Lansing has 1 data center on the record; it is being built. No city rule about data centers is on the record for Lansing yet. Tompkins County's own decisions are on the Tompkins County page.
How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.
The data center in Lansing
Every Lansing record1 record · blank cell: not disclosed · sort by any column
Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.
What Lansing has decided
September 29, 2025Lansing, NYLansing Town Board TeraWulf Cayuga Lake AI Data Center HearingLansing Town Board3clips
At a September 29, 2025 public hearing in Tompkins County, New York, Lansing Town Supervisor Ruth Groff and residents weighed public outcry against TeraWulf's proposed AI data center at the former Cayuga coal plant site on the shore of Cayuga Lake.
Ruth Groff, Town Supervisor, Town of LansingElected Officialtranscribed from the official recording
"Hanna Devanny reports. >> Neighbors in Lansing voicing their concerns over plans to build a 180 acre data center off the shore of Cayuga Lake. Ruth Groff, the Lansing town supervisor, says those concerns are being considered before a vote is made. >> There has been a lot of public outcry against it for environmental reasons and for"
Resident public commentResident Public Commenttranscribed from the official recording
"environment. >> The electricity use and water use are probably the biggest factors when it comes to environmental footprint of data centers. >> Tara Wolf CEO Sean Farrell, addressing concerns over water usage, saying the facility would use an enclosed loop cooling system, meaning no water will be taken out of Cayuga Lake or pushed out. >> It doesn't actually use"
Lansing Town Board MemberElected Officialtranscribed from the official recording
"two main primary loops. >> Water is used to cool the computers. It goes through a chiller before it's recycled and continues to loop again. The water initially comes from utility water. >> There's no environmental impacts. >> I data centers can cause problems with both water supply. >> Experts say this could make neighboring communities have unusable water, a claim Farrell denies. >> And that closed loop system"
TeraWulf Inc. Chief Operating Officer Nazar KhanChief Operating Officer, TeraWulf Inc.
Venue:Cayuga Lake Former Coal Plant Site Redevelopment Announcement
"Represented that converting the former Cayuga coal plant site on Cayuga Lake into a high performance AI data center would reuse existing industrial infrastructure without adverse lake or neighborhood impacts."
Column B · Primary Government Record
Town of Lansing Board Review & Public Outcry Over Cayuga Lake Water and Noise Impacts
Lansing Town Board Hearing Record (Sept 29, 2025)
Agency or Venue:Lansing Town Board
"At the September 29, 2025 Lansing Town Board review, Town Supervisor Ruth Groff confirmed the board was weighing sustained public opposition over Cayuga Lake water intake, thermal discharge, and shoreline industrial zoning before any permit vote."
83 miles awayMonroe County: 1 data center on the record.
95 miles awayGenesee County: 1 data center on the record.
Distances run between the centers the Census Bureau gives each place. Every New York county.
Disclosed figures
300 MW power
Power, water, jobs and tax, summed only where a data center disclosed the figure; what each facility is for; how each is cooled. Nothing here is estimated.
Power, water, jobs and tax
Figure
Disclosed total
Disclosed
Without a figure
Basis
Power
300 MW
1
0
1 the developer's figure
Water, stated per day
0
1
Water, stated per year
0
1
Permanent jobs
0
1
Tax each year
0
1
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
Use
Records
Power
Water
Jobs
Tax each year
No stated use
1
300 MW
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Lansing is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Lansing is cooled.
FiguresOnly what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
LicenseData CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this pageData Center Record, "Data centers in Lansing, Tompkins County, New York", https://datacenterrecord.org/states/ny/tompkins-county/lansing, updated October 27, 2026.CSV · JSON
Data Center Record, "Data center records in Lansing, Tompkins County, New York", https://datacenterrecord.org/states/ny/tompkins-county/lansing. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
Researcher view · Lansing, Tompkins County, New York · 1 record, 0 rule rows · Census GEOID 3641223 · basis and source tier on every row · verified October 27, 2026