● Being Built Recorded June 6, 2025 · 1 Building

DataBank Atlanta Boulder Park Campus (ATL5)

Street address 4762 Bakers Ferry Rd SW, Atlanta, GA 30336, Fulton County permit coordinates Exact, the point of the EPA's facility record [2] air.gaepd.org

Overview, regulatory gates and specifications

DB Data Center Boulder Park, LLC (DataBank ATL5) received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0984 (S 01 to 0) on June 6, 2025 for 74 backup diesel generators at 4762 Bakers Ferry Road SW in Atlanta, Fulton County. [2] Filings on the record specify disclosed capacity of 120 MW (the developer's figure), 1 planned or operational building. [2] On the regulatory record, state permit status is Georgia EPD Air Quality Permit No. 7374-121-0984 (S 01-0) issued. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
120 MW disclosed
5. Air & Water Permits
Georgia EPD Air Quality Perm
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [1]
120 MW
the developer's figure

Equivalent to ~99,600 U.S. homes (U.S. EIA 830 homes/MW baseline) · 5.8% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
GA EPD Air Quality Permit

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 4762 Bakers Ferry Rd SW, Atlanta, GA 30336.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
120 MW developer figure Equivalent to the continuous electricity demand of about 99,600 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
air.gaepd.org (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building permitted
[2] air.gaepd.org
Backup generators
74 generators permitted
[2] air.gaepd.org
Capital investment
Not disclosed
Who leads it
DataBank attributed via corporate HQ or property filing
[2] air.gaepd.org
Permitted legal entity
DB Data Center Boulder Park, LLC what a permit allows
[2] air.gaepd.org [2] air.gaepd.org
State air permit registration
GA EPD AIRS 121-00984, GA EPD Permit 7374-121-0984-S-01-0, EPA FRS 110071992728 state air permit register
[2] air.gaepd.org
State permit status
Georgia EPD Air Quality Permit No. 7374-121-0984 (S 01-0) issued the state's permit register, as of June 6, 2025, last verified November 11, 2026
[2] air.gaepd.org
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. DataBank Atlanta Boulder Park Campus (ATL5), capacity: 120 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 120 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: DataBank
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for DataBank Atlanta Boulder Park Campus (ATL5).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 120 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building GA EPD Air Quality Permit [2] air.gaepd.org
Cooling & Water System
Backup Diesel / Gas Generators 74 units what a permit allows [2] air.gaepd.org
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (content date)

    DB Data Center Boulder Park, LLC (DataBank ATL5) received Georgia EPD Synthetic Minor Air Quality Permit No. 7374-121-0984 (S 01 to 0) on June 6, 2025 for 74 backup diesel generators at 4762 Bakers Ferry Road SW in Atlanta, Fulton County.

    [2] air.gaepd.org

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Vantage Data Centers Atlanta GA2 Campus (Westlake) South Fulton, Fulton County 4 mi Being built Vantage Data Centers 1 building
Amazon Web Services Lithia Springs Campus (ATL068 / ATL078) Lithia Springs, Douglas County 4 mi Being built Amazon Web Services 2 buildings
Rock House Road Data Center Campus (DRI #4078) Lithia Springs, Douglas County 4 mi Proposed Taylor & Mathis 4 buildings
DC BLOX Atlanta West Campus (Douglasville) Douglasville, Douglas County 4 mi Being built DC BLOX 2 buildings
Flexential Atlanta Douglasville (ATL5) Douglasville, Douglas County 4 mi Running Flexential 22.5 MW
Microsoft Douglasville Data Center Campus (FTY01 / FTY02) Douglasville, Douglas County 4 mi Running Microsoft 3 buildings

Blank cell: not disclosed by any source on file.

Common questions about DataBank Atlanta Boulder Park Campus (ATL5)

Answered directly from the verified filings and local actions on this page.

Who is building DataBank Atlanta Boulder Park Campus (ATL5)?

DataBank is the developer, air.gaepd.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does DataBank Atlanta Boulder Park Campus (ATL5) say it needs?

Power: 120 MW (the developer's figure, air.gaepd.org (opens in a new tab)). Water: not disclosed by any source on file.

Where does DataBank Atlanta Boulder Park Campus (ATL5) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO Detailed Facility Report (110071992728) (opens in a new tab), U.S. Environmental Protection Agency, June 6, 2025

Reporting

  1. Georgia EPD Air Quality Permit 7374-121-0984-S-01-0 (DataBank Atlanta Boulder Park Campus (ATL5)) (opens in a new tab), Georgia Environmental Protection Division, June 6, 2025, news outlet

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "DataBank Atlanta Boulder Park Campus (ATL5)", https://datacenterrecord.org/projects/databank-boulder-park-atl5-atlanta-ga, last verified June 6, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "DataBank Atlanta Boulder Park Campus (ATL5)", https://datacenterrecord.org/projects/databank-boulder-park-atl5-atlanta-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
33.747436, -84.540278
How the location is known
Location from an EPA facility record.
Location source
https://air.gaepd.org/Permits/View/OP-29558
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110071992728
Location last verified
November 11, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
120 MW, the developer's figure
Published
November 11, 2026
Last verified
June 6, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · DataBank Atlanta Boulder Park Campus (ATL5) · 2 sources, 1 entry · basis and source tier on every row · verified June 6, 2025

Download CSV JSON