EdgeConneX operates its 12 MW DEN01 edge colocation data center at 8535 Highfield Parkway in Englewood, Douglas County, Colorado. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Colorado state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 8535 Highfield Parkway, Englewood, CO 80112.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Denver Englewood Data Center (EDCDEN01).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 12 MW | 12 MW | the developer's figure [1] edgeconnex.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] edgeconnex.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Douglas County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Douglas County | Douglas County took a new data center approach | govtech.com (opens in a new tab) | |
| Douglas County | Tax rebate agreement provides 100% rebate for Douglas County's share of business personal property taxes over 35 years | denvergazette.com (opens in a new tab) | |
| Douglas County | Douglas County commissioners to consider $19.3 million tax rebate for Flexential data center in Parker | denvergazette.com (opens in a new tab) | |
| Douglas County | Douglas County commissioners directed staff to explore cost of feasibility study on small modular nuclear reactors and microreactors to meet AI and data center power needs | cbsnews.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Colorado state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
· City
Postal mailing address city is not a Census place in Douglas County; filed at the county level per place-geoid-fixes-1016.
Every correction on the record is on the corrections page.
Verified data center records in Colorado within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Parker Highfield Parkway Data Center Campus Parker, Douglas County | Less than 1 mi | Proposed | Compark / Highfield Data Center Developer | 2 buildings |
| OneNeck IT Solutions Englewood Data Center Douglas County | Less than 1 mi | Running | OneNeck IT Solutions | 6 MW |
| Flexential Englewood Compark Data Center (DEN02) Parker, Douglas County | Less than 1 mi | Running | Flexential | 14 MW |
| Equinix DE2 Englewood Data Center Englewood, Arapahoe County | 2 mi | Running | Equinix | 10 MW |
| DataBank Denver Englewood Data Center (DEN1) Denver, Denver County | 2 mi | Running | DataBank | 9 MW |
| DataBank Centennial Campus (DEN2 and DEN5) Centennial, Arapahoe County | 2 mi | Running | DataBank | 20 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
EdgeConneX is the developer. No construction contractor is named on the record yet.
Power: 12 MW (the developer's figure, edgeconnex.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Douglas County (rated case by case): Douglas County took a new data center approach (reported August 12, 2026, govtech.com (opens in a new tab)); and Douglas County: Tax rebate agreement provides 100% rebate for Douglas County's share of business personal property taxes over 35 years (reported August 11, 2026, denvergazette.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the WECC Rockies (RMPA) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. EdgeConneX Denver Englewood Data Center (EDCDEN01). Last verified October 27, 2026. https://datacenterrecord.org/projects/edgeconnex-denver-edcden01-englewood-co. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about EdgeConneX Denver Englewood Data Center (EDCDEN01)
Data Center Record, "EdgeConneX Denver Englewood Data Center (EDCDEN01)", https://datacenterrecord.org/projects/edgeconnex-denver-edcden01-englewood-co. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.