Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 3 primary and local sources
Amazon Web Services is constructing a 20 building data center campus at the Energy Way Industrial Park in Hamlet, Richmond County, North Carolina, after receiving North Carolina Department of Environmental Quality air quality permits in September 2026. [1] Filings on the record specify disclosed capacity of 1 GW (the developer's figure). [1] Amazon's North Carolina data center sought and received state approval for diesel generator permits amid community pushback over the use of diesel power. [1]
Equivalent to ~830,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 48% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: Energy Way, Hamlet, NC 28345.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Web Services Richmond County Data Center Campus.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 1 GW | the developer's figure | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 20 buildings | zoning application | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Amazon's North Carolina data center sought and received state approval for diesel generator permits amid community pushback over the use of diesel power.
deq.nc.gov (opens in a new tab) primary source
Every correction on the record is on the corrections page.
Verified data center records in North Carolina within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| CyrusOne Lee County Data Center Sanford, Lee County | 52 mi | Proposed | CyrusOne | 2 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Amazon Web Services is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 1 GW (the developer's figure, deq.nc.gov (opens in a new tab)). Water: not disclosed by any source on file.
It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, September 1, 2026: Amazon's North Carolina data center sought and received state approval for diesel generator permits amid community pushback over the use of diesel power.
No decision by Hamlet or Richmond County about data centers is on the record. The Richmond County page and the North Carolina scorecard list every rated row the day a person publishes one.
Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
3 sources on file.
This site is in the SERC Virginia and Carolina South (SRVC-S) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Amazon Web Services Richmond County Data Center Campus. Last verified October 27, 2026. https://datacenterrecord.org/projects/amazon-data-center-nc. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Amazon Web Services Richmond County Data Center Campus
Data Center Record, "Amazon Web Services Richmond County Data Center Campus", https://datacenterrecord.org/projects/amazon-data-center-nc. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.