Boise has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Boise yet. Boise County's own decisions are on the Boise County page.
How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.
The data center in Boise
Each row is one site with its stage, its latest dated entry and what its sources disclose. A figure no source gives reads Not disclosed.
ValorC3 Boise Data Center
Boise, Boise County · ValorC3
Latest, reported September 10, 2026: ValorC3 Boise data center built in 2020 using hybrid cooling godatacenters.com local outlet
- Land
- 92 acresthird party estimate
- Power
- 14 MW
- Water
- Not disclosed
- Tenant
- Not disclosed
Where
Drag with one finger to move the map, pinch to zoom. Tap a pin for the data center, a county for its rules
1 data center in Boise: proposed. A dashed edge means the exact site is not in the public record; every pin here marks a town or the county.
What happened
-
· ValorC3 Boise Data Center
Now reported: ValorC3 Boise data center built in 2020 using hybrid cooling godatacenters.com local outlet
What was said
Boise Mayor Lauren McLean stated opposition to proposed data center on federal land south of Boise, calling sale of public lands shortsighted and calling for statewide framework protecting natural resources.
Disclosed figures
14 MW power
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Not disclosed | Basis | |
|---|---|---|---|---|---|
| Power | 14 MW | 1 | 0 | 1 the developer's figure | |
| Water, stated per day | Not disclosed | 0 | 1 | Not disclosed by any of the 1 record | |
| Water, stated per year | Not disclosed | 0 | 1 | Not disclosed by any of the 1 record | |
| Permanent jobs | Not disclosed | 0 | 1 | Not disclosed by any of the 1 record | |
| Tax each year | Not disclosed | 0 | 1 | Not disclosed by any of the 1 record |
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year | |
|---|---|---|---|---|---|---|
| Not disclosed | 1 | 14 MW | Not disclosed | Not disclosed | Not disclosed | Not disclosed: water, jobs, tax each year |
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Boise is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Boise is cooled.
Cite this page
Data Center Record, "Data centers in Boise, Boise County, Idaho", https://datacenterrecord.org/states/id/boise-county/boise, updated October 6, 2026.
Cite this page
Data Center Record, "Data center records in Boise, Boise County, Idaho", https://datacenterrecord.org/states/id/boise-county/boise. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
The rows here are part of the Idaho export.
For researchers
- Place id
- us/id/boise-county/boise
- Level
- city
- Census GEOID
- Not disclosed
- Rating value
- Not disclosed
- Scale word
- Not disclosed