Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 2 primary and local sources
InfoBunker operates a hardened underground commercial colocation data center at 308 T Avenue in Boone, Boone County, Iowa. [1] Filings on the record specify disclosed capacity of 6 MW (the developer's figure), 1 planned or operational building. [2] Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 308 T Avenue, Boone, IA 50036.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
We would not do something for Boone that would harm the economy, the infrastructure, the environment.(October 20, 2026)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for InfoBunker Underground Data Center (Boone).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 6 MW | 6 MW | the developer's figure [2] infobunker.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [2] infobunker.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Boone County and Boone about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Boone County | The Boone County Board of Supervisors adopted a moratorium on new data center projects. | qctimes.com (opens in a new tab) | |
| Boone County | Boone County Board of Supervisors adopted moratorium on new data center projects for up to one year | yahoo.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
Verified data center records in Iowa within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| LightEdge Ames Municipal Airport Data Center Ames, Story County | ~12 mi | Proposed | LightEdge | 25 MW |
| Apple Waukee Data Center Campus Waukee, Dallas County | 30 mi | Being built | Apple | 100 MW |
| IP Pathways Urbandale Data Center (DSM1) Urbandale, Polk County | 30 mi | Running | IP Pathways | 4 MW |
| US Signal and OneNeck Des Moines Data Center (IA01 Waukee) Waukee, Dallas County | 31 mi | Running | OneNeck IT Solutions | 6 MW |
| Aureon West Des Moines Data Center West Des Moines, Polk County | 33 mi | Running | Aureon Network Services | 4 MW |
| Meta Altoona Data Center Campus Altoona, Polk County | 33 mi | Running | Meta | 400 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
InfoBunker is the developer, infobunker.com (opens in a new tab). No construction contractor is named on the record yet.
Power: 6 MW (the developer's figure, infobunker.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Boone County: The Boone County Board of Supervisors adopted a moratorium on new data center projects (October 9, 2026, qctimes.com (opens in a new tab)); and Boone County: Boone County Board of Supervisors adopted moratorium on new data center projects for up to one year (reported September 11, 2026, yahoo.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the MRO West (MROW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. InfoBunker Underground Data Center (Boone). Last verified November 6, 2026. https://datacenterrecord.org/projects/infobunker-boone-ia. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about InfoBunker Underground Data Center (Boone)
Data Center Record, "InfoBunker Underground Data Center (Boone)", https://datacenterrecord.org/projects/infobunker-boone-ia. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.