TierPoint Fort Worth Data Center

Street address 13701 Independence Pkwy, Fort Worth, TX 76177, Tarrant County permit coordinates Exact, the point of the EPA's facility record [2] echo.epa.gov

Overview, regulatory gates and specifications

TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935). [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from primary EPA ECHO or operator record. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
TCEQ 30 TAC 106.511 Stationa
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 13701 Independence Pkwy, Fort Worth, TX 76177.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] tierpoint.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
TierPoint as stated by the source
Permitted legal entity
TierPoint Texas Operations what a permit allows
[2] echo.epa.gov
State permit status
TCEQ 30 TAC 106.511 Stationary Emergency Generator Permit by Rule and EPA ECHO Facility Registry Record (13701 Independence Pkwy, Fort Worth, TX 76177) the state's permit register, last verified November 9, 2026
[2] echo.epa.gov
Official project website
tierpoint.com (opens in a new tab) verified October 28, 2026
tierpoint.com (opens in a new tab)
Archived promotional websites
tierpoint.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: TierPoint · Applicant / Shell LLC: TierPoint
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for TierPoint Fort Worth Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] tierpoint.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Tarrant County and Fort Worth about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Fort Worth Fort Worth Data Center and Infrastructure Commission presented its interim policy recommendations to the Fort Worth City Council on November 3, 2026 ahead of the November 10, 2026 council public hearing on data center zoning and moratorium rules. yahoo.com (opens in a new tab)
Tarrant County Tarrant County Precinct 3 Commissioner Matt Krause convened a public town hall in Hurst on September 8, 2026 with 23 public speakers addressing data center zoning, grid reliability and water use across Northeast Tarrant County. keranews.org (opens in a new tab)
Fort Worth Fort Worth City Council appointed the 11 voting members of the Data Center and Infrastructure Commission on September 3, 2026 to evaluate data center impacts on electric transmission, water supply, noise setbacks and tax abatement policy. fortworthreport.org (opens in a new tab)
Keller Keller City Council adopted a unanimous resolution on August 12, 2026 opposing the adjacent Town of Westlake 1 million square foot Circle T Ranch data center campus due to residential proximity, noise and regional transmission impacts. newsweek.com (opens in a new tab)
Fort Worth After three hours of public testimony from more than 100 speakers on August 11, 2026, the Fort Worth City Council voted unanimously on a motion by Council Member Elizabeth Beck to initiate a 90 day moratorium process on data center rezonings and permits and establish an 11 member Data Center and Infrastructure Commission. therealdeal.com (opens in a new tab)
August 26, 2026 Fort Worth, TX Fort Worth site plan for data center brings more debate among residents Fort Worth City Council 2 clips

CBS TEXAS report on Fort Worth City Council and community proceedings in Fort Worth, TX: Fort Worth site plan for data center brings more debate among residents (August 26, 2026).

  1. CBS TEXAS Broadcast Report Broadcast Report transcribed from local broadcast report
    "They have. Good morning carmen. Now we're talking about the black mountain data center. And this was actually approved by the city council last year before the city took steps towards a moratorium, a kaa pause at last night's city council meeting. They did vote to approve an amendment that would add more distance between the data center and homes. Take a listen to some of those comments at last night's meeting. Brings far more negatives"
  2. CBS TEXAS Broadcast Report Broadcast Report transcribed from local broadcast report
    "Think about our needs as residents of Fort Worth. I'm not for or against data centers. I'm worried about the zoning, what they want in the zoning is more than what they ask for. Data centers are here to stay. We can get on the winning team. We can stay behind. We can gripe, we complain. Our next. A lot of thoughts and a lot of emotions at yesterday's meeting. Ultimately, the city council voted to approve those"
August 11, 2026 Fort Worth, TX Fort Worth City Council Unanimous Vote Initiating 90 Day Data Center Moratorium Fort Worth City Council 3 clips

After three hours of public testimony from more than 100 speakers on August 11, 2026, the Fort Worth City Council voted unanimously on a motion by Council Member Elizabeth Beck to initiate a 90 day moratorium on data center rezoning and permits.

