The 11 data centers in Chicago

Every Chicago record 11 records · blank cell: not disclosed · sort by any column

Facility and county Stage Operator Power (MW) Latest entry Basis Located Tier Verified
CoreSite Chicago Campus (CH1 / CH2) Chicago, Cook County Running Illinois DCEO Data Center Investment Program Certified (2020, Coresite, L.P.) CoreSite site 1 2026-11-06
HydraVault Chicago Data Center Chicago, Cook County Proposed Illinois DCEO Data Center Investment Program Certified (2025, HydraVault LLC) HydraVault LLC site 1 2026-11-06
Metro Edge Chicago Data Center (Illinois Medical District) Chicago, Cook County Proposed Illinois DCEO Data Center Investment Program Certified (2023, MEDP Mission Critical Facility, LLC dba Metro Edge) Metro Edge Development Partners site 1 2026-11-06
QTS Chicago (CHI1) Chicago, Cook County Running Illinois DCEO Data Center Investment Program Certified (2021, Quality Technology Service (QTS)) QTS Data Centers EPA registry 1 2026-11-06
Serverfarm Chicago (CH1 Canal Street) Chicago, Cook County Running Illinois DCEO Data Center Investment Program Certified (2023, Serverfarm LLC dba SF CH1, LLC) Serverfarm site 1 2026-11-06
Centersquare Chicago (ORD1 Cermak) Chicago, Cook County Running Centersquare EPA registry 2 2026-10-26
DataBank Chicago Campus (ORD1 / ORD2 / ORD3 / ORD4) Chicago, Cook County Running DataBank site 2 2026-10-26
Digital Realty 350 East Cermak (ORD10 / ORD11) Chicago, Cook County Running Digital Realty site 1 2026-10-26
Equinix Downtown Chicago Campus (CH1 / CH2 / CH4) Chicago, Cook County Running Equinix EPA registry 2 2026-10-26
TierPoint Chicago Campus (Polk / West Franklin Park) Chicago, Cook County Running TierPoint site 2 2026-10-26
Illinois Quantum and Microelectronics Park (South Works) Chicago, Cook County Being built PsiQuantum / Related Midwest August 17, 2026 site 1 2026-10-26

Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.

What Chicago has decided 1 body, 12 decisions on the record

What the city has done about data centers: each body on its own row with its rating, open, case by case, restrictive or closed, never good or bad, and every vote, ordinance, moratorium or agreement one tap away, newest first, with its source.

BodyLevelRatingIn force untilLatest actActsVerified
Chicagocitycase by caseChicago Mayor Brandon Johnson signed an executive order for stricter data center regulations. cbsnews.com (opens in a new tab) national outlet Aug 11, 202612 acts on this row
Every act on the Chicago row
  1. moratorium

    Alderman Bill Conway introduced an ordinance that would add additional regulations for data centers and ban them in some districts, though it stops short of a citywide moratorium.

    blockclubchicago.org (opens in a new tab) local outlet

  2. moratorium

    Mayor Brandon Johnson introduced an ordinance to Chicago City Council to pause construction of any new data center for 12 months and block material expansion of existing ones.

    blockclubchicago.org (opens in a new tab) local outlet

    Also reported by 1 source

Last verified September 23, 2026.

122026-09-23

Reported: the source's date; the item names no day of its own. A month with no day: the source names the month and not the day. A rating rests only on a binding act in force; "not rated" means no person has set one. Blank cell: no end date or count on the record for that column.

The rules across Illinois · Report missing data or a local act

What happened

  1. Now proposedIllinois Quantum and Microelectronics Park (South Works)

    Locals rallied against a Chicago quantum park development and the company committed to not including a data center.

Illinois, year by year

What was said

Illinois experiencing higher electric bills directly translated from datacenter electricity consumption
Chicago Tribune Editorial Board · September 10, 2026 · paraphrased · Chicago Tribune (opens in a new tab) local outlet
Austin C. said build data centers only in communities where median home price is above $3 million, make them build their own power source not connected to public grid, give no tax breaks, and enact strict environmental protections.
Austin C., Chicago resident · September 5, 2026 · paraphrased · Chicago Sun-Times (opens in a new tab) local outlet
Mitch Milenkovic, Mayor of Stickney, stated opposition to a data center at Hawthorne Race Course, citing water and power demand, noise, and nuisances
Mitch Milenkovic, Mayor of Stickney · August 21, 2026 · paraphrased · chicago.suntimes.com (opens in a new tab) local outlet
Brad Tietz, state policy director of the Data Center Coalition, said he is hopeful the mayor's directive will separate responsible water and energy stewards from those who are not
Brad Tietz, state policy director of the Data Center Coalition · August 13, 2026 · paraphrased · live-news-wttw.pantheonsite.io (opens in a new tab) local outlet

View all 17 Illinois statements on the record →

13 more on this page, one per speaker and claim; 17 statements in all

Adam A. said if data centers can supply their own power to regulatory spec they could be built but must address infrastructural and environmental concerns and taxpayers and ComEd customers should not bear any costs.

Chicago resident Chicago Sun-Times (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Chicago Sun-Times (opens in a new tab).

Alyce L. said data centers should not be built, especially in heavily populated areas, and statistics are coming in about adverse impacts on wildlife, people, businesses, communities and natural resources.

Chicago resident Chicago Sun-Times (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Chicago Sun-Times (opens in a new tab).

Deborah B. said Great Lakes are at risk of depletion and pollution, electricity rates will skyrocket, and data centers cause noise, light, air and water pollution, ruin wetlands and kill wildlife, and negatively impact property values.

Chicago resident Chicago Sun-Times (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: Chicago Sun-Times (opens in a new tab).

The county and nearby counties

The county Cook County: its decisions and every record in it.
22 miles away Lake County: 2 data centers on the record. A pause is on the record.
23 miles away DuPage County: 10 data centers on the record.
35 miles away Will County: 1 data center on the record.
40 miles away Kane County: 2 data centers on the record.

Distances run between the centers the Census Bureau gives each place. Every Illinois county.

Disclosed figures

40 jobs

Power, water, jobs and tax, summed only where a data center disclosed the figure; what each facility is for; how each is cooled. Nothing here is estimated.

Power, water, jobs and tax

FigureDisclosed totalDisclosedWithout a figureBasis
Power011
Water, stated per day011
Water, stated per year011
Permanent jobs40 jobs292 what a permit allows
Tax each year011

A blank total means no record disclosed the figure; the count without one says how many.

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

By what the facilities are for

UseRecordsPowerWaterJobsTax each year
No stated use1140 jobs

A blank cell means no record with that use disclosed the figure.

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

What the facilities are for

No source on file states what any of the 11 tracked facilities in Chicago are for.

How the facilities are cooled

No source on file states how any of the 11 tracked facilities in Chicago are cooled.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Only what a source states, with its basis. Nothing is estimated, and a figure no source gives reads not disclosed.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Data centers in Chicago, Cook County, Illinois", https://datacenterrecord.org/states/il/cook-county/chicago, updated November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Data center records in Chicago, Cook County, Illinois", https://datacenterrecord.org/states/il/cook-county/chicago. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Level
city
Census GEOID
1714000
Census geography
Incorporated place, Chicago city
Rating
Case by case