrinking the Data Center Opportunity Zone Overlay District.
Prince William Board of County Supervisors voted 8 to 0 on September 22, 2026 to end by right data center development countywide, requiring special use permits for future projects
Supervisors voted 8 to 0 to reject a comprehensive plan amendment for Dulles South Innovation Center, a proposed campus covering about 1,940 acres with 43 million square feet of data center space
Prince William County supervisors scheduled for September 22 to consider restrictions that would subject more data center projects to individual review
September 22, 2026Prince William County, VAPrince William Board of County Supervisors Data Center Overlay VotePrince William Board of County Supervisors3 clips
The Prince William Board of County Supervisors voted unanimously to repeal automatic by right data center zoning approvals inside the Data Center Opportunity Overlay District, requiring a Special Use Permit and public hearing for every future project.
NBC4 Washington Broadcast ReportBroadcast Reporttranscribed from local broadcast report
"when the county was eager to expand its data center footprint, a previous Board of supervisors created what it called a data center opportunity overlay, which is a long, fancy name that basically says, here's an area of the county that we think data centers should go. And as long as these data center developers meet a certain set of criteria, they can just go ahead and build there. They don't need special approval from the Board"
Deshundra Jefferson, Chair, Prince William Board of County SupervisorsElected Officialtranscribed from local broadcast report
"local government stuff. That basically means data centers are still allowed to develop in Prince William County, but they can't just build in that area anymore without being scrutinized at the county level. Now, every new data center in Prince William County will have to come before the Board of Supervisors, which the board chair thinks is a much more transparent approach to addressing this type of development. These data center developers will need a special use permit if they want to"
NBC4 Washington Broadcast ReportBroadcast Reporttranscribed from local broadcast report
"done extensive reporting on data centers. He explains what this means for any new development in the county. The change in Prince William County is significant, and it really reflects a massive shift in the county's posture and how it's going to address data center development. And it feels pretty reflective of the public sentiment on data centers and how that's been changing over the last decade. To explain what changed in Prince William"
Deshundra Jefferson & Prince William Board of County SupervisorsChair, Prince William Board of County Supervisors
Venue:Prince William County Data Center Opportunity Overlay Policy Record
"Established the 2016 Data Center Opportunity Overlay District allowing data center campuses inside designated overlay zones to be approved by right through administrative site plan review without individual Special Use Permit hearings."
Prince William Board of County Supervisors Unanimous 8 to 0 Vote Stripping By Right Approvals in Data Center Overlay District
Prince William County Zoning Text Amendment · September 22, 2026 (Unanimous 8 to 0 Vote)
Agency or Venue:Prince William Board of County Supervisors
"In a unanimous 8 to 0 vote on September 22, 2026, Chair Deshundra Jefferson and the Prince William Board of County Supervisors repealed automatic by right approvals in the Data Center Opportunity Overlay District, shrinking the overlay from 9,698 acres to 3,641 acres and requiring a Special Use Permit and public hearing for every future data center."
Ann WheelerChair at Large, Prince William Board of County Supervisors
Venue:Prince William Board of County Supervisors 27 Hour Public Hearing
"Approving the 2,100 acre Prince William Digital Gateway rezoning along Pageland Lane will secure $400 million in annual commercial tax revenue to fund county schools and reduce the residential real estate tax burden while maintaining strict environmental buffers."
Prince William Circuit Court Void Ab Initio Ruling and September 2026 Board Repeal of By Right Data Center Overlay
Prince William Circuit Court Void Ab Initio Order · BOCS Sept 2026 5 to 3 Repeal Vote
Agency or Venue:Prince William County Circuit Court and Board of County Supervisors
"A Prince William County Circuit Court judge voided the December 2023 Digital Gateway rezoning ab initio for unlawful public notice; QTS withdrew its appeal in July 2026, and in September 2026 the newly elected Board of County Supervisors voted 5 to 3 to strip by right data center approvals from the Data Center Opportunity Zone Overlay."
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: running (content date)
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Iron Mountain Information Management, LLC, registration 74112 (permit action 74112-5), Prince William County, on April 18, 2026. The permit action supersedes the earlier permit action dated October 16, 2024. The permit document authorizes 58 emergency backup generators totaling 159.42 MW of permitted backup generator rating at Iron Mountain Information Management, LLC, VA1 11680 Hayden Road, Manassas, VA 20109, VA2 11660 Hayden Road, Manassas, VA 20109, VA3 11640 Hayden Road, Manassas, VA 20109, VA6 7745 Wellington Road, Manassas, VA 20109, VA7 8330 Bethlehem Road, Manassas, VA 20109, VA8/9 TBD Wellington Road, Manassas, VA 20109, VA10 11451 Hayden Rd, Manassas, VA 20109.
Prince William County (rated restrictive): Prince William County Board of Supervisors approved changes ending by right data center development and shrinking Data Center Opportunity Zone Overlay District from 9,698 acres to 3,641 acres (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Prince William County: Supervisors approved 90 day transition period for properties within overlay, rejecting motion to eliminate grace period entirely (reported September 23, 2026, patch.com (opens in a new tab)). 26 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Cite this page
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Iron Mountain Manassas Campus (VA-1). Last verified October 26, 2026. https://datacenterrecord.org/projects/iron-mountain-data-center-manassas-va1-va. Accessed November 17, 2026.
Get this data
Every row on this page is available to download with its source, its basis and the date it was last verified.
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Use this data in your work
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Reporters, researchers and nonprofits: free to use and republish with attribution under CC BY-NC 4.0. If you are working on a story or a study and want the full state or national file, ask and we will send it.
Utilities, law firms, lenders, consultants and AI teams: commercial use, bulk feeds and API access require a commercial license. Revenue from commercial licenses pays for the public record so it stays free for residents and local governments.
States, counties and cities: a public agency can use the record free, link to it, or contact us for an embed or feed of the records in its jurisdiction. Agencies that keep their own permit tracker can send us their rows and we will link each one to the primary document and keep the history. Contact us.
Request data or a license
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Keep the record open
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
FiguresEach figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
LicenseData CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this pageData Center Record, "Iron Mountain Manassas Campus (VA-1)", https://datacenterrecord.org/projects/iron-mountain-data-center-manassas-va1-va, last verified October 26, 2026.CSV · JSON
Data Center Record, "Iron Mountain Manassas Campus (VA-1)", https://datacenterrecord.org/projects/iron-mountain-data-center-manassas-va1-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
EPA ECHO Detailed Facility Report (FRS ID 110070144508) at 11680 Hayden Road, Manassas, VA 20109.
Coordinate source
EPA ECHO FRS ID 110070144508
Location last verified
October 24, 2026
Rating of the county's rows
Restrictive
Published
October 21, 2026
Last verified
October 26, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed
Researcher view · Iron Mountain Manassas Campus (VA-1) · 2 sources, 2 entries, 26 decisions nearby · basis and source tier on every row · verified October 26, 2026