● Proposed Campus Announced August 14, 2025 · 3 Buildings · Project Turbo, LLC

Project Turbo Data Center Campus (Hall County, DRI #4522)

Street address 2400 O'Kelly Rd, Gainesville, GA 30507, Hall County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Project Turbo, LLC filed Georgia DCA DRI #4522 on August 14, 2025 for a 900,000 square foot multi building data center campus at 2400 O'Kelly Road in unincorporated Hall County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4522 regional review filing. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
In local review
3. Tax & EDA Deal
$25,000,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4522 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
300,000 gal/day
the developer's figure

Equivalent to ~1,000 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $25,000,000.

Site & Buildings [2]
3 buildings
Georgia DCA DRI Initial Form

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 2400 O'Kelly Rd, Gainesville, GA 30507.

Taxes & Permanent Jobs [1]
$25,000,000/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $25,000,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
300,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 1,000 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 1,000 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
3 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Project Turbo, LLC as stated by the source
[1] apps.dca.ga.gov
Tax each year
$25,000,000 the developer's figure
Permitted legal entity
Project Turbo, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4522 state air permit register
State permit status
Georgia DCA DRI #4522 regional review filing the state's permit register, as of August 14, 2025, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Project Turbo Data Center Campus (Hall County, DRI #4522), water: 300,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 300,000 ÷ 300 = 1,000 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Project Turbo, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Turbo Data Center Campus (Hall County, DRI #4522).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 3 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 300,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $25,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Project Turbo, LLC filed Georgia DCA DRI #4522 on August 14, 2025 for a 900,000 square foot multi building data center campus at 2400 O'Kelly Road in unincorporated Hall County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Maysville GA1 Data Center Campus Maysville, Jackson County 13 mi Being built Northern Data Group 1 building
QTS Suwanee (SUW1) Suwanee, Gwinnett County 20 mi Running QTS Data Centers 2 buildings
Serverfarm Atlanta (ATL1 Suwanee) Suwanee, Gwinnett County 21 mi Running Serverfarm 14 MW
Amazon Web Services Forsyth County Campus (ATL057) Forsyth County 21 mi Being built Amazon Web Services 1 building
Big Red Apple Innovation Corridor (Habersham County, DRI #4558) Habersham County 24 mi Proposed The Cook and Company 284 acres
ADP Alpharetta Data Center (DC1) Alpharetta, Fulton County 29 mi Running Automatic Data Processing, Inc. 1 building

Blank cell: not disclosed by any source on file.

Common questions about Project Turbo Data Center Campus (Hall County, DRI #4522)

Answered directly from the verified filings and local actions on this page.

Who is building Project Turbo Data Center Campus (Hall County, DRI #4522)?

Project Turbo, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Project Turbo Data Center Campus (Hall County, DRI #4522) say it needs?

Power: not disclosed by any source on file. Water: 300,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Project Turbo Data Center Campus (Hall County, DRI #4522) stand today?
What has Hall County decided about it?

No decision by Hall County about data centers is on the record. The Hall County page and the Georgia scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4522 Application Summary (Project Turbo Data Center Campus (Hall County, DRI #4522)) (opens in a new tab), Georgia Department of Community Affairs, August 14, 2025
  2. Georgia DCA DRI #4522 Initial Form (Project Turbo Data Center Campus (Hall County, DRI #4522)) (opens in a new tab), Georgia Department of Community Affairs, August 14, 2025

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Project Turbo Data Center Campus (Hall County, DRI #4522)", https://datacenterrecord.org/projects/georgia-dri-4522-project-turbo-ga, last verified August 14, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Project Turbo Data Center Campus (Hall County, DRI #4522)", https://datacenterrecord.org/projects/georgia-dri-4522-project-turbo-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
34.225306, -83.780806
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4522
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4522
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Published
October 21, 2026
Last verified
August 14, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Project Turbo Data Center Campus (Hall County, DRI #4522) · 2 sources, 1 entry, 0 decisions nearby · basis and source tier on every row · verified August 14, 2025

Download CSV JSON