  1. CBS TEXAS Broadcast Report Broadcast Report transcribed from local broadcast report
    "Continues of trevor, north texas, residents just pushing back on these projects. Yeah, madison, we have seen people pack into city council meetings just like the one last night in order to argue against data center development right in their backyard. This time, it took about three hours to get through all the public comment before the city council unanimously voted to enact this moratorium process. I've got a motion by council member back in a second by dr."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Fort Worth currently has four data center developments with ten buildings across the city. The moratorium will last 90 days and pause all rezoning and permit applications. During that time, city staff would study noise issues, water supply concerns and possible code changes for future development. City council is also voting to create a commission to study the impacts of data centers. It would look at economic benefits weighed against incentives for developers, a final report and recommendation would go in front"
  3. CBS TEXAS Broadcast Report Broadcast Report transcribed from local broadcast report
    "Match the public comment. Worries over water use, noise and environmental impacts. The people here in Fort Worth are the only ones who can tell you what they're willing to put up with, what they're afraid of and what they want to see happen. We can be known for the leader of data center regulation while keeping our citizens safe. Our mental health positive in keeping our physical health from"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 24, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from primary EPA ECHO or operator record.

    [2] echo.epa.gov

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
QTS Fort Worth Fort Worth, Tarrant County Less than 1 mi Running QTS Data Centers 2 buildings
Meta Fort Worth Data Center Fort Worth, Tarrant County 3 mi Running Meta 260 acres
Rackspace Dallas Grapevine (DFW1) Grapevine, Tarrant County 9 mi Running Rackspace 1 building
CyrusOne Lewisville DFW2 Lewisville, Denton County 15 mi Running CyrusOne 1 building
Centersquare Fort Worth data center Fort Worth, Tarrant County 16 mi Running Centersquare 1 building
Digital Realty DFW26 Lewisville, Denton County 16 mi Running Digital Realty 1 building

Blank cell: not disclosed by any source on file.

Common questions about TierPoint Fort Worth Data Center

Answered directly from the verified filings and local actions on this page.

Who is building TierPoint Fort Worth Data Center?

TierPoint is the developer. No construction contractor is named on the record yet.

How much power and water does TierPoint Fort Worth Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does TierPoint Fort Worth Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Fort Worth or Tarrant County decided about it?

Fort Worth: Fort Worth Data Center and Infrastructure Commission presented its interim policy recommendations to the Fort Worth City Council on November 3, 2026 ahead of the November 10, 2026 council public hearing on data center zoning and moratorium rules, yahoo.com (opens in a new tab); and Tarrant County: Tarrant County Precinct 3 Commissioner Matt Krause convened a public town hall in Hurst on September 8, 2026 with 23 public speakers addressing data center zoning, grid reliability and water use across Northeast Tarrant County, keranews.org (opens in a new tab). 5 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. TierPoint: Data Center Locations (opens in a new tab), TierPoint
  2. EPA ECHO detailed facility report: Independence Pkwy Data Center Fort Worth (opens in a new tab), U.S. Environmental Protection Agency

2 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "TierPoint Fort Worth Data Center", https://datacenterrecord.org/projects/tierpoint-dallas-forth-worth-fort-worth-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "TierPoint Fort Worth Data Center", https://datacenterrecord.org/projects/tierpoint-dallas-forth-worth-fort-worth-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
32.97985, -97.25112
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110033431935) and TierPoint data center directory at 13701 Independence Pkwy, Fort Worth, Tarrant County, Texas.
Coordinate source
EPA ECHO FRS ID 110033431935
Published
October 21, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · TierPoint Fort Worth Data Center · 2 sources, 1 entry, 5 decisions nearby · basis and source tier on every row · verified November 9, 2026