Data Center Record.
Census GEOID: 13117 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Being Built Announced September 21, 2023 · 1 Building · Amazon Web Services

Amazon Web Services Forsyth County Campus (ATL057)

Street address New Boyd Rd, Duluth, GA 30024, Forsyth County permit coordinates Exact, the point of the EPA's facility record [2] air.gaepd.org

Overview, regulatory gates and specifications

Amazon Data Services, Inc. holds Georgia EPD Air Quality Permit No. 7374-117-0093 (B 01 to 0) issued September 21, 2023 for the ATL057 data center facility on New Boyd Road in southern Forsyth County. [2] Filings on the record specify 1 planned or operational building. [2] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-117-0093 (B 01-0) issued. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia EPD Air Quality Perm
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
GA EPD Air Quality Permit

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: New Boyd Rd, Duluth, GA 30024.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[2] air.gaepd.org
Backup generators
7 generators permitted
[2] air.gaepd.org
Capital investment
Not disclosed
Who leads it
Amazon Web Services attributed via corporate HQ or property filing
[2] air.gaepd.org
Permitted legal entity
Amazon Data Services, Inc. what a permit allows
[2] air.gaepd.org [2] air.gaepd.org
State air permit registration
GA EPD AIRS 117-00093, GA EPD Permit 7374-117-0093-B-01-0, EPA FRS 110071524431 state air permit register
[2] air.gaepd.org
State permit status
Georgia EPD Air Quality Permit No. 7374-117-0093 (B 01-0) issued the state's permit register, as of September 21, 2023, last verified November 11, 2026
[2] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Web Services Forsyth County Campus (ATL057).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building GA EPD Air Quality Permit [2] air.gaepd.org
Cooling & Water System
Backup Diesel / Gas Generators 7 units what a permit allows [2] air.gaepd.org
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    Amazon Data Services, Inc. holds Georgia EPD Air Quality Permit No. 7374-117-0093 (B 01 to 0) issued September 21, 2023 for the ATL057 data center facility on New Boyd Road in southern Forsyth County.

    [2] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Serverfarm Atlanta (ATL1 Suwanee) Suwanee, Gwinnett County 2 mi Running Serverfarm 14 MW
QTS Suwanee (SUW1) Suwanee, Gwinnett County 3 mi Running QTS Data Centers 2 buildings
ADP Alpharetta Data Center (DC1) Alpharetta, Fulton County 9 mi Running Automatic Data Processing, Inc. 1 building
STACK Infrastructure ATL01 Alpharetta Alpharetta, Fulton County 10 mi Running STACK Infrastructure 1 building
Flexential Atlanta Norcross (ATL1 / ATL2) Norcross, Gwinnett County 10 mi Running Flexential 3.6 MW
Alpharetta North Point Data Center (ATL1 NP) Alpharetta, Fulton County 10 mi Running ATL1 NP Data Center 1 building

Blank cell: not disclosed by any source on file.

Common questions about Amazon Web Services Forsyth County Campus (ATL057)

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Web Services Forsyth County Campus (ATL057)?

Amazon Web Services is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Forsyth County Campus (ATL057) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Web Services Forsyth County Campus (ATL057) stand today?
What has Forsyth County decided about it?

No decision by Forsyth County about data centers is on the record. The Forsyth County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO Detailed Facility Report (110071524431) (opens in a new tab), U.S. Environmental Protection Agency, September 21, 2023

Reporting

  1. Georgia EPD Air Quality Permit 7374-117-0093-B-01-0 (Amazon Web Services Forsyth County Campus (ATL057)) (opens in a new tab), Georgia Environmental Protection Division, September 21, 2023, news outlet

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Forsyth County Campus (ATL057)", https://datacenterrecord.org/projects/aws-forsyth-county-atl057-ga, last verified September 21, 2023. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Forsyth County Campus (ATL057)", https://datacenterrecord.org/projects/aws-forsyth-county-atl057-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
34.063486, -84.0911
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-28844
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110071524431
Location last verified
November 11, 2026
Published
November 11, 2026
Last verified
September 21, 2023
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Web Services Forsyth County Campus (ATL057) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified September 21, 2023

Download CSV JSON