Data Center Record.
Census GEOID: 13121 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 primary and local sources

● Being Built Announced May 6, 2025 · 1 Building · Vantage Data Centers

Vantage Data Centers Atlanta GA2 Campus (Westlake)

Street address 6585 Plummer Rd SW, South Fulton, GA 30331, Fulton County permit coordinates Exact, the point of the EPA's facility record [3] air.gaepd.org

Overview, regulatory gates and specifications

Vantage Data Centers GA2, LLC received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0982 (S 01 to 0) on May 6, 2025 following Georgia DCA DRI #4256 review for its Westlake campus at 6585 Plummer Road SW in Fulton County. [3] Filings on the record specify 1 planned or operational building. [3] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-121-0982 (S 01-0) issued. [3]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
$7,397,400/yr stated
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia EPD Air Quality Perm
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
4,380 gal/day
the developer's figure

Equivalent to ~15 U.S. households (U.S. EPA 300 gal/day household baseline).

Stated annual local tax revenue: $7,397,400.

Site & Buildings [1]
1 building
GA EPD Air Quality Permit and DRI filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 6585 Plummer Rd SW, South Fulton, GA 30331.

Taxes & Permanent Jobs [1]
$7,397,400/yr
the developer's figure

Permanent operational headcount not yet disclosed on the record.

Stated annual local tax revenue: $7,397,400.

Key specifications on the record

Power capacity
Not disclosed
Water usage
4,380 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 15 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 15 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
1 building permitted
apps.dca.ga.gov (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Vantage Data Centers attributed via corporate HQ or property filing
[3] air.gaepd.org
Tax each year
$7,397,400 the developer's figure
Permitted legal entity
Vantage Data Centers GA2, LLC what a permit allows
[3] air.gaepd.org
State air permit registration
GA EPD AIRS 121-00982, GA EPD Permit 7374-121-0982-S-01-0, EPA FRS 110071958049, Georgia DCA DRI #4256 state air permit register
State permit status
Georgia EPD Air Quality Permit No. 7374-121-0982 (S 01-0) issued the state's permit register, as of May 6, 2025, last verified November 11, 2026
[3] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs
The math behind the comparison
  1. Vantage Data Centers Atlanta GA2 Campus (Westlake), water: 4,380 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 4,380 ÷ 300 = 14.6 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Vantage Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Vantage Data Centers Atlanta GA2 Campus (Westlake).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building GA EPD Air Quality Permit and DRI filing
Cooling & Water System 4,380 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue $7,397,400/yr the developer's figure

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

What was decided

Acts of Fulton County and South Fulton about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Atlanta case by case Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks theatlantavoice.com (opens in a new tab)
Atlanta case by case Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives. fox5atlanta.com (opens in a new tab)
Atlanta case by case The City of Atlanta established a Data Center Task Force to evaluate municipal zoning, grid load and neighborhood rules for urban data centers. usatoday.com (opens in a new tab)
Atlanta case by case Communities placing moratoriums on data center development citing concerns about power and water usage, traffic, environmental impacts and noise wsbradio.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    Vantage Data Centers GA2, LLC received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0982 (S 01 to 0) on May 6, 2025 following Georgia DCA DRI #4256 review for its Westlake campus at 6585 Plummer Road SW in Fulton County.

    [3] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Aligned ATL-01 Lithia Springs, Douglas County 2 mi Running Aligned Data Centers 180 MW
Microsoft Douglasville Data Center Campus (FTY01 / FTY02) Douglasville, Douglas County 2 mi Running Microsoft 3 buildings
Flexential Atlanta Douglasville (ATL5) Douglasville, Douglas County 3 mi Running Flexential 22.5 MW
DC BLOX Atlanta West Campus (Douglasville) Douglasville, Douglas County 3 mi Being built DC BLOX 2 buildings
Google Douglas County Data Center Lithia Springs, Douglas County 3 mi Running Google 3 buildings
Rock House Road Data Center Campus (DRI #4078) Lithia Springs, Douglas County 3 mi Proposed Taylor & Mathis 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Vantage Data Centers Atlanta GA2 Campus (Westlake)

Answered directly from the verified filings and local actions on this page.

Who is building Vantage Data Centers Atlanta GA2 Campus (Westlake)?

Vantage Data Centers is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Vantage Data Centers Atlanta GA2 Campus (Westlake) say it needs?

Power: not disclosed by any source on file. Water: 4,380 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Vantage Data Centers Atlanta GA2 Campus (Westlake) stand today?
What has South Fulton or Fulton County decided about it?

Atlanta (rated case by case): Atlanta City Council introduced new legislation aimed at regulating local data centers and eliminating their tax breaks (reported August 26, 2026, theatlantavoice.com (opens in a new tab)); and Atlanta: Atlanta City Council members introduced zoning ordinances restricting data centers near transit stations and the BeltLine corridor and barring local tax incentives (August 20, 2026, fox5atlanta.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO Detailed Facility Report (110071958049) (opens in a new tab), U.S. Environmental Protection Agency, May 6, 2025
  2. Georgia DCA DRI #4256 Application Summary (Vantage Data Centers Atlanta GA2 Campus (Westlake)) (opens in a new tab), Georgia Department of Community Affairs, May 6, 2025

Reporting

  1. Georgia EPD Air Quality Permit 7374-121-0982-S-01-0 (Vantage Data Centers Atlanta GA2 Campus (Westlake)) (opens in a new tab), Georgia Environmental Protection Division, May 6, 2025, news outlet

3 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Vantage Data Centers Atlanta GA2 Campus (Westlake)", https://datacenterrecord.org/projects/georgia-dri-4256-vantage-data-center-westlake-ga, last verified May 6, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Vantage Data Centers Atlanta GA2 Campus (Westlake)", https://datacenterrecord.org/projects/georgia-dri-4256-vantage-data-center-westlake-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.70729, -84.5822
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-29506
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110071958049
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
May 6, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Vantage Data Centers Atlanta GA2 Campus (Westlake) · 3 sources, 1 entry, 4 decisions nearby · basis and source tier on every row · verified May 6, 2025

Download CSV JSON