Data Center Record.
Census GEOID: 08035 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 1 Building · EdgeConneX

EdgeConneX Denver Englewood Data Center (EDCDEN01)

Street address 8535 Highfield Parkway, Englewood, CO 80112, Douglas County verified address Exact, at the address [1] edgeconnex.com

Overview, regulatory gates and specifications

EdgeConneX operates its 12 MW DEN01 edge colocation data center at 8535 Highfield Parkway in Englewood, Douglas County, Colorado. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Colorado state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
12 MW
the developer's figure

Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 8535 Highfield Parkway, Englewood, CO 80112.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
12 MW developer figure Equivalent to the continuous electricity demand of about 9,960 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
[1] edgeconnex.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] edgeconnex.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
EdgeConneX as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. EdgeConneX Denver Englewood Data Center (EDCDEN01), capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0.0012 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: EdgeConneX
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Denver Englewood Data Center (EDCDEN01).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 12 MW 12 MW the developer's figure [1] edgeconnex.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] edgeconnex.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Douglas County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Douglas County case by case Douglas County took a new data center approach govtech.com (opens in a new tab)
Douglas County case by case Tax rebate agreement provides 100% rebate for Douglas County's share of business personal property taxes over 35 years denvergazette.com (opens in a new tab)
Douglas County case by case Douglas County commissioners to consider $19.3 million tax rebate for Flexential data center in Parker denvergazette.com (opens in a new tab)
Douglas County case by case Douglas County commissioners directed staff to explore cost of feasibility study on small modular nuclear reactors and microreactors to meet AI and data center power needs cbsnews.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Colorado state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] edgeconnex.com

1 correction to this record

Every correction, with its reason
  1. · City

    Postal mailing address city is not a Census place in Douglas County; filed at the county level per place-geoid-fixes-1016.

Every correction on the record is on the corrections page.

Nearest data centers in Colorado

Verified data center records in Colorado within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Parker Highfield Parkway Data Center Campus Parker, Douglas County Less than 1 mi Proposed Compark / Highfield Data Center Developer 2 buildings
OneNeck IT Solutions Englewood Data Center Douglas County Less than 1 mi Running OneNeck IT Solutions 6 MW
Flexential Englewood Compark Data Center (DEN02) Parker, Douglas County Less than 1 mi Running Flexential 14 MW
Equinix DE2 Englewood Data Center Englewood, Arapahoe County 2 mi Running Equinix 10 MW
DataBank Denver Englewood Data Center (DEN1) Denver, Denver County 2 mi Running DataBank 9 MW
DataBank Centennial Campus (DEN2 and DEN5) Centennial, Arapahoe County 2 mi Running DataBank 20 MW

Blank cell: not disclosed by any source on file.

Common questions about EdgeConneX Denver Englewood Data Center (EDCDEN01)

Answered directly from the verified filings and local actions on this page.

Who is building EdgeConneX Denver Englewood Data Center (EDCDEN01)?

EdgeConneX is the developer. No construction contractor is named on the record yet.

How much power and water does EdgeConneX Denver Englewood Data Center (EDCDEN01) say it needs?

Power: 12 MW (the developer's figure, edgeconnex.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does EdgeConneX Denver Englewood Data Center (EDCDEN01) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Douglas County decided about it?

Douglas County (rated case by case): Douglas County took a new data center approach (reported August 12, 2026, govtech.com (opens in a new tab)); and Douglas County: Tax rebate agreement provides 100% rebate for Douglas County's share of business personal property taxes over 35 years (reported August 11, 2026, denvergazette.com (opens in a new tab)). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. EdgeConneX Denver Englewood Data Center (EDCDEN01) Official Disclosure (opens in a new tab), EdgeConneX, news outlet

1 source on file.

Regional grid context

This site is in the WECC Rockies (RMPA) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "EdgeConneX Denver Englewood Data Center (EDCDEN01)", https://datacenterrecord.org/projects/edgeconnex-denver-edcden01-englewood-co, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "EdgeConneX Denver Englewood Data Center (EDCDEN01)", https://datacenterrecord.org/projects/edgeconnex-denver-edcden01-englewood-co. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.561073, -104.826671
How the location is known
Location from the site's street address.
Location source
https://www.edgeconnex.com/locations/americas/denver-co/
Coordinate source
Douglas County Assessor / EdgeConneX
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · EdgeConneX Denver Englewood Data Center (EDCDEN01) · 1 source, 1 entry, 4 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON