● Proposed Campus Announced October 8, 2025 · 2 Buildings · The Cook and Company

Big Red Apple Innovation Corridor (Habersham County, DRI #4558)

Street address 1900 Level Grove Rd, Cornelia, GA 30531, Habersham County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

The Cook and Company filed Georgia DCA DRI #4558 on October 8, 2025 for the 284 acre Big Red Apple Innovation Corridor technology and data center development at 1900 Level Grove Road in Habersham County. [1] Filings on the record specify 2 planned or operational buildings. [2] On the regulatory record, state permit status is Georgia DCA DRI #4558 regional review filing. [1]

1. Land & Parcel
284 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4558 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
1,500,000 gal/day
the developer's figure

Equivalent to ~5,000 U.S. households (U.S. EPA 300 gal/day household baseline).

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
284 acres
the developer's figure

2 planned or operational data hall buildings.

Location: 1900 Level Grove Rd, Cornelia, GA 30531.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
1,500,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 5,000 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 5,000 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
284 acres developer figure
[2] apps.dca.ga.gov
Buildings
2 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
The Cook and Company as stated by the source
[1] apps.dca.ga.gov
Permitted legal entity
The Cook and Company the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4558, Georgia DCA DRI #4557 state air permit register
State permit status
Georgia DCA DRI #4558 regional review filing the state's permit register, as of October 8, 2025, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Big Red Apple Innovation Corridor (Habersham County, DRI #4558), water: 1,500,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 1,500,000 ÷ 300 = 5,000 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: The Cook and Company
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Big Red Apple Innovation Corridor (Habersham County, DRI #4558).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 284 acres 284 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 2 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 1,500,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    The Cook and Company filed Georgia DCA DRI #4558 on October 8, 2025 for the 284 acre Big Red Apple Innovation Corridor technology and data center development at 1900 Level Grove Road in Habersham County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Maysville GA1 Data Center Campus Maysville, Jackson County 19 mi Being built Northern Data Group 1 building
Project Turbo Data Center Campus (Hall County, DRI #4522) Hall County 24 mi Proposed Project Turbo, LLC 3 buildings
QTS Suwanee (SUW1) Suwanee, Gwinnett County 43 mi Running QTS Data Centers 2 buildings
Amazon Web Services Forsyth County Campus (ATL057) Forsyth County 44 mi Being built Amazon Web Services 1 building
Serverfarm Atlanta (ATL1 Suwanee) Suwanee, Gwinnett County 44 mi Running Serverfarm 14 MW
ADP Alpharetta Data Center (DC1) Alpharetta, Fulton County 49 mi Running Automatic Data Processing, Inc. 1 building

Blank cell: not disclosed by any source on file.

Common questions about Big Red Apple Innovation Corridor (Habersham County, DRI #4558)

Answered directly from the verified filings and local actions on this page.

Who is building Big Red Apple Innovation Corridor (Habersham County, DRI #4558)?

The Cook and Company is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Big Red Apple Innovation Corridor (Habersham County, DRI #4558) say it needs?

Power: not disclosed by any source on file. Water: 1,500,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Big Red Apple Innovation Corridor (Habersham County, DRI #4558) stand today?
What has Habersham County decided about it?

No decision by Habersham County about data centers is on the record. The Habersham County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4558 Application Summary (Big Red Apple Innovation Corridor (Habersham County, DRI #4558)) (opens in a new tab), Georgia Department of Community Affairs, October 8, 2025
  2. Georgia DCA DRI #4558 Initial Form (Big Red Apple Innovation Corridor (Habersham County, DRI #4558)) (opens in a new tab), Georgia Department of Community Affairs, October 8, 2025

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Big Red Apple Innovation Corridor (Habersham County, DRI #4558)", https://datacenterrecord.org/projects/georgia-dri-4558-big-red-apple-innovation-corridor-ga, last verified October 8, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Big Red Apple Innovation Corridor (Habersham County, DRI #4558)", https://datacenterrecord.org/projects/georgia-dri-4558-big-red-apple-innovation-corridor-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
34.515343, -83.559576
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4558
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4558
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Published
October 21, 2026
Last verified
October 8, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Big Red Apple Innovation Corridor (Habersham County, DRI #4558) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified October 8, 2025

Download CSV JSON