Data Center Record.

The sourced public record of data center development.

States · Texas · El Paso County

El Paso, El Paso County

no published rating 1 data center project

No capacity figures disclosed. A rating belongs to the scorecard row for this city; the events beneath it are what it rests on.

Last verified

Projects on the record
1
being built
1
How much power is disclosed
Not disclosed
What officials said
0 statements
Sources read here
0

Every figure above is computed from the records on this page at build time. Power is summed only where a project disclosed it; nothing is estimated.

What has been disclosed in El Paso

FigureDisclosed totalDisclosedNot disclosedBasis
PowerNot disclosed01
Water, stated per dayNot disclosed01
Water, stated per yearNot disclosed01
Permanent jobsNot disclosed01
Tax each yearNot disclosed01

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends. Nothing here is modeled or estimated by the record.

By what the facilities are for

UseRecordsPowerWaterJobsTax each year
Not disclosed1Not disclosedNot disclosedNot disclosedNot disclosed

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

What the facilities are for

No source on file states what any of the 1 tracked facility in El Pasois for. The use is recorded as not disclosed until one does.

Projects

  • being builtMeta El Paso data center

    Meta's El Paso Data Center in El Paso, Texas, which broke ground in 2025.

    El Paso, El Paso County · Capacity not disclosed · Last verified September 8, 2026

El Paso, year by year

On the record as of September 8, 2026.

The chart counts what is on the record: 1 published project in El Paso, with 4 dated events, 0 of them jurisdiction actions. A project counts in a year by the status its history shows at the end of that year, and its capacity, water and noise figures are the ones disclosed for it now, applied to every year it is on the record. Capacity is summed only where a source disclosed it; the count of projects without a disclosed figure sits beside every sum. A year with nothing on it has nothing on the record yet, which is not the same as nothing having happened.

Milestones Projects on the record at year end 0 1 Disclosed capacity at year end, MW 0 1 2023 2024 2025 2026, Under construction: 1 project, 0 MW disclosed, 1 with capacity not disclosed 2026
Operational Under construction Announced, proposed, permitting or approved Milestone, one dot per flagged event Tap a year or a dot to open that year. Stalled and cancelled projects stay in the yearly totals below and off the bars.
Narrow the events in every year
Event

Topics are matched from the words of each summary and are a finding aid, not a fact about the event. Counts in the chart do not change with the filters.

2026 1 project on the record at year end, 4 events

At the end of 2026

Operational
0 projects, 0 MW disclosed
Under construction
1 project, 0 MW disclosed, 1 with capacity not disclosed
Announced, proposed, permitting or approved
0 projects, 0 MW disclosed

Capacity, by how it was disclosed

Not disclosed for any of the 1 project on the record.

Water, by how it was disclosed

Not disclosed for any of the 1 project on the record.

Noise, by how it was disclosed

Not disclosed for any of the 1 project on the record.

Sound levels are not summed. The range is the lowest and highest level a source stated.

Events in 2026

  1. March 26, 2026 (content date) Otherbeing built Meta El Paso data center : Meta plans to add enough clean and renewable energy to match 100 percent of the electricity use of El Paso data center Source, query feed . Developer Meta
  2. March 26, 2026 (content date) Otherbeing built Meta El Paso data center : Meta announced a $500,000 grant to support workforce development in partnership with El Paso public schools Source, query feed . Developer Meta
  3. March 26, 2026 (content date) Groundbreakingbeing built Meta El Paso data center : Meta broke ground on El Paso Data Center last year (2025) Source, query feed . Developer Meta
  4. March 26, 2026 (content date) Otherbeing built Meta El Paso data center : Meta El Paso Data Center will grow to 1 gigawatt Source, query feed . Developer Meta

Close 2026

2025 0 projects on the record at year end, 0 events

At the end of 2025

Operational
0 projects, 0 MW disclosed
Under construction
0 projects, 0 MW disclosed
Announced, proposed, permitting or approved
0 projects, 0 MW disclosed

Capacity, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Water, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Noise, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Sound levels are not summed. The range is the lowest and highest level a source stated.

Events in 2025

No dated event on the record in 2025.

Close 2025

2024 0 projects on the record at year end, 0 events

At the end of 2024

Operational
0 projects, 0 MW disclosed
Under construction
0 projects, 0 MW disclosed
Announced, proposed, permitting or approved
0 projects, 0 MW disclosed

Capacity, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Water, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Noise, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Sound levels are not summed. The range is the lowest and highest level a source stated.

Events in 2024

No dated event on the record in 2024.

Close 2024

2023 0 projects on the record at year end, 0 events

At the end of 2023

Operational
0 projects, 0 MW disclosed
Under construction
0 projects, 0 MW disclosed
Announced, proposed, permitting or approved
0 projects, 0 MW disclosed

Capacity, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Water, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Noise, by how it was disclosed

Not disclosed for any of the 0 projects on the record.

Sound levels are not summed. The range is the lowest and highest level a source stated.

Events in 2023

No dated event on the record in 2023.

Close 2023

The same chart for the whole state is at Texas, year by year, and for every state at the national timeline.

This page as data CSVJSON
Cite this page

Data Center Record, "Data center records in El Paso, El Paso County, Texas", https://datacenterrecord.org/states/tx/el-paso-county/el-paso. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

The rows here are part of the Texas export. Know of a filing, docket or project in El Paso that is missing? Send a tip.

For researchers
Place id
us/tx/el-paso-county/el-paso
Level
city
Census GEOID
Not disclosed
Rating value
Not disclosed