Data centers in Boise, Idaho

Boise has 1 data center on the record; it is proposed. No city rule about data centers is on the record for Boise yet. Boise County's own decisions are on the Boise County page.

Updated · Every line below links to its source · How the record works

How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.

The data center in Boise

Each row is one site with its stage, its latest dated entry and what its sources disclose. A figure no source gives reads Not disclosed.

  1. Reported Built from one source

    ValorC3 Boise Data Center

    Boise, Boise County · ValorC3

    Latest, reported September 10, 2026: ValorC3 Boise data center built in 2020 using hybrid cooling godatacenters.com local outlet

    Land
    92 acresthird party estimate
    Power
    14 MW
    Water
    Not disclosed
    Tenant
    Not disclosed

Where

1 data center in Boise: proposed. A dashed edge means the exact site is not in the public record; every pin here marks a town or the county.

The outline is Boise's boundary from the U.S. Census Bureau. Tap a pin for that data center's facts and a link to its page.

What happened

  1. · ValorC3 Boise Data Center

    Now reported: ValorC3 Boise data center built in 2020 using hybrid cooling godatacenters.com local outlet

Idaho, year by year · Every milestone, by month

What was said

Boise Mayor Lauren McLean stated opposition to proposed data center on federal land south of Boise, calling sale of public lands shortsighted and calling for statewide framework protecting natural resources.
Lauren McLean, Boise Mayor · September 23, 2026 · paraphrased · KBOI local outlet

Every Idaho statement, by speaker

Disclosed figures

14 MW power

Power, water, jobs and tax, summed only where a data center disclosed the figure; what each facility is for; how each is cooled. Nothing here is estimated.

Power, water, jobs and tax

FigureDisclosed totalDisclosedNot disclosedBasis
Power14 MW101 the developer's figure
Water, stated per dayNot disclosed01Not disclosed by any of the 1 record
Water, stated per yearNot disclosed01Not disclosed by any of the 1 record
Permanent jobsNot disclosed01Not disclosed by any of the 1 record
Tax each yearNot disclosed01Not disclosed by any of the 1 record

Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.

By what the facilities are for

UseRecordsPowerWaterJobsTax each year
Not disclosed114 MWNot disclosedNot disclosedNot disclosedNot disclosed: water, jobs, tax each year

A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.

What the facilities are for

No source on file states what any of the 1 tracked facility in Boise is for.

How the facilities are cooled

No source on file states how any of the 1 tracked facility in Boise is cooled.

Cite this page

Data Center Record, "Data centers in Boise, Boise County, Idaho", https://datacenterrecord.org/states/id/boise-county/boise, updated October 6, 2026.

Cite this page

Data Center Record, "Data center records in Boise, Boise County, Idaho", https://datacenterrecord.org/states/id/boise-county/boise. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

The rows here are part of the Idaho export.

For researchers
Place id
us/id/boise-county/boise
Level
city
Census GEOID
Not disclosed
Rating value
Not disclosed
Scale word
Not disclosed