Data Center Record.
Census GEOID: 13077 Location Precision: assessor parcel Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Proposed Campus Announced October 3, 2024 · 8 Buildings · North Coweta Investors, LLC

Project Peach Data Center Campus (Coweta County, DRI #4301)

Street address 300 Johnston Cir, Palmetto, GA 30268, Coweta County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

North Coweta Investors, LLC filed Georgia DCA DRI #4301 on October 3, 2024 for Project Peach, an 8 building, 2,100,000 square foot data center campus on 320 acres at 300 Johnston Circle in northern Coweta County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4301 regional review filing. [1]

1. Land & Parcel
320 acres on file
2. Local Zoning
In local review
3. Tax & EDA Deal
$3,000,000/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4301 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
105,000 gal/day
the developer's figure

Equivalent to ~350 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $3,000,000.

Site & Buildings [2]
320 acres
the developer's figure

8 planned or operational data hall buildings.

Location: 300 Johnston Cir, Palmetto, GA 30268.

Taxes & Permanent Jobs [1]
$3,000,000/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $3,000,000.

Key specifications on the record

Power capacity
Not disclosed
Water usage
105,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 350 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 350 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
320 acres developer figure
[2] apps.dca.ga.gov
Buildings
8 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
North Coweta Investors, LLC as stated by the source
[1] apps.dca.ga.gov
Tax each year
$3,000,000 the developer's figure
Permitted legal entity
North Coweta Investors, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4301 state air permit register
State permit status
Georgia DCA DRI #4301 regional review filing the state's permit register, as of October 3, 2024, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Project Peach Data Center Campus (Coweta County, DRI #4301), water: 105,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 105,000 ÷ 300 = 350 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: North Coweta Investors, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Peach Data Center Campus (Coweta County, DRI #4301).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 320 acres 320 acres the developer's figure [2] apps.dca.ga.gov
Data Hall Buildings 8 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 105,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $3,000,000/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

What was decided

Acts of Coweta County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Coweta County case by case Before a packed chamber on December 16, 2025, the Coweta County Board of Commissioners voted 4 to 1, with Commissioner Bill McKenzie dissenting, to adopt a county data center ordinance setting noise, water, land buffer, and building design rules. coweta.ga.us (opens in a new tab)
December 16, 2025 Newnan, GA Coweta County Board of Commissioners Data Center Ordinance Vote Coweta County Board of Commissioners 3 clips

Before a packed chamber on December 16, 2025, the Coweta County Board of Commissioners voted 4 to 1, with Commissioner Bill McKenzie dissenting, to adopt a county data center ordinance setting noise, water, land buffer, and building design rules.

  1. WSB TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "We have done that a chairman chairman. Sounds of disappointment came from the crowd before Kawita County commissioners voted to approve a data center ordinance. All in favor say I. I. Commissioner Bill McKenzie was the only one to vote against the ordinance. It puts guidelines in place on data center noise, land, and water usage as well as building design. I think the ordinances are more than"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "enough to protect their health, water, electricity, and property values. They're arrogant and they don't listen to the people. Commissioners started designing a data center ordinance when a California based tech company submitted an application to build a campus near Wagers Mill Road. Skin Edge represents the property owner. The taxes that can be brought in from a data center project are huge. Neighbors pointed out this land is a conservation zone."
  3. WSB TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "Commissioners paused any construction until they agreed on an ordinance that established guidelines. And each draft was open to public comment. You do not serve the developers. You serve us. Data centers and AI are the next wave. A tsunami we cannot stop. Seven months later, the final draft passed, but the division remains. This is one of the best deals that come to Kawira. It come once in a great while."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    North Coweta Investors, LLC filed Georgia DCA DRI #4301 on October 3, 2024 for Project Peach, an 8 building, 2,100,000 square foot data center campus on 320 acres at 300 Johnston Circle in northern Coweta County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
T5 Data Centers Atlanta IV Campus (Coweta County, DRI #4079) Coweta County Less than 1 mi Proposed T5 Data Centers 7 buildings
Microsoft Palmetto Data Center (CCO06) Palmetto, Fulton County 3 mi Running Microsoft 2 buildings
Fairburn Technology Center (DRI #4213) Fairburn, Fulton County 5 mi Proposed Bohannon Road Venture, LLC 59.6 acres
T5 Data Centers Fairburn Campus Fairburn, Fulton County 6 mi Proposed T5 Data Centers 2 buildings
Central Coweta Industrial Phase II Data Center Campus (DRI #4374) Coweta County 6 mi Proposed Central Coweta Industrial, LLC 8 buildings
QTS Atlanta Metro Fayetteville (ATL2) Fayetteville, Fayette County 9 mi Running QTS Data Centers 16 buildings

Blank cell: not disclosed by any source on file.

Common questions about Project Peach Data Center Campus (Coweta County, DRI #4301)

Answered directly from the verified filings and local actions on this page.

Who is building Project Peach Data Center Campus (Coweta County, DRI #4301)?

North Coweta Investors, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Project Peach Data Center Campus (Coweta County, DRI #4301) say it needs?

Power: not disclosed by any source on file. Water: 105,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Project Peach Data Center Campus (Coweta County, DRI #4301) stand today?
What has Coweta County decided about it?

Coweta County (rated case by case): Before a packed chamber on December 16, 2025, the Coweta County Board of Commissioners voted 4 to 1, with Commissioner Bill McKenzie dissenting, to adopt a county data center ordinance setting noise, water, land buffer, and building design rules, coweta.ga.us (opens in a new tab). 1 event is on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4301 Application Summary (Project Peach Data Center Campus (Coweta County, DRI #4301)) (opens in a new tab), Georgia Department of Community Affairs, October 3, 2024
  2. Georgia DCA DRI #4301 Initial Form (Project Peach Data Center Campus (Coweta County, DRI #4301)) (opens in a new tab), Georgia Department of Community Affairs, October 3, 2024

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Project Peach Data Center Campus (Coweta County, DRI #4301)", https://datacenterrecord.org/projects/georgia-dri-4301-project-peach-ga, last verified October 3, 2024. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Project Peach Data Center Campus (Coweta County, DRI #4301)", https://datacenterrecord.org/projects/georgia-dri-4301-project-peach-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.502268, -84.667114
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4301
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4301
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
October 3, 2024
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Project Peach Data Center Campus (Coweta County, DRI #4301) · 2 sources, 1 entry, 1 decision nearby · basis and source tier on every row · verified October 3, 2024

Download CSV JSON