Data Center Record.
Census GEOID: 51069 Location Precision: city centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Proposed Campus Recorded October 2, 2025

Cardinal Energy Corporation

Street address 8209 Valley Pike, Middletown, Virginia 22645, Frederick County city centroid Town level, the center of the city [1] Virginia DEQ Air Permit 80941-6: Cardinal Energy Corporation (Cardinal Energy Corporation)

Overview, regulatory gates and specifications

Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Cardinal Energy Corporation, registration 80941 (permit action 80941-6), Frederick County, on October 2, 2025. The permit document authorizes 9 emergency backup generators totaling 20.91 MW of permitted backup generator rating at 8209 Valley Pike, Middletown, Virginia 22645. [1]

Verified Site & Permit Summary
Verified address
8209 Valley Pike, Middletown, Virginia 22645, Frederick County city centroid
Operator / developer
Not disclosed in filing
Permit / registry ID
undefined: undefined [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
9 generators (20.91 MW) permitted
[1] deq.virginia.gov
Capital investment
Not disclosed
Permitted legal entity
Cardinal Energy Corporation what a permit allows
[1] deq.virginia.gov [1] deq.virginia.gov
State air permit registration
80941 state air permit register
[1] deq.virginia.gov
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed · Applicant / Shell LLC: Cardinal Energy Corporation
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Cardinal Energy Corporation.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators 9 units (20.91 MW) what a permit allows [1] deq.virginia.gov
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Cardinal Energy Corporation, registration 80941 (permit action 80941-6), Frederick County, on October 2, 2025. The permit document authorizes 9 emergency backup generators totaling 20.91 MW of permitted backup generator rating at 8209 Valley Pike, Middletown, Virginia 22645.

    [1] deq.virginia.gov

Every event in order

Nearest data centers in Virginia

Verified data center records in Virginia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Amazon Data Services, DCA-51 Warrenton, Fauquier County ~31 mi Running Amazon Web Services 1 building
Yondr Data Center Aldie, Loudoun County ~36 mi Proposed Yondr Group
Amazon Data Services Inc IAD-124/125/126/127 Aldie, Loudoun County ~36 mi Proposed Amazon Web Services
Amazon Data Services, INC. IAD-55 IAD-64 IAD-84 Haymarket, Prince William County ~37 mi Running Amazon Web Services 2 buildings
Google Stonewall Business Park data center Leesburg, Loudoun County ~38 mi Running Google
Data Center Vint Hill LLC Warrenton, Fauquier County ~38 mi Running Data Center Vint Hill LLC

Blank cell: not disclosed by any source on file.

Common questions about Cardinal Energy Corporation

Answered directly from the verified filings and local actions on this page.

Who is building Cardinal Energy Corporation?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Cardinal Energy Corporation say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Cardinal Energy Corporation stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Virginia DEQ Air Permit 80941-6: Cardinal Energy Corporation (Cardinal Energy Corporation) (opens in a new tab), Virginia Department of Environmental Quality, October 2, 2025

1 source on file.

Regional grid context

This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Cardinal Energy Corporation", https://datacenterrecord.org/projects/cardinal-energy-frederick-80941-va, last verified October 2, 2025. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Cardinal Energy Corporation", https://datacenterrecord.org/projects/cardinal-energy-frederick-80941-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
39.0268, -78.2797
How the location is known
Location is the city center; exact site not disclosed.
Location source
https://www.deq.virginia.gov/home/showpublisheddocument/32400/638989963108100000
Coordinate source
city centroid
Location last verified
October 26, 2026
Published
November 1, 2026
Last verified
October 2, 2025
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Cardinal Energy Corporation · 1 source, 1 entry · basis and source tier on every row · verified October 2, 2025

Download CSV JSON